Laserfiche WebLink
I <br /> 1 CONTENTS <br /> 2 <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS 1 <br /> I 4 <br /> 5 DIVISION 1 <br /> 6 GENERAL REQUIREMENTS <br /> I7 DESCRIPTION OF WORK 2 <br /> I 8 1-01 DEFINITION AND TERMS 2 <br /> 9 1-01.3 Definitions 2 <br /> 10 1-02 BID PROCEDURES AND CONDITIONS 4 <br /> 11 1-02.1 Qualification of Bidder 4 <br /> 12 1-02.2 Plans and Specifications 4 <br /> I13 1-02.5 Proposal Forms 5 <br /> 14 1-02.6 Preparation of Proposal 5 <br /> 111 <br /> 15 1-02.6(1) Recycled Materials Proposal 7 <br /> 16 1-02.7 Bid Deposit 7 <br /> III <br /> 17 1-02.10 Withdrawing, Revising, or Supplementing Proposal 8 <br /> 18 1-02.13 Irregular Proposals 8 <br /> I 19 1-02.14 Disqualification of Bidders 9 <br /> 20 1-02.15 Pre Award Information 10 <br /> I 21 1-03 AWARD AND EXECUTION OF CONTRACT 10 <br /> 22 1-03.1 Consideration of Bids 10 <br /> 23 1-03.1(1) Identical Bid Totals 10 <br /> I24 1-03.3 Execution of Contract 11 <br /> 25 1-03.4 Contract Bond 11 <br /> I26 1-03.7 Judicial Review 12 <br /> 27 1-04 SCOPE OF WORK 12 <br /> I 28 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 29 Specifications, and Addenda 12 <br /> I 30 1-05 CONTROL OF WORK 13 <br /> 31 1-05.7 Removal of Defective and Unauthorized Work 13 <br /> 32 1-05.11 Final Inspections and Operational Testing 14 <br /> I33 1-05.11(1) Substantial Completion Date 14 <br /> 34 1-05.11(2) Final Inspection And Physical Completion Date 14 <br /> 1 35 1-05.11(3) Operational Testing 15 <br /> 36 1-05.13 Superintendents, Labor and Equipment of Contractor 15 <br /> 1 37 1-05.14 Cooperation With Other Contractors 15 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE A OF G TOC-SPECIAL PROVISIONS <br /> I WORK ORDER 3764 FEBRUARY 23,2022 <br />