My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 A bid by a partnership shall be executed in the partnership name, and signed by a <br /> 2 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any <br /> 3 UDBE requirements are to be satisfied through such an agreement. <br /> 4 <br /> 5 A bid by a joint venture shall be executed in the joint venture name and signed by a <br /> 6 member of the joint venture. A copy of the joint venture agreement shall be submitted <br /> 7 with the Bid Form if any UDBE requirements are to be satisfied through such an <br /> 8 agreement. <br /> 9 <br /> 10 *** <br /> 11 Section 1-02.6 is supplemented with the following: <br /> 12 <br /> 13 Additive Bids <br /> 14 <br /> 15 This Bid Proposal is composed of the following parts: <br /> 16 1. Base Bid <br /> 17 The Total Bid shall include constructing all items included in the Proposal <br /> 18 Schedule noted below, except those items contained in the Additives Schedule B, 111 <br /> 19 Schedule C, Schedule D, Schedule E, and Schedule, F. <br /> 20 <br /> 21 • Schedule A <br /> 22 Beverly Ln - Pecks Dr to Sunset Ln <br /> 23 Seaway Blvd —75th St SW to SR 526 <br /> 24 Seaway Blvd Ramps— Boeing On/Off Ramps <br /> 25 75th St SW— Seaway Blvd to Hardeson <br /> 26 16th Ave W— 75th St SW to SR 526 <br /> 27 Federal Ave —40th St to Charles Ave <br /> 28 <br /> 29 2. Additive(s) Schedule B <br /> 30 <br /> 31 • Schedule B I <br /> 32 100th St SE — 19th Ave SE east to City Limits <br /> 33 27th Dr SE — 100th St SE to 10404 27th Dr SE <br /> 34 <br /> 35 3. Additive(s) Schedule C <br /> 36 <br /> 37 • Schedule C <br /> 38 23rd St—Walnut St east to 1-5 <br /> 39 23rd St—Walnut St to Broadway <br /> 40 <br /> 41 4. Additive(s) Schedule D 111 <br /> 42 <br /> 43 • Schedule D <br /> 44 W Casino Ave— 5th Ave to Airport Rd <br /> 45 <br /> 46 5. Additive(s) Schedule E <br /> 47 <br /> 48 • Schedule E <br /> 49 E Casino Ave — Bruin Blvd to Beverly Blvd <br /> 50 <br /> 51 6. Additive(s) Schedule F <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 6 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.