My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) <br /> I 24. 3 Plastic Bicycle Detector $ $ <br /> Each Symbol Per Each <br /> 111 <br /> 25. 6.9 Raised Pavement Markers, $ $ <br /> Hundred Type 2 Per Hund <br /> 1 26. 0.34 Centerline Rumble Strip $ $ <br /> Mile Per Mile <br /> I27. 57,244 Temporary Pavement $ $ . <br /> Linear Foot Markings Per L.F. <br /> I28. 0 Removing Cement Conc. $ • $ <br /> Square Yard Sidewalk Per S.Y. <br /> I29. 690 Vehicle Loop Detectors $ • $ . <br /> Linear Foot Per L.F. <br /> I30. 0 Loop Lead-In Detector Cable $ • $ • <br /> Linear Foot Per L.F. <br /> I31. 0 Conduit Pipe,2" Diameter $ • $ . <br /> Linear Foot Per L.F. <br /> I <br /> 32. 1 <br /> Video Detection System $ • $ • <br /> ILump Sum Per L.S. <br /> 33. 1 Spill Prevention Control Plan $ • $ • <br /> iLump Sum Per L.S. <br /> 34. 1 Resolve Above Ground $ 5000 . 00 $ 5000 . 00 <br /> IIIEstimate Conflicts Per Est. <br /> 35. 1 Erosion/Water Pollution $ 7000 .00 $ 7000 . 00 <br /> IEstimate Control Per Est. <br /> 36. 1 Asphalt Cost Price $ 10,020 . 00 $ 10,020 . 00 <br /> Calculation Adjustment Per Calc. <br /> I BASE BID ITEMS <br /> SCHEDULE A $ <br /> SUBTOTAL <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 5 OF 29 ADDENDUM 2 - DIVISION P <br /> IIIWORK ORDER 3764 SCHEDULE A MARCH 11, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.