My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) <br /> I 10. 53 Adjust Manhole $ $ • <br /> Each Per Each <br /> I 11. 0 Adjust Catch Basin/Inlet to $ $ <br /> Each Grade Per Each <br /> I 12. 51 Adjust Valve Box to Grade $ / <br /> $ <br /> Each \\ Per Each / • <br /> 13. 7 Adjust Existing Monument $ / $ . <br /> Each Ca g <br /> stjn s to Grade Per Each <br /> i <br /> \\ / <br /> 14. 0 Profile P'astic Line $ $ • <br /> Linear Foot Per L.F. , <br /> 15. 0 Profile Plastic Wide Line $ ; • $ <br /> • <br /> Square Yard Per/L.F. <br /> I <br /> 16. 15,458 Plastic Wide Line / <br /> • $ • <br /> Linear Foot ' Per L.F. <br /> 7 <br /> I 17. 22 Plastic Traffic Arrow $ • $ • <br /> Each / Per Each <br /> I /18. 1,500 <br /> 24" Plastic Crosswalk Line $ \ • $ • <br /> ISquare Foot i Per S.F.N <br /> 19. 163 24" Platic Stop Bar $ \ • $ • <br /> ILinear Foot Per L.F. <br /> 20. 29,808 Plastic Line $ • _ $ • <br /> ILinear Foot Per L.F. <br /> 21. 8 Plastic Traffic Letter $ • \$ • <br /> IEach Per Each <br /> 22. 1 Plastic Bicycle Lane Symbol $ • $ \ • <br /> Each Per Each \ <br /> 23. 0 Plastic Sharrow $ $ \ <br /> I Each Per Each <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 13 OF 29 ADDENDUM 1-DIVISION P <br /> IWORK ORDER 3764 SCHEDULE D MARCH 7,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.