My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 DIVISION 5 <br /> 2 SURFACE TREATMENTS AND PAVEMENTS I <br /> 3 5-04 Hot Mix Asphalt 46 <br /> 4 5-04.1 Description 46 <br /> 5 5-04.2 Materials 46 <br /> 6 5-04.2(1) How to Get a HMA Mix Design on the QPL 47 <br /> 7 5-04.2(2) Mix Design - Obtaining Project Approval 47 <br /> 8 5-04.2(2)A Vacant 48 <br /> 9 5-04.2(2)B Using Warm Mix Asphalt Processes 48 <br /> 10 5-04.3 Construction Requirements 49 <br /> 11 5-04.3(1) Weather Limitations 49 <br /> 12 5-04.3(2) Paving Under Traffic 49 <br /> 13 5-04.3(3) Equipment 49 I <br /> 14 5-04.3(3)A Mixing Plant 50 <br /> 15 5-04.3(3)B Hauling Equipment 50 <br /> 16 5-04.3(3)C Pavers 51 <br /> 17 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle 52111 <br /> 18 5-04.3(3)E Rollers 52 <br /> 19 5-04.3(4) Preparation of Existing Paved Surfaces 53 <br /> 20 5-04.3(4)A Crack Sealing 54 <br /> 21 5-04.3(4)A1 General 54 <br /> 22 5-04.3(4)A2 Crack Sealing Areas Prior to Paving 55 <br /> 23 5-04.3(4)A3 Crack Sealing Crack Sealing Areas Not to be Paved 55 <br /> 24 5-04.3(4)B Vacant 55 I <br /> 25 5-04.3(4)C Pavement Repair 55 <br /> 26 5-04.3(5) Producing/Stockpiling Aggregates and RAP 56 <br /> 27 5-04.3(6) Mixing 56 <br /> 28 5-04.3(7) Spreading and Finishing 56 <br /> 29 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA 57 <br /> 30 5-04.3(8)A General 57 <br /> 31 5-04.3(9) HMA Mixture Acceptance 57 <br /> 32 5-04.3(9)A Vacant 58 <br /> 33 5-04.3(9)B Vacant 58 <br /> 34 5-04.3(9)C Mixture Acceptance - Nonstatistical Evaluation 59 <br /> 35 5-04.3(9)C1 Mixture Nonstatistical Evaluation - Lots and Sublots 59 <br /> 36 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling 59 <br /> 37 5-04.3(9)C3 Mixture Nonstatistical Evaluation -Acceptance Testing 59 I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE D OF G TOC-SPECIAL PROVISIONS <br /> WORK ORDER 3764 FEBRUARY 23, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.