My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> NO. QUANITITY ITEM PLAN AMOUNT TOTAL AMOUNT <br /> ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> \10. 0 Adjust Manhole $ • $ • <br /> I \ Each Per Each <br /> 11. \ 1 Adjust Catch Basin/Inlet to $ $ <br /> Each Grade Per Each <br /> I 12. 0 Adjust Valve Box to Grade $ $ <br /> Each \ Per Each • <br /> 1 13. 0 just Existing Monument $ $ <br /> Each Cas'igs to Grade Per Each /T— <br /> �� / <br /> I14. 0 Profile Plastic Line $ $ <br /> Linear Foot Per L.F. <br /> I15. 0 Profile Plastic Wi Line $ • $ • <br /> Square Yard Per L.F. <br /> 16. 0 Plastic Wide Line $ • $ • <br /> Linear Foot Per L.F. <br /> I 17. 0 <br /> Plastic Traffic Arrow $ • $ • <br /> Each Per Each <br /> I <br /> 18. 0 24" Plastic Crosswalk Line $ $ • <br /> ISquare Foot ' Per S.F. <br /> 19. 0 24" Plastic Stop Bar $ \ $ • <br /> I Linear Foot / Per L.F. \ <br /> i <br /> 20. 0 / Plastic Line $ $ • <br /> ILinear Fop/ Per L.F. <br /> 21. //0 Plastic Traffic Letter $ • $ <br /> IEach Per Each <br /> 22. 0 Plastic Bicycle Lane Symbol $ • $ • <br /> Each Per Each <br /> I <br /> 1 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 19 OF 29 ADDENDUM 1- DIVISION P <br /> IWORK ORDER 3764 SCHEDULE F MARCH 7, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.