Laserfiche WebLink
SEC. <br />29, <br />T. <br />29 <br />Nq <br />Eq <br />SEC, <br />bra2, <br />� � <br />29 <br />Nq <br />- <br />'�{ '. <br />Eq <br />WA. <br />n <br />a- <br />z <br />cn <br />0 <br />0 <br />t <br />0 <br />0 <br />0 <br />co <br />0 <br />N <br />N <br />�i <br />V <br />Q <br />s <br />i <br />0 <br />a <br />0 <br />-D <br />0_ <br />CL <br />0 <br />0 <br />E <br />0 <br />n <br />0 <br />co <br />0 <br />Mw <br />0 <br />z <br />E <br />u <br />IL <br />E <br />0 <br />co <br />N <br />O <br />Q <br />O <br />N <br />I <br />t:Zl <br />SILT JIN. <br />S1R�� <br />y <br />-STA 22+49 (68.8' RT) <br />- a a <br />i 3 � <br />i a <br />IT— <br />I <br />a `m - 25 Qo N Y t <br />t . <br />KEY MAP, <br />NTS <br />CONSTRUCTION T <br />1 INSTALL SILT FENCE PER DEPARTMENT OF ECOLOGY FIGURE 11-4.2.12 <br />/ BMP C233. <br />2 REMOVE EXISTING SETTLEMENT PLATE AND MONITOR ROD. COORDINATE <br />WITH GEOTECHNICAL ENGINEER AND OWNER. <br />NOT USED. <br />REMOVE AND RELOCATE EXISTING CHAIN LINK FENCE AND GATE. <br />COORDINATE LOCATION WITH OWNER. <br />PLUG AND ABANDON EXISTING PIPE PER WSDOT STANDARD SPEC <br />7®08.3(4), UNLESS AUTHORIZED OR APPROVED BY THE CITY AND <br />OWNER <br />UTILITY RELOCATED BY OTHERS. <br />REMOVE PORTION OF PIPE AND MAINTAIN FOR USE WITH TESC <br />MEASURES, <br />DINLET PROTECTION PER DEPARTMENT OF ECOLOGY FIGURE 11-4.2.8 / <br />BMP C220. <br />LEGEND <br />SILT FENCE PER DEPARTMENT OF ECOLOGY <br />��I�� �I�� FIGURE 11-4.2.12 / BMP C233 <br />C C C CLEARING AND GRUBBING LIMITS PER CITY OF <br />EVERETT BMP ES.10 <br />INLET PROTECTION PER DEPARTMENT OF <br />ECOLOGY FIGURE 11-4.2.8 / BMP C220 <br />REMOVE EXISTING ASPHALT <br />INTERCEPTOR DITCH PER DEPARTMENT OF <br />a e o ECOLOGY BMP C200. SEE DETAIL ON SHEET <br />SP1 <br />NOTESGENERAL <br />1. FOR ADDITIONAL EROSION AND SEDIMENTATION CONTROL NOTES, SEE <br />DWG. NO. NT1. <br />2. EXISTING TEMPORARY EROSION CONTROL MEASURES SHALL BE <br />MAINTAINED AND MODIFIED AS NECESSARY TO PRESERVE FUNCTIONALITY. <br />3. SEDIMENT TRAPS SHALL BE LINED WITH IMPERMEABLE GEOMEMBRANE <br />LINERS AS SPECIFIED IN THE SPECIAL PROVISIONS. <br />4. BUILDING LAYOUTS SHOWN ARE PRELIMINARY AND ARE DESIGNED BY <br />OTHERS. THEY ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY. <br />SCALE <br />f 40 <br />