Laserfiche WebLink
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) 1 <br /> 10. 37 Adjust Manhole $ $ • <br /> Each Per Each <br /> 11. 0 Adjust Catch Basin/Inlet to $ • $ <br /> Each Grade Per Each <br /> 12. 12 Adjust Valve Box to Grade $ $ • <br /> Each Per Each <br /> 13. 8 Adjust Existing Monument $ $ . <br /> Each Castings to Grade Per Each <br /> 14. 0 Profile Plastic Line $ • $ • I <br /> Linear Foot Per L.F. <br /> 15. 0 Profile Plastic Wide Line $ • $ I <br /> Square Yard Per L.F. <br /> 16. 0 Plastic Wide Line $ $ I <br /> Linear Foot Per L.F. <br /> 17. 0 Plastic Traffic Arrow $ $ I <br /> Each Per Each <br /> 18. 780 24" Plastic Crosswalk Line $ $ • <br /> Square Foot Per S.F. <br /> 19. 96 24" Plastic Stop Bar $ • $ • <br /> Linear Foot Per L.F. <br /> 20. 5,603 Plastic Line $ • $ • <br /> Linear Foot Per L.F. <br /> 21. 12 Plastic Traffic Letter $ • $ . <br /> Each Per Each I <br /> 22. 0 Plastic Bicycle Lane Symbol $ • $ • <br /> Each Per Each <br /> 23. 0 Plastic Sharrow $ • $ • <br /> Each Per Each111 <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 10 OF 29 ADDENDUM 1- DIVISION P <br /> WORK ORDER 3764 SCHEDULE C MARCH 7, 2022 <br />