My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 DIVISION 7 1 <br /> 3 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> 4 SEWERS, WATER MAINS, AND CONDUITS I <br /> 5 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 71 <br /> 6 7-05.3 Construction Requirements 7111 <br /> 7 7-05.3(1) Adjusting Manholes and Catch Basins to Grade 71 <br /> 8 7-05.3(5) Adjusting Valve Boxes to Grade 72 <br /> 9 7-05.4 Measurement 72 <br /> 10 7-05.5 Payment 73 <br /> 11 <br /> 12 DIVISION 8 <br /> 13 MISCELLANEOUS CONSTRUCTION 1 <br /> 14 8-09 RAISED PAVEMENT MARKERS 74 <br /> 15 8-09.1 Description 74 <br /> 16 8-09.2 Materials 74 <br /> 17 8-09.3 Construction Requirements 74 <br /> 18 8-09.3(5) Asphalt Adhesives 74 <br /> 19 8-09.4 Measurement 75 <br /> 20 8-09.5 Payment 75 <br /> 21 8-13 MONUMENT CASES 75 <br /> 22 8-13.1 Description 75 <br /> 23 8-13.2 Vacant 75 <br /> 24 8-13.3 Construction Requirements 75 <br /> 25 8-13.4 Measurement 75 <br /> 26 8-13.5 Payment 75 I <br /> 27 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT <br /> 28 TRANSPORTATION SYSTEMS, AND ELECTRICAL 76 <br /> 29 8-20.2 Materials - Fiber Optic Cable, Electrical Conductors, and Cable 76 <br /> 30 8-20.3 Construction Requirements 77 <br /> 31 8-20.3(14) Signal Systems 77 <br /> 32 8-20.3(14)C Induction Loop Vehicle Detectors 77 <br /> 33 8-20.4 Measurement 78 <br /> 34 8-20.5 Payment 79 <br /> 35 8-22 PAVEMENT MARKING 80 <br /> 36 8-22.2 Materials 80 <br /> 37 8-22.3 Construction Requirements 80 I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE F OF G TOC-SPECIAL PROVISIONS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.