|
MIR 11111111 IIIIIII Mil Rill MI MI Oil 111111 AIM MN *III 1111111 all MI ON MIR all. NIB
<br /> GENERAL NOTES:
<br /> 1 i 1E-
<br /> 1. PROTECT EXISTING MONUMENTS,TIP.SEE SPECIAL PROVISIONS
<br /> SECTION 8-13.
<br /> 2. ADJUST IRON AS DIRECTED ANWOR REQUIRED.
<br /> 1 EX TYmPE III PO rE,STEEL — 04-,...
<br /> 0- -
<br /> /
<br /> 111 ---_- .,
<br /> ., - ...- 3. AIJ.LINE WORK IS BASED ON AERIAL PHOTOGRAPHY AND GIS DATA
<br /> WHICH MAY NOT REPRESENT CURRENT FIELD CONDITIONS.
<br /> CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
<br /> . /.412' ( .
<br /> f__ — v.
<br /> t3 -.--.'1*r .-'---...
<br /> %I
<br /> 4. ALL PAVING UMIT DIMENSIONS ARE APPROXIMATE AND ARE BASED
<br /> i 0 _ _____—__ __.__....—. _. _ _.. ,
<br /> ON AERIAL PHOTOGRAPHY.
<br /> 412 AD 1.1 ,_,,>.
<br /> a MINN 10
<br /> LT
<br /> F_ -Po
<br /> 1112.20 101101110
<br /> 0 mum -- 1,,. ,.., ,(,,... _.., 5. PDA.VEMENT MARKINGS SHALL BE PLACED PER PLAN OR BY THE
<br /> ECTION OF THE ENGINEER.PAVEMENT MARKING DIMENSIONS
<br /> 3 2
<br /> N
<br /> W CASINO RD co ARE MEASURED FROM FACE-OF-CURB OR EDGE OF ASPHALT WHERE
<br /> .1
<br /> OVow • • 0 NO aMB EXISTS.
<br /> EX TYPE II
<br /> IP It"
<br /> .. CONSTRUCTION NO.TES:•"'
<br /> a 0 r.:1 POLE,STEEL ."." 0
<br /> 010111010 _ . . _..
<br /> ,i 1. INSTALL A 4-B1RW61-7 DIAMETER ROUND LOOP PER CITY STANDARD
<br /> I Lj J.1 ..
<br /> ..• Prvvv3 - ,- ----------ki-'--tr . ..,
<br /> . DRAVA 109 AND 810.,... A._ ... As "...ow c„....0
<br /> RI -----
<br /> V) 13 -.... ,-'. li
<br /> STALL THREE 4-TURN 6 FT DIAMETER ROUND LOOPS PER CITY
<br /> _ e- ,... ,-- , TA — --._ __ .._.....,, STANDARD DRAWINGS 805,809 AND 810.
<br /> _ - \ ,.,., ..,_.• 14 .... —
<br /> 4. REMOVE SIDEWALX PANELS AND INSTALL ONE 2 IN DMMETER
<br /> CONDUIT STUBOUT UNDER CURB AND GUTTER PER CITY STANDARD
<br /> i iiiii / N602
<br /> EX TS CAI3336 __ DRAWING 809.
<br /> w U.....1.1 U 1_ I 0 12.INSTALL ONE 21X 20.BICYCLE QUADRUPLE LOOP PER CITY
<br /> STANDARD DRAWING 809 AND 810.
<br /> - mil
<br /> I-M
<br /> BLDG Y 18.INSTALL ONE(1)2 INCH CONDUIT STUB-OUT.CORE DRILL IN
<br /> R--:1 41.6
<br /> PAVEMENT AT 4S DEGREE ANGLE BETWEEN 6 INCHES(AIN.)AND 18
<br /> €1-
<br /> o 1 03 rip, LIT- INCHES(MAX.)FROM FACT OF CURB.CONTACT ENGINEER FIVE(5)
<br /> 1
<br /> WORKING DAYS IN ADVANCE OF INSTALLATION FOR CITY SIGNAL
<br /> I
<br /> SHOP COORDINATION AND SUPPORT.
<br /> 3 1:.,,,,. i
<br /> PLAN
<br /> SCPLEJ 1...20'
<br /> ''.'..
<br /> T
<br /> 605
<br /> I .., .
<br /> 525
<br /> o o
<br /> ...
<br /> __1 .
<br /> -. — — --
<br /> -. — , .13_- —
<br /> 1--.4
<br /> If- 0
<br /> 14
<br /> .1
<br /> 11
<br /> 1` ....z0
<br /> .. . _ -. ... _ ,.. .. . ... -- ..
<br /> _
<br /> W CASINO RD
<br /> o
<br /> 0 -
<br /> Ca
<br /> L.L.1 252.
<br /> 1.1.1
<br /> 1/1
<br /> . _ ___.___. _ ii
<br /> . ...____ _ ••• .4/ .... -•
<br /> —0. fit • 1.,
<br /> 11 - ,..,,, _
<br /> I
<br /> i R ..,
<br /> 0 E.
<br /> 1 ,
<br /> A.1
<br /> I I 702 L...._L.... I
<br /> \`....
<br /> filBleJimimi-
<br /> GM 20 20 0
<br /> i
<br /> BLDG A
<br /> FEET
<br /> r 510
<br /> 1
<br /> SCHEDULE D
<br /> b......
<br /> i .
<br /> ....
<br /> ... .0t, 1\4-, rav
<br /> 11 2 3/9/2022 ADDENDUM 42-REMOVED LOOPS ON W CASINO RD livai--"° EVERETT 2022 PAVEMENT MAINTENANCE
<br /> i NO. ! W CASINO RD C35
<br /> g 1__3/7/2022 _ADDENDUM 41.ADDED LOOPS AT 8TH AVE W . - pm _ I/' i',1 ,:4 PUBLIC WORKS OVERLAY
<br /> DATE APRVD REVISION ef.-oeliTiiiai..i._ 4 I )
<br /> /
<br /> ,5
<br /> ', WOO Cedar Street
<br /> PLANS ISSUED FOR
<br /> WORK ORDER 3764 37
<br /> WA UAW 821 TO 525
<br /> cor.H§,_,- RECORD — N';'-Oleirl',nig 05257 woo[Yereltb.poi,
<br /> 45
<br /> ACTION DATE APRVD ACTION DATE APRVD ACTION DATE APRVO AMON•30 I SIAM•WA
<br /> or Taw
<br />
|