My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IQuantities Per Street <br /> ISchedule D <br /> It Number Description Units W Casino Ave <br /> I <br /> Uniformed Police Officer Hour 180 <br /> 5 Portable Changeable Message Sign Hour / 332 <br /> 6 Planing Bituminous Pavement S.Y. % <br /> I <br /> 41,907 <br /> 7 Additional Planing Bituminous Pavement S.Y. 6,286 <br /> 8 'k MA Class 1/2 Inch, PG 64-22 Ton 5,135 <br /> ' <br /> 1 <br /> I <br /> 9 St et Cleaning Hour /r 100 <br /> 0 Adjus Manhole Each,/ 53 <br /> 11 Adjust C ch Basin/Inlet to Grade Ea,e. - <br /> 12 Adjust Valve ox to Grade ,,Each 51 <br /> Adjust Existing nument Castings to Grade ,/ Each 7 <br /> 13 / <br /> I14 Profile Plastic Line / L.F. 0 <br /> 15 Profile Plastic Wide Line \ L.F. 0 <br /> I 16 Plastic Wide Line L.F. 15458 <br /> 17 Plastic Traffic Arrow Each 22 <br /> 18 24" Plastic Crosswalk Line , \ S.F. 1500 <br /> I <br /> 19 24" Plastic Stop Bar j \ <br /> \ L.F. 163 <br /> 20 Plastic Line L.F. 29808 <br /> 21 Plastic Traffic Let ' Each 8 <br /> I22 Plastic Bicyclene Symbol Each 1 <br /> 23 Plastic Sharrow Each 0 <br /> I <br /> 24 25 Plastic Bcle Detector Symbol Each' 3 <br /> Raise Pavement Markers,Type 2 Hund 4.60 <br /> 26 Ce erline Rumble Strip Mile 0 <br /> I <br /> 27 emporary Pavement MarkingsL.F. 66946 <br /> 28 / Removing Cement Conc.Sidewalk S.Y. 16 <br /> 29 Vehicle Loop Detectors L.F. 1705 <br /> I307 Loop Lead-In Detector Cable L.F. 750 <br /> 31 Conduit Pipe, 2" Diameter L.F. 40 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY ADDENDUM 1 APPENDIX G I <br /> WORK ORDER 3764 PAGE 11 of 13 MARCH 7,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.