My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> INSTRUCTIONS TO BIDDERS <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention of Gael <br /> Fisk, P.E., (425) 257-8909 or gfisk@everettwa.gov. <br /> 2.0 Bid Schedules <br /> This project includes 5 bid schedules, which are incorporated into the Proposal. Bid schedules are <br /> defined as follows: <br /> • Schedule A <br /> o Beverly Lane— Pecks Dr to Sunset <br /> o Seaway Blvd — 75th St SW to SR 526 <br /> o Seaway Blvd Ramps — Boeing On/Off Ramps <br /> 0 75th St SW—Seaway Blvd to Hardeson <br /> O 16th Ave W—75th St SW to 80th St SW <br /> o Federal —40th St to Charles <br /> • Schedule B <br /> O 100th St SE — 19th Ave SE east to City Limits <br /> O 27th Dr SE — 100th St SE to 10404 27th Dr SE <br /> • Schedule C <br /> 0 23rd St—Walnut St east to 1-5 <br /> O 23rd St—Walnut St to Broadway <br /> • Schedule D <br /> O W Casino Ave — 5th Ave to Airport Rd <br /> • Schedule E <br /> o E Casino Ave— Bruin Blvd to Beverly Blvd <br /> • Schedule F <br /> o Alley— 3111 Nassau St, Pacific Ave to 32nd St <br /> The project will include the total of Schedule A as the Base Bid. The Proposal also includes Bid <br /> Additive Schedule B, Schedule C, Schedule D, Schedule E and Schedule F. For identical items on <br /> Schedules A through F, the cost per unit shall be equal or equivalent by scale, as determined by the <br /> City. The project will be awarded to the lowest responsible Bidder based on the total sum of the Base <br /> Bid (Schedule A) plus the total of the selected Bid Additives. The decision to which Bid Additives are <br /> selected is at the City's sole discretion and will be made after Bid opening. <br /> 3.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be executed in full <br /> as required and submitted with the bid: <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 1 OF 3 DIVISION B <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.