Laserfiche WebLink
I <br /> Quantities Per Street <br /> I <br /> Schedule B <br /> Item Number Description Units 100TH ST SE <br />' 3 Uniformed Police Officer Hour 90 <br /> 5 Portable Changeable Message Sign Hour 234 <br /> I 6 Planing Bituminous Pavement S.Y. 22,583 <br /> 7 Additional Planing Bituminous Pavement S.Y. 3,388 <br /> 8 HMA Class 1/2 Inch, PG 64-22 Ton 2,767 <br />' 9 Street Cleaning Hour 57 <br /> 10 Adjust Manhole Each 19 <br /> 11 Adjust Catch Basin/Inlet to Grade Each - <br />' 12 Adjust Valve Box to Grade Each 40 <br /> Adjust Existing Monument Castings to Grade Each 15 <br /> I <br /> 13 <br /> 14 Profile Plastic Line L.F. 0 <br /> 15 Profile Plastic Wide Line L.F. 0 <br /> I <br /> 16 Plastic Wide Line L.F. 7409 <br /> 17 Plastic Traffic Arrow Each 31 <br /> 18 24" Plastic Crosswalk Line S.F. 640 <br />' 19 24" Plastic Stop Bar L.F. 182 <br /> 20 Plastic Line L.F. 13508 <br /> 111 21 Plastic Traffic Letter Each 0 <br /> 22 Plastic Bicycle Lane Symbol Each 15 <br /> 23 Plastic Sharrow Each 0 <br /> I 24 Plastic Bicycle Detector Symbol Each 3 <br /> 25 Raised Pavement Markers,Type 2 Hund 2.3 <br /> 26 Centerline Rumble Strip Mile 0 <br /> I <br /> 27 Temporary Pavement Markings L.F. 32841 <br /> 28 Removing Cement Conc.Sidewalk S.Y. 0 <br /> I <br /> 29 Vehicle Loop Detectors L.F. 170 <br /> 30 Loop Lead In Detector Cable L.F. 0 <br /> 31 Conduit Pipe, 2" Diameter L.F. 0 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY ADDENDUM 1 APPENDIX G <br /> IWORK ORDER 3764 PAGE 7 of 13 MARCH 7,2022 <br />