My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s-.,—...�. APWA-WA Division 1 Committee rev. 1/8/2016 <br /> Proposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> propose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: N/A percent. ' <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> 1-06,6 of the Special Provisions. <br /> Bidder: Central Pavin , LLC ' <br /> Signature of Authorized Official: / C <br /> Date, 41'5/2022 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 29 OF 29 DIVISION P—RECYCLED MATERIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.