Laserfiche WebLink
I <br /> II BID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> 1 2022 PAVEMENT MAINTENANCE OVERLAY <br /> W.O. 3764 <br /> Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> conform thereto. All entries must be typed or entered in ink. <br /> I <br /> BIDDER NAME <br /> IBID ADDITIVE <br /> THIS SCHEDULE WILL BE AWARDED WITH SCHED B, SEPARATE DUE TO FUNDING SOURCE <br /> ISCHEDULE C -23RD ST <br /> ITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> INO. QUANITITY (FIGURES) (FIGURES) <br /> 1. 1 Mobilization $ - $ • <br /> ILump Sum Per L.S. <br /> 2. 890 Flaggers (Minimum Bid $ $ . <br /> 1 Hour Prevailing Wage) Per Hour <br /> 3. 0 Uniformed Police Officer $ • $ • <br /> IHour Per Hour <br /> 4. 1 Project Temporary Traffic $ $ . <br /> ILump Sum Control Per L.S. <br />• 5. 370 Portable Changeable $ $ <br /> Hour Message Sign Per Hour <br /> I 6. 19,583 Planing Bituminous $ $ <br /> Square Yard Pavement Per S.Y. <br /> I7. 2,937 Additional Planing $ $ . <br /> Square Yard Bituminous Pavement Per S.Y. <br /> i8. 2,399 HMA Class 1/2 Inch, PG 64- $ $ <br /> Ton 22 Per Ton <br /> I9. 40 Street Cleaning $ • $ • <br /> Hour Per Hour <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 9 OF 29 ADDENDUM 1- DIVISION P <br /> WORK ORDER 3764 SCHEDULE C MARCH 7, 2022 <br />