My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 5-04.3(9)C4 Mixture Nonstatistical Evaluation - Pay Factors 60 <br /> I2 5-04.3(9)C5 Vacant 60 <br /> 3 5-04.3(9)C6 Mixture Nonstatistical Evaluation - Price Adjustments 60 <br /> 1 4 5-04.3(9)C7 Mixture Nonstatistical Evaluation - Retests 61 <br /> 5 5-04.3(9)D Mixture Acceptance - Commercial Evaluation 61 <br /> 1 6 5-04.3(10) HMA Compaction Acceptance 61 <br /> 7 5-04.3(10)A HMA Compaction -General Compaction Requirements 63 <br /> I8 5-04.3(10)B HMA Compaction -Cyclic Density 63 <br /> 9 5-04.3(10)C Vacant 63 <br /> I 10 5-04.3(10)D HMA Nonstatistical Compaction 63 <br /> 11 5-04.3(10)D1 HMA Nonstatistical Compaction - Lots and Sublots 63 <br /> 12 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation -Acceptance <br /> I13 Testing 64 <br /> 14 5-04.3(10)D3 HMA Nonstatistical Compaction - Price Adjustments 64 <br /> 1 15 5-04.3(11) Reject Work 64 <br /> 16 5-04.3(11)A Reject Work General 64 <br /> I17 5-04.3(11)B Rejection by Contractor 65 <br /> 18 5-04.3(11)C Rejection Without Testing (Mixture or Compaction) 65 <br /> I19 5-04.3(11)D Rejection -A Partial Sublot 65 <br /> 20 5-04.3(11)E Rejection -An Entire Sublot 65 <br /> 21 5-04.3(11)F Rejection -A Lot in Progress 65 <br /> 22 5 04.3(11)G Rejection -An Entire Lot (Mixture or Compaction) 66 <br /> I 23 5-04.3(12) Joints 66 <br /> 24 5-04.3(12)A HMA Joints 66 <br /> 25 5-04.3(12)A1 Transverse Joints 66 <br /> I26 5-04.3(12)A2 Longitudinal Joints 66 <br /> 27 5-04.3(12)B Bridge Paving Joint Seals 66 <br /> I28 5-04.3(12)B1 Sawcut and Seal 66 <br /> 29 5-04.3(12)B2 Paved Panel Joint Seal 67 <br /> I30 5-04.3(13) Surface Smoothness 67 <br /> 31 5-04.3(14) Planing (Milling) Bituminous Pavement 68 <br /> 32 5-04.3(14)A Paving and Planing Under Traffic 69 <br /> 33 5-04.3(14)A1 General 69 <br /> I 34 5-04.3(15) Vacant 70 <br /> 35 5-04.3(16) HMA Road Approaches 70 <br /> 36 5-04.4 Measurement 70 <br /> I37 5-04.4 Payment 70 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE E OF G TOC-SPECIAL PROVISIONS <br /> IWORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.