Laserfiche WebLink
I <br /> 1 8-22.3(1) Preliminary Spotting 81 <br /> 2 8-22.3(2) Preparation of Roadway Surfaces 82 <br /> 3 8-22.4 Measurement 82 <br /> 4 8-22.5 Payment 83 <br /> 5 8-23 TEMPORARY PAVEMENT MARKING 83 <br /> 6 8-23.2 Materials 83 <br /> 7 8-23.5 Payment 83 <br /> 8 8-26 RESOLVE ABOVE GROUND CONFLICTS 84 <br /> 9 8-26.1 Description 84 <br /> 10 8-26.2 Vacant 84 <br /> 11 8-26.3 Construction Requirements 84 <br /> 12 8-26.4 Vacant 84 <br /> 13 8-26.5 Payment 84 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE G OF G TOC-SPECIAL PROVISIONS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />