My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. RINI ilia Mil MIND IBM 111111 (-MI <br /> GENERAL NOTES: <br /> i ,I <br /> 1. PROTECT EXISTING MONUMENTS,TYP.SEE SPECIAL PROVISIONS <br /> ii- SECTION 8.13. <br /> U <br /> 2. ADJUST IRON AS DIRECTED AND/OR REQUIRED. <br /> EX TYPE III PO E.STEEL _ '. va- ... _ _._„ <br /> g q, ir or p.� 3. ALL UNE WORK R BASED ON AERIAL PHOTOGRAPHY AND GIS DATA <br /> -[ T - --'- `-BT'-"- "-' _ WHICH MAY NOT REPRESENT CURRENT FIELD CONDITIONS. <br /> s • J v - - 'l" -- - - = CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. <br /> --w- T s• + •" •" ' _ - - - - O a - 4. ALLPAVINGLIMITDIMENSIONS ARE APPROXIMATE AND ARE BASED <br /> } � <br /> U " Al9 .- - - ° O ON AERML PHOTOGMPHY. <br /> n n - <br /> 412• <br /> - -- +---_ -- - - '1 L 5. PAVEMENT OF THE <br /> BE PLACED PER PWN OR BY GOIMENTHE <br /> Z m _ .'91 W DIRECTION OF THE ENGINEER.PAVEMENT MARKING DIMENSIONS <br /> p .-_ -. 411 $ <br /> - ______s �� d W CASINO RD _ _. P_ E() ARE MEASURED FROM FACE-OF-CURB OR EDGE OF ASPHALT WHERE <br /> d © tam .. ._..___ 19 L1.1 <br /> NO CURB EXISTS. <br /> d _ <br /> A 0 $ a t11 �� ��tB AMY O _ _ t/1 `,CONSTRUCTION NOTES: <br /> f■4a ErtE■ ~- -i :+ 1. INSTALL A 0-TURN 6FTDIAMETER ROUND LOOP PER CITY STANDARD <br /> 1 W - __.'-__- 819 F •EPa• © 0 G L�'t _. _ <br /> W �. ,., DRAWINGS 809 AND 810. <br /> H 1 ' _ ---- 2. INSTALL THREE 4-TURN6RDIAMETER ROUND LOOPS PER CITY <br /> 1 _r„ - <br /> STANDARD DRAWINGS 805,809 AND 810. <br /> -vlt - J <br /> Y <br /> ' - 1L �_ / 4. REMOVE SIDEWALK PANELS AND INSTALL ONE 2IN DIAMETER <br /> rl --�', K6O2 / DRAWING <br /> STUBOUT UNDER CURB AND GUTTER PER CITY STANDARD <br /> EX TS CAB 336 T- _ DRAWING 809. <br /> 0 y,• W EX TYP�11 y j I D 12.INSTALL ONE 2'K 20'BICYCLE QUADRUPLE LOOP PER CITY <br /> \ •l POLE,STEEL , - ��,� I STANDARD DRAWING 809 AND 830. <br /> Q /.L I2./ BLD-Y <br /> L9- 18.INSTALL ONE)1)2 INCH CONDUIT STUB-OUT.CORE DRILL IN <br /> ®.®t PAVEMENT AT 45 DEGREE ANGLE BETWEEN 6 INCHES(MIN)AND 18 <br /> O G DO ''112 INCHES(MAX.)FROM FACE OF CURB.CONTACT ENGINEER FIVE(5) <br /> 0 WORKING DAYS IN ADVANCE OF INSTALLATION FOR CITY SIGNAL <br /> SHOP COORDINATION AND SUPPORT. <br /> �,n I I 31.1' ,. _ <br /> .1 •N <br /> �' 6Q5 \� . — <br /> I 1 <br /> 525 I o <br /> D O G j <br /> �,a .__ _ <br /> > "_ ---�- e" W CASINO RD $ <br /> 1e O F 9 O <br /> m e O <br /> o <br /> • <br /> W -.. .._ _._..... _.. _.251 .. _...----__ _-__ _. W <br /> -- r/. - T -rn <br /> 15 <br /> q` G <br /> I I I I 1 ---1._702 bOO -- 10 10 0 FEET 10 40 <br /> IBLDG A _ t 510 <br /> I SCHEDULE D <br /> �, a-• ,, C <br /> 2022 PAVEMINTENANCE: VTT WCASORD BLO ARK1N DATE APRVD ACTION DATE APRVD ACTION DATE APRVD -1 jy 05.25>.e 00 evercrtwppw REGION•14 J STAif•wA 4S <br />
The URL can be used to link to this page
Your browser does not support the video tag.