My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i IL. <br /> I <br /> EVERETT <br /> CITY OF EVERETT, WASHINGTON <br /> WASHINGTON PUBLIC WORKS DEPARTMENT <br /> ADDENDUM NO. 2 <br /> 2022 Pavement Maintenance Overlay Project <br /> I PW 3764 <br /> March 11, 2022 <br /> INotice to Planholders: <br /> This Addendum No. 2 contains the following revisions, additions, <br /> I deletions, and/or clarifications, is hereby made a part of the plans and <br /> specifications (Contract Documents) for the above named project and <br /> shall be taken into consideration by Bidders in submitting their bids. <br /> 1 Bidders shall acknowledge receipt of this Addendum No. 2 in the space <br /> provided on the Proposal. Failure to do so may subject the Bidder to <br /> Idisqualification of its bid. <br /> SPECIAL PROVISIONS <br /> i • Remove and replace page 57 of 85 of the Special Provisions which <br /> will reflect the change of ESALs listed in 5-04.3(8)A2. <br /> i • Remove and replace page 70 with pages 70 and 70.1 of the <br /> Special Provisions which will reflect supporting language for Asphalt Cost <br /> Price Adjustment. <br /> BID SCHEDULE <br /> • Remove and replace the last page of each bid schedule sheets for <br /> all schedules. For Schedules A-F an added bid item of Asphalt Cost Price <br /> Adjustment was added. This will also reflect the change on schedules D <br /> (W Casino) for the change in loop quantities. <br /> I • Remove and replace the first page of Schedule C to reflect the <br /> change in quantity for Uniformed Police Officer. <br /> IAPPENDIX G <br /> • Remove and replace Schedule D (W Casino) to reflect the change <br /> UBLIC WORKS in loop quantities. <br /> 3200 Cedar Street PLANS <br /> Everett,WA 98201 <br /> 16, <br /> 425.257.8800 • Remove and replace drawing C33 and C35 from schedule D (W <br /> 425.257.8882 fax Casino) only, the changes will reflect the removal of loop quantities. <br /> everettpw@everettwa.gov <br /> ' everettwa.gov/pw All other requirements of the plans and specifications remain in effect. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.