Laserfiche WebLink
ILocal Agency Name <br /> I Local Agency Address <br /> Local Agency Subcontractor List <br /> Prepared in com,alrance with RCW 39.30.050 as amended <br /> ITo Be Submitted with the Bid Proposal <br /> Project t"ianie 2022 Pavement Maintenance Overlay <br /> Failure to list subcontractors with whom the bidder,if awarded the contract,will directly subcontract for performance of the <br /> I <br /> work of structural steel installation, rebar installation, heating,ventilation and air conditioning, plumbing,as described in <br /> Chapter 18.106 RCW,and electrical,as described in Chapter 19_28 RCW or naming more than one subcontractor to perform <br /> the same work will result in your bid being nonresponsive and therefore void. <br /> I Subcontractorf s)with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, <br /> rebar installation, heating,ventilation and air conditioning, plumbing,as described in Chapter 18.106 RCW,and electrical as <br /> described in Chapter 19.28 RCW must be listed below.The work to be performed is to be listed below the subeontractar(s)name. <br /> I To the extent the Project includes one or more categories of work referenced in RCW 39.30.060,and no subcontractor is <br /> listed below to perform such work,the bidder certifies that the work will either(I)be performed by the bidder itself, or(iij be <br /> performed by a lower tier subcontractor who will not contract directly with the bidder. <br /> Subcontractor Name G&G, Inc. Electrical Contractor#: GGCOR**081 MU <br /> Work to be performed Electrical: Vehicle Loop Detectors (#29), Loop Lead-In Cable (#30), Conduit <br /> IPipe, 2" Diameter (#31), and Video Detection Systems (#32) <br /> Subcontractor Name <br /> I <br /> Work to be performed <br /> I <br /> ISubcontractor Name <br /> Work to be performed <br /> I <br /> Subcontractor Name <br /> 1iliork to be performed <br /> I .. <br /> ISubcontractor Name <br /> Work to be performed <br /> I <br /> Bidder's are notified that it is the opinion of the enforcement agency that PVC Of metal conduit,junction boxes,etc, are considered <br /> electrical equipment and therefore considered part of electrical work,even if the installation is for future use and no wiring or electrical <br /> I current is connected during the project, <br /> 00T Form 271-1:1i5A <br /> Revised 06f202O <br /> I 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 23 OF 29 DIVISION P—SUBCONTRACTOR LIST <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />