Laserfiche WebLink
I <br /> 1 1-08.9 Liquidated Damages 35 <br /> I2 1-09 MEASUREMENT AND PAYMENT 36 <br /> 3 1-09.6 Force Account 36 <br /> 1 4 1-09.8 Payment For Material On Hand 36 <br /> 5 1-09.9 Payments 37 <br /> 6 1-09.9(1) Retainage - Vacant 38 <br /> 7 1-10 TEMPORARY TRAFFIC CONTROL 38 <br /> I8 1-10.2 Traffic Control Management 38 <br /> 9 1-10.2(1)General 38 <br /> I 10 1-10.3 Traffic Control, Labor, Procedures and Devices 39 <br /> 11 1-10.3(1)TrafficControl Labor 39 <br /> 12 1-010.3(1)C Uniformed Police Officer 39 <br /> 1 13 1-10.4 Measurement 40 <br /> 14 1-10.4(3) Reinstating Unit Items With Lump Sum Traffic Control 40 <br /> i15 1-10.5 Payment 41 <br /> 16 1-10.5(2) Item Bids with Lump Sum for Incidentals 41 <br /> I17 <br /> 18 DIVISION 2 <br /> I19 EARTHWORK <br /> 20 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 42 <br /> I 21 2-02.3 Construction Requirements 42 <br /> 22 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters 42 <br /> 23 2-02.3(3)A Removal of Cement Concrete Sidewalks 42 <br /> I 24 2-02.3(3)B Temporary Asphalt Concrete Sidewalk 43 <br /> 25 2-02.3(3)C Sawcut Asphalt Concrete Pavement 43 <br /> I26 2-02.4 Measurement 43 <br /> 27 2-02.5 Payment 43 <br /> I28 2-08 STREET CLEANING 44 <br /> 29 2-08.1 Description 44 <br /> $ 30 2-08.2 Vacant 44 <br /> 31 2-08.3 Construction Requirements 44 <br /> I 32 2-08.4 Measurement 44 <br /> 33 2-08.5 Payment 44 <br /> I 34 <br /> 35 <br /> 36 <br /> I37 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE C OF G TOC-SPECIAL PROVISIONS <br /> IWORK ORDER 3764 FEBRUARY 23,2022 <br />