Laserfiche WebLink
I <br /> 1 <br /> I2 • Schedule F <br /> 3 Alley: 3111 Nassau — Pacific Ave to 32nd St <br /> 4 <br /> I 5 <br /> 6 Bidding Procedures <br /> 7 To be considered responsive the bidder shall submit a price on each and every item <br /> I 8 of the Work included in the Base Bid and all Additives. For identical items on <br /> 9 Schedules A through F, the cost per unit shall be equal or equivalent by scale, as <br /> 10 determined by the City. <br /> I 11 <br /> 12 Award Procedures <br /> 13 The City of Everett reserves the right to Award any combination of Total Base Bid <br /> 14 and Bid Additives determined to be in the best interest of the City to the lowest <br /> 15 16 responsive Bidder The project shall be awarded to a single Bidder. <br /> 17 *** <br /> I18 <br /> 19 1-02.6(1).RTF <br /> 20 Add the following new section: <br /> I 21 <br /> 22 1-02.6(1) Recycled Materials Proposal <br /> 23 (January 4, 2016 APWA GSP) <br /> I 24 <br /> 25 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into <br /> 26 the project, using the form provided in the Contract Provisions. <br /> I 27 <br /> 28 1-02.7.RTF <br /> 29 1-02.7 Bid Deposit <br /> 30 (March 8, 2013 APWA GSP) <br /> I31 <br /> 32 Supplement this section with the following: <br /> 33 <br /> I34 Bid bonds shall contain the following: <br /> 35 1. Contracting Agency-assigned number for the project; <br /> I 36 2. Name of the project; <br /> 37 3. The Contracting Agency named as obligee; <br /> 38 4. The amount of the bid bond stated either as a dollar figure or as a percentage which <br /> I39 represents five percent of the maximum bid amount that could be awarded; <br /> 40 5. Signature of the bidder's officer empowered to sign official statements. The signature <br /> 41 of the person authorized to submit the bid should agree with the signature on the <br /> 42 bond, and the title of the person must accompany the said signature; <br /> 43 6. The signature of the surety's officer empowered to sign the bond and the power of <br /> 44 attorney. <br /> I45 <br /> 46 If so stated in the Contract Provisions, bidder must use the bond form included in the <br /> 47 Contract Provisions. <br /> I 48 <br /> 49 If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 7 OF 85 SPECIALS <br /> I WORK ORDER 3764 FEBRUARY 23,2022 <br />