Laserfiche WebLink
I <br /> IIIITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) <br /> I10. 24 Adjust Manhole $ 100 . 00 $ 2,400 . 00 <br /> Each Per Each <br /> III11. 0 Adjust Catch Basin/Inlet to $ 00 . 00 $ 00 . 00 <br /> Each Grade Per Each <br /> 1 12. 60 Adjust Valve Box to Grade $ 100 . 00 $ 6,000 . 00 <br /> Each Per Each <br /> I13. 20 Adjust Existing Monument $ 100 00 $ 2,000 00 <br /> Each Castings to Grade Per Each <br /> 111 <br /> 14. 0 Profile Plastic Line $ 00 00 $ 00 00 <br /> Linear Foot Per L.F. <br /> I <br /> 15. 0 Profile Plastic Wide Line $ 00 . 00 $ 00 . 00 <br /> ISquare Yard Per L.F. <br /> 16. 7,409 Plastic Wide Line $ 2 . 75 $ 20,374 . 75 <br /> ILinear Foot Per L.F. <br /> 17. 31 Plastic Traffic Arrow $ 165 . 00 $ 5,115 . 00 <br /> IEach Per Each <br /> 18. 640 24" Plastic Crosswalk Line $ 7 . 00 $ 4,480 • 00 <br /> ISquare Foot Per S.F. <br /> 19. 199 24" Plastic Stop Bar $ 11 . 00 $ 2,189 . 00 <br /> ILinear Foot Per L.F. <br /> I 20. 17,917 Plastic Line $ 1 • 30 $ 23,292 10 <br /> Linear Foot Per L.F. <br /> I 21. 0 Plastic Traffic Letter $ 00 • 00 $ 00 • 00 <br /> Each Per Each <br /> I22. 15 Plastic Bicycle Lane Symbol $ 165 . 00 $ 2,475 . 00 <br /> Each Per Each <br /> 1 23. 0 Plastic Sharrow $ 00 00 $ 00 00 <br /> Each Per Each <br /> I <br /> I 2022 PAVEMENT MAINTENANCE OVERLAY 7 OF 29 ADDENDUM 1 -DIVISION P <br /> WORK ORDER 3764 SCHEDULE B MARCH 7, 2022 <br />