Laserfiche WebLink
17 <br />FY 2022 PSGP NOFO Back to the Top <br />Grants. Additionally, the applicant(s) listed as contacts on the application will receive a <br />system-generated email to confirm receipt. <br /> <br />10. Content and Form of Application Submission <br />a. Standard Required Application Forms and Information <br />The following forms or information are required to be submitted in either Grants.gov or ND <br />Grants. The Standard Forms (SF) are submitted either through Grants.gov, through forms <br />generated in ND Grants, or as an attachment in ND Grants. Applicants may also access the <br />SFs at https://www.grants.gov/web/grants/forms/sf-424-family.html. <br /> <br />I. GRANTS.GOV <br />• SF-424, Application for Federal Assistance, initial application submitted through <br />Grants.gov <br />• Grants.gov Lobbying Form, Certification Regarding Lobbying, submitted through <br />Grants.gov <br /> <br />II. ND GRANTS <br />• SF-424A, Budget Information (Non-Construction), submitted via the forms generated <br />by ND Grants <br />o For construction under an award, submit SF-424C, Budget Information <br />(Construction), submitted via the forms generated by ND Grants, in addition to <br />or instead of SF-424A <br />• SF-424B, Standard Assurances (Non-Construction), submitted via the forms generated <br />by ND Grants <br />o For construction under an award, submit SF-424D, Standard Assurances <br />(Construction), submitted via the forms generated by ND Grants, in addition to <br />or instead of SF-424B <br />• SF-LLL, Disclosure of Lobbying Activities, submitted via the forms generated by ND <br />Grants <br />• Indirect Cost Agreement or Proposal, submitted as an attachment in ND Grants if the <br />budget includes indirect costs and the applicant is required to have an indirect cost rate <br />agreement or proposal. If the applicant does not have or is not required to have an <br />indirect cost rate agreement or proposal, please see Section D.13 of this NOFO, “Funding <br />Restrictions and Allowable Costs,” for further information regarding allowability of <br />indirect costs and whether alternatives to an indirect cost rate agreement or proposal <br />might be available, or contact the relevant FEMA staff identified in Section G of this <br />NOFO, “DHS Awarding Agency Contact Information” for further instructions. <br /> <br />Generally, applicants have to submit either the non-construction forms (i.e., SF-424A and <br />SF-424B) or construction forms (i.e., SF-424C and SF-424D), meaning that applicants that <br />only have construction work and do not have any non-construction work need only submit <br />the construction forms (i.e., SF-424C and SF-424D) and not the non-construction forms (i.e., <br />SF-424A and SF-424B), and vice versa. However, applicants who have both construction <br />and non-construction work under this program need to submit both the construction and non- <br />construction forms. <br />