Laserfiche WebLink
I <br /> ITEM PLAN ITEM DESCRIPTION AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY (FIGURES) (FIGURES) <br /> 10. 16 Adjust Manhole $ • $ • <br /> Each Per Each111 <br /> 11. 0 Adjust Catch Basin/Inlet to $ $ . <br /> Each Grade Per Each 111 <br /> 12. 13 Adjust Valve Box to Grade $ • $ <br /> Each Per Each 111 <br /> 13. 3 Adjust Existing Monument $ $ . I <br /> Each Castings to Grade Per Each <br /> 14. 0 Profile Plastic Line $ / • $ • 1 <br /> Linear Foot Per L.F. <br /> 15. 0 Profile Plastic Wi Line $ . / • $ <br /> Square Yard Pert F. <br /> 16. 0 Plastic Wide Line \ $ • $ <br /> Linear Foot \Per L.F. <br /> / <br /> 17. 0 Plastic Traffic Arrow $ • $ • <br /> Each / Per Each <br /> / <br /> 18. 140 24" Plastic Cross alk Line $ • $ • <br /> 1 <br /> Square Foot Per S.F. <br /> 19. 0I <br /> 24" Plastic Stop Bar $ • $ <br /> Linear Foot Per L.F. <br /> I <br /> 20. 7,318 Plastic Line $ • $ • <br /> Linear Foot // Per L.F. <br /> 21. 0 l Plastic Traffic Letter $ • $ • <br /> Each / Per Each <br /> I <br /> 22. 0 Plastic Bicycle Lane Symbol $ • $ <br /> ,Each Per Each 1 <br /> 23. 0 Plastic Sharrow $ • $ • <br /> Each Per Each <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 16 OF 29 ADDENDUM 1- DIVISION P <br /> WORK ORDER 3764 SCHEDULE E MARCH 7, 2022 <br />