Laserfiche WebLink
M <br /> 1 DIVISIONI.GR1 <br /> 2 Division 1 <br /> 3 General Requirements <br /> 4 <br /> 5 DESWORKGR1 <br /> 6 DESCRIPTION OF WORK <br /> 7 <br /> 8 FDESWORKI.DOCX <br /> 9 (March 13, 1995) <br /> 10 This Contract provides for the improvement of***The construction of up to 21,354 tons of Hot <br /> 11 Mix Asphalt, Class 1/2-inch, PG 64-22, two inches (2")thick, on selected City Streets, including <br /> 12 grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case <br /> 13 and cover, striping, channelization, traffic induction loops and traffic cameras*** and other <br /> 14 work, all in accordance with the attached Contract Plans, these Contract Provisions, and the <br /> 15 Standard Specifications. <br /> 16 <br /> 17 1-01.DOCX <br /> 18 Definition and Terms I <br /> 19 <br /> 20 1-01.3.RTF <br /> 21 1-01.3 Definitions <br /> 22 (January 4, 2016 APWA GSP) <br /> 23 <br /> 24 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 25 them with the following: <br /> 26 <br /> 27 Dates <br /> 28 Bid Opening Date <br /> 29 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 30 Award Date <br /> 31 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 32 responsible and responsive Bidder for the Work. <br /> 33 Contract Execution Date <br /> 34 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 35 Notice to Proceed Date <br /> 36 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 37 Substantial Completion Date <br /> 38 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 39 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 40 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 41 replacement of temporary substitute facilities, plant establishment periods, or <br /> 42 correction or repair remains for the Physical Completion of the total Contract. I <br /> 43 Physical Completion Date <br /> 44 The day all of the Work is physically completed on the project. All documentation <br /> 45 required by the Contract and required by law does not necessarily need to be111 <br /> 46 furnished by the Contractor by this date. <br /> 47 Completion Date <br /> 48 The day all the Work specified in the Contract is completed and all the obligations of <br /> 49 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 2 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />