Laserfiche WebLink
I <br /> BID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> 2022 PAVEMENT MAINTENANCE OVERLAY I <br /> W.O. 3764 <br /> Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> conform thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME I <br /> BID ADDITIVE I <br /> THIS SCHEDULE WILL BE AWARDED BASED ON ADEQUATE FUNDING <br /> SCHEDULE D -W CASINTO AVE <br /> //y I <br /> ITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) I <br /> 1. 1 Mobilization $ • $ . <br /> Lump Sum Per L.S. <br /> 2. 1,840 Flaggers (Minimum Bid $ $ <br /> Hour Prevailing Wage) Per Hour I <br /> 3. 180 Uniformed Police Officer $ • $ . <br /> Hour Per Hour I <br /> 4. 1 Project Temporary Traffic $ $ <br /> Lump Sum Control Per L.S. 1 <br /> 5. 332 Portable Changeab $ $ <br /> Hour Message Sign Per Hour <br /> 6. 41,907 Planing Bit urinous $ . $ <br /> Square Yard Pavement Per S.Y. <br /> 7. 6,286 Additional Planing $ $ <br /> . <br /> Square Yard / ituminous Pavement Per S.Y. <br /> / <br /> 8. 5,135 HMA Class 1/2 Inch, PG 64- $ $ 1 <br /> Ton 22 Per Ton <br /> 9. 100 Street Cleaning $ • $ • I <br /> Hour Per Hour <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 12 OF 29 ADDENDUM 1-DIVISION P <br /> WORK ORDER 3764 SCHEDULE D MARCH 7, 2022 <br />