My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION II�\ (FIGURES) (FIGURES) <br /> 23. 0 <br /> Plastic Sharrow $ • $ I <br /> \` Each Per Each <br /> 24. \ 0 Plastic Bicycle Detector $ • $ <br /> tech Symbol Per Each I <br /> 25. 0.0 Raised Pavement Markers, $ $ • <br /> I <br /> Hundred Type 2 Per Hund <br /> 26. 0.00 Cent line Rumble Strip $ • '$ • <br /> Mile \ Per Mile <br /> \ / <br /> 27. 0 Temporary Pavement $ $ I <br /> Linear Foot Markings \ Per L.F. <br /> 28. 0 Removing Cement Conc. $ $ I <br /> Square Yard Sidewalk Per S.Y.\ <br /> 29. 0 <br /> Vehicle Loop Detectors $ • $ • <br /> Linear Foot er L. . <br /> / \ <br /> 30. 0 Loop Lead-In Detector C le $ $ • <br /> \- - <br /> Linear Foot Per L.F. <br /> 31. 0 Conduit Pipe,2 iameter $ $ • <br /> I <br /> Linear Foot Per L.F. \ I <br /> 32. 0 Video De#ection System $ $ `� <br /> Lump Sum % Per L.S. <br /> I <br /> 33. 0 S/pl Prevention Control Plan $ • $ \\__• <br /> Lump Sum / Per L.S. ' <br /> 34. 1 Resolve Above Ground $ 5000 . 00 $ 5000 . 00 <br /> Estimate Conflicts Per Est. <br /> 35. 1 Erosion/Water Pollution $ 200 . 00 $ 200 . 00 <br /> Estimate Control Per Est. I <br /> BID ADDTIVIE ITEMS I <br /> FOR SCHEDULE F $ <br /> SUBTOTAL <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 20 OF 29 ADDENDUM 1-DIVISION P <br /> WORK ORDER 3764 SCHEDULE F MARCH 7, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.