Laserfiche WebLink
z <br />0 <br />0 <br />0 <br />0 <br />0 <br />cc <br />0 <br />N <br />i <br />U) <br />co <br />T <br />0 <br />I <br />0 <br />N <br />0 <br />Q <br />Q <br />U <br />r <br />0 <br />0 <br />Q <br />U <br />i <br />0 <br />0 <br />c <br />0 <br />it <br />w <br />I <br />0 <br />0 <br />0 <br />0 <br />N <br />U <br />U <br />0 <br />0- <br />W <br />0 <br />r <br />L <br />g <br />cn <br />I <br />0 <br />0) <br />0 <br />Q_ <br />i <br />a <br />0 <br />U <br />C <br />r <br />N <br />Lp <br />N <br />I <br />0 <br />N <br />0 <br />N <br />0 <br />Q <br />U <br />0 <br />73 No. <br />Q <br />UTILITIES GENERAL NT <br />1. WHERE REFUSE IS ENCOUNTERED WITHIN UTILITY EXCAVATIONS HANDLING, <br />STOCKPILING AND DISPOSAL OF THE REFUSE SHALL BE COMPLETED PER <br />THE REQUIREMENTS OF THE CONSENT DECREE AND THE APPROVED HEALTH <br />AND SAFETY PLAN. <br />2. WITHIN THE ROADWAY RIGHT OF WAY LIMITS, REFUSE ENCOUNTERED AT <br />THE PIPE INVERT ELEVATION DURING EXCAVATION SHALL BE <br />OVER -EXCAVATED TO A DEPTH OF AT LEAST 12 INCHES BELOW THE BASE <br />OF THE PROPOSED PIPE BEDDING (2 FEET BELOW THE BASE OF THE <br />PIPE). OVER -EXCAVATION SHALL EXTEND THE FULL WIDTH OF THE <br />TRENCH. OVER -EXCAVATED AREAS SHALL BE BACKFILLED WITH <br />FOUNDATION MATERIAL CLASS A, AS DESCRIBED IN SECTION 9-03.17 OF <br />THE WSDOT STANDARD SPECIFICATIONS (WSDOT, 2018). THE FOUNDATION <br />MATERIAL SHALL BE COMPACTED TO THE MAXIMUM EXTENT POSSIBLE PRIOR <br />TO PLACING THE PIPE ZONE BEDDING. <br />3. WITHIN THE ROADWAY RIGHT OF WAY LIMITS, THE FILL SOILS AND REFUSE <br />ENCOUNTERED ALONG THE PROPOSED UTILITY ALIGNMENTS ARE NOT <br />SUITABLE FOR REUSE AS TRENCH BACKFILL FOR THIS PROJECT. <br />IMPORTED TRENCH BACKFILL WILL BE REQUIRED FOR ALL UTILITY <br />INSTALLATIONS, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. <br />DURING DRY WEATHER, LPSB MAY BE USED FOR BACKFILL OF UTILITY <br />TRENCHES. <br />4. FLEXIBLE JOINT CONNECTIONS SHALL BE ADDED TO ALL POINTS WHERE <br />UTILITIES TRANSITION FROM GRADE -SUPPORTED TO PILE -SUPPORTED, AS <br />SHOWN IN THE PLANS. DEFLECTION TOLERANCE SHALL MEET THE <br />REQUIREMENTS IN THE APPROVED GEOTECHNICAL REPORT. <br />5. IN AREAS WHERE UTILITY TRENCHES ARE NOT LOCATED UNDER ASPHALT <br />OR HPDE GEOMEMBRANE LINER, AND PENETRATES THE LPSB HYDRAULIC <br />BARRIER, BSB SHALL BE PLACED IN THE TRENCH THROUGHOUT THE DEPTH <br />OF THE LPSB ZONE UNLESS OTHERWISE APPROVED BY THE ENGINEER. <br />T R Z S A ITA GENERAL T <br />1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT <br />STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. <br />2. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, <br />CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, <br />AND APPROVED BY THE CITY INSPECTOR. <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED <br />FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br />AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF <br />CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY <br />CHANGES REQUIRED SHALL BE APPROVED BY THE OWNER'S <br />REPRESENTATIVE AND THE CITY ENGINEER PRIOR TO COMMENCEMENT OF <br />RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN <br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR <br />TO STARTING CONSTRUCTION. <br />5. ALL SEWER MAINS SHALL BE INSTALLED WITH GREEN STRIPE ON PIPE <br />AND TRACING WIRE SHALL BE INSTALLED ABOVE PIPE BEDDING, SEWER <br />MAIN PIPE MATERIALS SHALL BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO CONSTRUCTION. <br />6. HDPE PIPE SHALL MEET WSDOT 9-05.23 WITH MINIMUM SDR 32.5. <br />7. 6 OF PIPE FOR SANITARY SEWER AND STORM DRAINAGE SHALL BE LEFT <br />INSIDE STRUCTURES WHEN GROUTED TO ALLOW FOR PULL OUT WHEN <br />SETTLEMENT OCCURS. <br />WATER LNOTES: <br />1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY <br />MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO <br />SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF <br />SATISFACTORY BACTERIOLOGICAL TEST RESULTS. <br />2. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE <br />PUBLIC WORKS DEPARTMENT AT THE DEVELOPER'S EXPENSE. THE PUBLIC <br />WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE <br />FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL <br />THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION <br />SHALL DE MADE. <br />3. ALL WORK AND MATERIAL MUST CONFORM TO CITY OF EVERETT STANDARDS <br />4. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO <br />THE START OF CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS <br />CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />5. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY <br />THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN BE CONTACTED <br />REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. <br />6. MAINTAIN A MINIMUM OF 10 FEET HORIZONTALAND w i <br />SEPARATION BETWEEN POTABLE AND NON -POTABLE CONVEYANCE SYSTEMS. <br />UNLESS OTHERWISE <br />-w PLANS. <br />7. ALL CITY <br />OF - - VALVES OPERATED BY •WORKS <br />ACCESSIBLEDEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL BE <br />AT ALL TIMES. <br />8. PIPE AND THRUST BLOCKS SIZED FOR 20OPSI DESIGN PRESSURE. <br />9. UNLESS iiROVED BY THE CITY ENGINEER, ALL WATER MAINS WITHIN THE <br />LANDFILL ZONE IDENTIFIED IN THE CONSENT DECREE SHALL BE 12" HDPE <br />D - R.. D.I.. wiLUE STRIPE <br />_ ON <br />TRACING WIRE <br />SHALL <br />INSTALLEDBE B i <br />HDPE (DI PIPE <br />- D BE PRESSURE <br />ii - RA---- X-- f DI <br />FITTINGS <br />RATED AT MIN. 2•f PSI MAY BE USED IN LIEU OF riHOWEVER THE FITTING MATERIAL USED SHALL BE CONSISTENT THROUGHOUT <br />THE PROJECT CONSTRUCTION. WATER MAIN PIPE MATERIALS SHALL BE <br />APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. <br />- <br />Revision <br />21. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL <br />BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF <br />CONSTRUCTION. <br />22. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR THE UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEIMENT-LADEN WATER DO NOT LEAVE THE SITE. <br />23. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PROJECT ACCEPTANCE. <br />THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER <br />INTO THE DOWNSTREAM SYSTEM. <br />24. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION AND <br />SEDIMENTATION CONTROL BMPS WITHIN 30 DAYS AFTER FINAL SITE <br />STABILIZATION OR AFTER THEY ARE NO LONGER NECESSARY, <br />25. CONSTRUCTION ACCESS ROADS SHALL BE CONSTRUCTED AND MAINTAINED <br />AS NEEDED BASED ON CONTRACTOR'S PHASING. DUE TO THE EXISTING <br />SOIL PROPERTIES, RUTTING AND OTHER NEGATIVE IMPACTS MAY OCCUR <br />AND MAY NECESSITATE EXTRA MEASURES SUCH AS GEOTEXTILE <br />SUPPORTED ROCK ACCESS RAMPS. <br />26, CONTRACTOR SHALL PROVIDE ROUTINE INSPECTION AND MAINTENANCE OF <br />THE SITE. <br />27. WEEKLY INSPECTIONS OF THE SITE WILL BE IMMEDIATELY FOLLOWED BY <br />NECESSARY REPAIRS TO BMPS; PLUS INSPECTION AND REPAIRS AS <br />NECESSARY ARE REQUIRED AFTER ANY STORM WITH INTENSITY OF <br />GREATER THAN 6 MONTHS FOR ANY DURATION. <br />28, INSPECTIONS AND MAINTENANCE/REPAIRS REQUIRED FOR POINTS OF <br />DISCHARGE TO CITY OR ANY OFFSITE OWNER SHALL BE INCLUDED ON <br />THE SAME INSPECTION AND MAINTENANCE SCHEDULE. <br />29. INSPECTIONS AND MAINTENANCE SHALL OCCUR INDEFINITELY UNTIL THE <br />SITE IS DEVELOPED OR UNLESS OTHERWISE DIRECTED BY THE ENGINEER. <br />30. AN INSPECTION CHECKLIST SHALL BE FILLED OUT FOR EACH INSPECTION. <br />DISKING EXISTING <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />THIS SECTION DESCRIBES GENERAL REQUIREMENTS FOR DISKING <br />EXISTING VEGETATION. <br />1.2 DEFINITIONS <br />A. DISKING: CHURNING THE TOP 4- TO 6-INCHES OF THE SURFACE, WITH <br />THE INTENTION OF BLENDING SHORT GRASS AND A THIN LAYER OF <br />ROOT MASS WITH THE SUBSURFACE MATERIAL. <br />B. VEGETATION: GRASS NO TALLER THAN 2 INCHES, AND ITS ROOTS. <br />C. MOWING: THE CUTTING OF GRASS TO A HEIGHT NOT GREATER THAN 2 <br />INCHES. <br />1.3 SEQUENCING AND SCHEDULING <br />A. THE CONTRACTOR SHALL ONLY DISK AREAS THAT ARE TO BE <br />IMMEDIATELY WORKED ON. <br />B. BEFORE EXCAVATION OR FILL PLACEMENT CAN BEGIN WITHIN A PLANNED <br />AREA OF WORK, THE AREA MUST BE DISKED. AREAS TO BE EITHER <br />DISKED OR CLEARED AND GRUBBED SHOULD BE CLEARLY SHOWN IN <br />THE CONTRACT DOCUMENTS. IF THE AREAS ARE NOT CLEAR IN THE <br />CONTRACT DOCUMENTS, THE CONTRACTOR SHALL OBTAIN DIRECTION <br />FROM THE ENGINEER ON HOW TO PREP THE SITE BEFORE STARTING <br />WORK IN THAT AREA. <br />PART 3 - EXECUTION <br />3.1 GENERAL <br />A. VERIFICATION OF CONDITIONS: <br />1. VERIFY ALL LINES, LIMITS AND GRADES PRIOR TO BEGINNING DISKING <br />EXISTING VEGETATION. <br />3.2 PROTECTION <br />A. ALL STREETS, ROADS, GRADING, STRUCTURES, UTILITIES, MONITORING <br />WELLS, AND OTHER IMPROVEMENTS NOT SPECIFICALLY DESIGNATED TO <br />BE MOWED, CLEARED, REMOVED, STRIPPED OR ALTERED AS A PART OF <br />THE WORK SHALL BE PROTECTED FROM DAMAGE THROUGHOUT THE <br />CONSTRUCTION PERIOD. ANY DAMAGE CAUSED BY THE CONTRACTOR, <br />HIS EMPLOYEES, AGENTS, OR ANY LOWER TIERED SUBCONTRACTORS <br />SHALL BE IMMEDIATELY REPAIRED TO THE ORIGINAL CONDITION AND TO <br />THE SATISFACTION OF THE ENGINEER OR REPRESENTATIVE AT THE <br />CONTRACTORS COST. COMPLETED WORK (E.G. EARTHWORK AND <br />FOUNDATIONS) SHALL BE PROTECTED FROM WETTING, DRYING AND <br />FREEZING BY PROVIDING TEMPORARY DRAINAGE FEATURES AND <br />BLANKETS OR PROTECTIVE COVER SOIL LAYERS AS NECESSARY. <br />3.3 DISKING EXISTING VEGETATION <br />A. THE CONTRACTOR SHALL DISK EXISTING VEGETATION IN ALL AREAS OF <br />PROPOSED FILL PLACEMENT PRIOR TO PLACEMENT OF FILL. DISKING <br />SHALL NOT START UNTIL THE SURFACE VEGETATION IS MOWED TO A <br />MAXIMUM HEIGHT OF 2 INCHES. DISKING SHALL CONTINUE UNTIL THE <br />UPPER 4- TO 6-INCHES OF SOIL, VEGETATION AND ROOT MASS ARE <br />THOROUGHLY MIXED. <br />B. DISKING EXISTING VEGETATION WORK INCLUDES: <br />1. PROTECTING FROM HARM ALL OBJECTS SELECTED TO REMAIN. <br />2. MOWING THE AREA PRIOR TO DISKING. <br />J <br />RELOCATIONREFUSE DISPOSAL NOTES - <br />PLAN. <br />COMPACTION INOTES: <br />1. ANY AREAS RECEIVING STOCKPILED/FILL MATERIAL TO BE PLACED AND <br />COMPACTED, SHALL HAVE EXISTING VEGETATION TILLED INTO THE <br />SUDGRADE PRIOR TO PLACEMENT OF SOIL. SEE ALSO DISKING EXISTING <br />VEGETATION NOTES, THIS PAGE. <br />2. STRUCTURAL FILL SHALL BE COMPACTED TO MINIMUM 95% MODIFIED <br />PROCTOR. <br />3. GEOTECHNICAL TESTING SHALL BE COMPLETED PRIOR TO FILL <br />PLACEMENT TO DETERMINE SOIL MOISTURE AND PLACEMENT <br />REQUIREMENTS REQUIRED TO ACHIEVE SPECIFIED COMPACTION. <br />CONTINGENCY <br />IN THE EVENT THAT WATER QUALITY MONITORING INDICATES THAT TURBID <br />RUNOFF IS LEAVING THE SITE: <br />1. COVER ALL AREAS OF EXPOSED SOIL WITH PLASTIC SHEETING. PLASTIC <br />SHOULD HAVE SUFFICIENT STAKED SAND BAGS AND OVERLAPPED JOINT <br />TO PREVENT WIND BLOW -OFF. <br />2. PUMP ALL TURBID RUNOFF FROM DETENTION POND TO WATER TRUCK <br />FOR OFF SITE DISPOSAL. NO OTHER WORK ACTIVITY SHALL BE <br />PERMITTED UNTIL WATER QUALITY MONITORING INDICATES THAT CLEAN <br />RUNOFF IS LEAVING THE SITE. <br />1. ALL VAULTS AND MANHOLES THAT ARE BELOW GRADE ARE CONSIDERED <br />AS PERMIT REQUIRED CONFINED SPACES. PER OSHA 1910.146 A SIGN <br />READING "DANGER, PERMIT -REQUIRED CONFINED SPACE, DO NOT <br />ENTER" SHALL BE PLACED ON OR NEAR THE STRUCTURES AS <br />APPROPRIATE. FINAL SIGN LETTERING, TYPE, SIZE, AND PLACEMENT <br />SHALL BE APPROVED BY THE ENGINEER. <br />2. ALL STRUCTURES SHALL HAVE GASKETED WATER TIGHT JOINTS AS <br />APPROPRIATE, PER SECTION 9-04.4 OF THE WSDOT STANDARD <br />SPECIFICATIONS (WSDOT, 2015). <br />THROUGH APRILa <br />1. THE CONSTRUCTION SEQUENCE SHALL BE MODIFIED TO MINIMIZE THE <br />AREA OF UNSTABLIZED SOIL. A MAXIMUM OF 1,000 SQUARE FEET OF <br />DIRT WILL BE EXPOSED AT ANY TIME. <br />2. EARTHEN AREAS THAT ARE SUBJECT TO CONTRIBUTING SEDIMENTS <br />DURING STORM EVENT AND WHERE EARTH MOVEMENT IS NOT <br />ANTICIPATED FOR 46-HOURS SHALL BE STABILIZED USING BMP <br />MEASURES IN THE FOLLOWING NOTES: <br />3. WET SEASON TESC MEASURES WILL BE EXPANDED TO INCLUDE <br />a. INSTALL A SECOND SILT FENCE, 10-FEET INSIDE OF THE ORIGINAL <br />SILT FENCE <br />b. INSTALL A SEDIMENT POND DESIGNED TO ACCOMMODATE A 25-YR, <br />24-HOUR STORM <br />c. A PLAN TO PUMP WATER FROM THE SEDIMENT POND TO A <br />GRASSY AREA ON THE SITE WHEN DISCHARGE FROM THE SEDIMENT <br />POND IS 'MUDDY', PRIOR APPROVAL BY THE CITY REQUIRED. <br />d. BUILDING MATERIALS SHALL BE STOCKPILED ON THE PAVED ROAD <br />SURFACE (REDUCES "TRAFFIC" ON EARTHEN STRUCTURES) <br />4. SOILS SHALL NOT BE DISTURBED EXCEPT FOR ACTUAL CONSTRUCTION <br />ACTIVITIES. PARKING IS ALLOWED ONLY ON PAVED AND/OR ON GRAVEL <br />SURFACES. <br />5. SLOPES 6% AND GREATER WITHOUT ESTABLISHED GROUNDCOVER WILL BE <br />STABILIZED WITH PLASTIC SHEETING, 6-MIL (MINIMUM). THE SHEETING <br />SHALL BE ANCHORED WITH SAND BAGS LOCATED 5-FEET APART ON THE <br />PERIMETER AND 10-FEET ON CENTER OF THE REMAINDER OF THE <br />SHEETING. MINIMUM OF 2-FEET OVERLAP IS REQUIRED FOR OVERLAPPING <br />SHEETS. <br />6. WATER DISCHARGED FROM THE SITE WILL BE MONITORED FOR TURBIDITY. <br />MAXIMUM ALLOWABLE TURBIDITY OF DISCHARGED WATER WILL FEE 5 NTU <br />OVER BACKGROUND. <br />7. WHEN RAINFALL IS HEAVY (DEFINED AS RAINFALL HARD ENOUGH TO <br />PRODUCE SEDIMENT RUN-OFF FROM EXPOSED DIRT), ALL EXPOSED <br />EARTHWORK SHALL BE COVERED. NO OTHER CONSTRUCTION ACTIVITY <br />SHALL OCCUR ON PERVIOUS SURFACES DURING THESE PERIODS OF <br />HEAVY RAIN. <br />6. ALL DRAINAGE SWALES SHALL BE FULLY VEGETATED, SWALES SHALL BE <br />SODDED IF THE VEGETATION GROWING IN THE SWALE IS INSUFFICIENT TO <br />PROVIDE WATER QUALITY AND TO PREVENT EROSION OF THE SWALE. <br />9. SEE ALSO CONSENT DECREE FOR THE LANDFILL SITE ON NT2. <br />1 THROUGH APRIL <br />1. UTILITY INSTALLATION AND TRENCHING SHOULD BE SCHEDULED AROUND <br />THE PREDICTED WEATHER FORECASTS. EXCAVATION OF UTILITY <br />TRENCHES SHOULD BE LIMITED TO THE AMOUNT OF UTILITY THAT MAY <br />BE INSTALLED AND BACKFILLED IN A DAY. PLASTIC SHEETING SHALL BE <br />USED TO COVER ALL STOCKPILES THAT WILL REMAIN OVERNIGHT. <br />SUFFICIENT PLASTIC SHEETING SHALL BE STOCKPILED ON SITE TO COVER <br />ALL TEMPORARY STOCKPILED SOIL IN THE EVENT OF AN UNEXPECTED <br />STORM EVENT. COMPLY WITH ALL REQUIREMENTS OF CHAPTER 296-155 <br />WAG, PART N, FOR ENSURING TRENCH SAFETY. <br />2. LIMIT EARTH DISTURBING ACTIVITIES TO DRY WEATHER DAYS, <br />RE-ESTABLISH COVER AS SOON AS CONSTRUCTION ACTIVITY IS <br />COMPLETE. <br />3. COVER MEASURES SHALL BE RE -APPLIED IMMEDIATELY FOLLOWING THE <br />COMPLETION OF THE WORK ACTIVITY. NO AREAS OF EXPOSED SOIL <br />SHALL REMAIN UNCOVERED UNLESS ACTIVELY BEING WORKED. <br />4. SEE ALSO CONSENT DECREE FOR THE LANDFILL SITE ON NT2. <br />5. CRUSHED SURFACING BASE COURSE OR GRAVEL BORROW MEETING THE <br />WSDOT STANDARD SPECIFICATIONS (WSDOT, CURRENT VERSION) SHALL BE <br />USED FOR ALL UTILITY TRENCH BACKFILL DURING WET WEATHER, UNLESS <br />AUTHORIZED OR APPROVED BY THE CITY, GEOTECHNICAL ENGINEER, AND <br />OWNER. <br />6. UTILITIES INSTALLED OUTSIDE OF THE ROADWAY RIGHT OF WAY LIMITS <br />MAY BE BACKFILLED WITH GRAVEL BORROW OR SUITABLE NATIVE <br />MATERIAL AS APPROVED BY THE GEOTECHNICAL ENGINEER. <br />DAILY I T E® <br />ROADS SHALL BE SWEPT OFF AND/OR CLEARED OF DEBRIS EVERYDAY. <br />E <br />IT IS THE OWNER/CONTRACTOR'S RESPONSIBILITY TO ENSURE COVERAGE <br />UNDER ECOLOGY'S CONSTRUCTION STORMWATER GENERAL PERMIT IS <br />OBTAINED AND MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION <br />DURATION. ENFORCEMENT OF SITE EROSION AND SEDIMENTATION CONTROL <br />MEASURES WILL BE BY THE CITY OF EVERETT INSPECTORS AND THE <br />I V1, � <br />