Laserfiche WebLink
I <br /> 1 required by the Contract and required by law must be furnished by the Contractor <br /> I2 before establishment of this date. <br /> 3 Final Acceptance Date <br /> 4 The date on which the Contracting Agency accepts the Work as complete. <br /> I 5 <br /> 6 Supplement this Section with the following: <br /> 7 <br /> 8 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 9 Provisions, to the terms "Department of Transportation", "Washington State <br /> 10 Transportation Commission", "Commission", "Secretary of Transportation", "Secretary", <br /> 11 "Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency". <br /> 12 <br /> 13 All references to the terms "State" or"state" shall be revised to read "Contracting <br /> I 14 Agency" unless the reference is to an administrative agency of the State of Washington, <br /> 15 a State statute or regulation, or the context reasonably indicates otherwise. <br /> 16 <br /> 17 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> I18 Agency designated location". <br /> 19 <br /> 20 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 21 Contracting Agency form(s) by which final payment is authorized, and final completion <br /> 22 and acceptance granted. <br /> 23 <br /> I 24 Additive <br /> 25 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> 26 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> 27 to the base bid. <br /> 28 <br /> 29 Alternate <br /> I <br /> 30 31 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> Proposal, from which the Contracting Agency may make a choice between different <br /> 32 methods or material of construction for performing the same work. <br /> 33 <br /> 34 Business Day <br /> 35 A business day is any day from Monday through Friday except holidays as listed in <br /> 36 Section 1-08.5. <br /> I 37 <br /> 38 Contract Bond <br /> 39 The definition in the Standard Specifications for"Contract Bond" applies to whatever <br /> I 40 bond form(s) are required by the Contract Documents, which may be a combination of a <br /> 41 Payment Bond and a Performance Bond. <br /> 42 <br /> I 43 Contract Documents <br /> 44 See definition for"Contract". <br /> 45 <br /> I 46 Contract Time <br /> 47 The period of time established by the terms and conditions of the Contract within which <br /> 48 the Work must be physically completed. <br /> 49 <br /> I <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 3 OF 85 SPECIALS <br /> IWORK ORDER 3764 FEBRUARY 23,2022 <br />