My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ium. <br /> EVE RETT <br /> CITY OF EVERETT, WASHINGTON <br /> I WASHINGTON PUBLIC WORKS DEPARTMENT <br /> ADDENDUM NO. 3 <br /> 2022 Pavement Maintenance Overlay Project <br /> I PW 3764 <br /> March 14, 2022 <br /> INotice to Planholders: <br /> I This Addendum No. 3 contains the following revisions, additions, <br /> deletions, and/or clarifications, is hereby made a part of the plans and <br /> specifications (Contract Documents) for the above named project and <br /> shall be taken into consideration by Bidders in submitting their bids. <br /> IBidders shall acknowledge receipt of this Addendum No. 3 in the space <br /> provided on the Proposal. Failure to do so may subject the Bidder to <br /> Idisqualification of its bid. <br /> SCHEDULE <br /> IBID <br /> • Remove and replace page 9, 1st page of Schedule C to correct <br /> language that this schedule will be awarded based on adequate funding <br /> i and is not awarded based on Schedule B <br /> • Remove and replace the last page of Schedule C and Schedule F, <br /> pages 14 and 20, to fix the number typo of the number of calculations for <br /> item 36. <br /> • Remove and replace page 19, Item 23 of bid schedule F, though a <br /> 0 quantity was left off while making corrections for Addendum 2. <br /> IAPPENDIX G <br /> • Remove and replace Schedule D (W Casino) to reflect the change <br /> I in loop quantities. Addendum 2 should have read remove and replace <br /> Schedule C (23rd St) to reflect the change in Uniformed Police Officer <br /> hours. Both Schedule C and D have quantity changes. <br /> I <br /> UBLIC WORKS All other requirements of the plans and specifications remain in effect. <br /> 3200 Cedar Street This addendum shall be attached to and made a part of the plans and <br /> Everett,WA 98201 specifications and shall be acknowledged on the bidder's proposal. <br /> Ib 425.257.8800 <br /> 425.257.8882 fax <br /> Ieverettpw@everettwa.gov <br /> everettwa.gov/pw <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.