Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-02.10.RTF <br /> 2 1-02.10 Withdrawing, Revising, or Supplementing Proposal I <br /> 3 (July 23, 2015 APWA GSP) <br /> 4 <br /> 5 Delete this section, and replace it with the following: <br /> 6 <br /> 7 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> 8 withdraw, revise, or supplement it if: <br /> 9 <br /> 10 1. The Bidder submits a written request signed by an authorized person and <br /> 11 physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 12 2. The Contracting Agency receives the request before the time set for receipt ofIII <br /> 13 Bid Proposals, and <br /> 14 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br /> 15 Agency before the time set for receipt of Bid Proposals. 11 <br /> 16 <br /> 17 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 18 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> 19 unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> 20 supplemented package in its entirety. If the Bidder does not submit a revised or <br /> 21 supplemented package, then its bid shall be considered withdrawn. <br /> 22 111 <br /> 23 Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> 24 recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> 25 requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> 26 <br /> 27 1-02.13.RTF <br /> 28 1-02.13 Irregular Proposals <br /> 29 (October 1, 2020 APWA GSP) <br /> 30 <br /> 31 Delete this section and replace it with the following: I <br /> 32 <br /> 33 1. A Proposal will be considered irregular and will be rejected if: <br /> 34 a. The Bidder is not prequalified when so required; <br /> 35 b. The authorized Proposal form furnished by the Contracting Agency is not <br /> 36 used or is altered; <br /> 37 c. The completed Proposal form contains any unauthorized additions, deletions, I <br /> 38 alternate Bids, or conditions; <br /> 39 d. The Bidder adds provisions reserving the right to reject or accept the award, <br /> 40 or enter into the Contract; <br /> 41 e. A price per unit cannot be determined from the Bid Proposal; <br /> 42 f. The Proposal form is not properly executed; <br /> 43 g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> 44 applicable, as required in Section 1-02.6; <br /> 45 h. The Bidder fails to submit or properly complete a Disadvantaged Business <br /> 46 Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> 47 i. The Bidder fails to submit written confirmation from each DBE firm listed on <br /> 48 the Bidder's completed DBE Utilization Certification that they are in <br /> 49 agreement with the bidder's DBE participation commitment, if applicable, as <br /> 50 required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> 51 to meet the requirements of the Special Provisions; <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 8 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.