Laserfiche WebLink
7�i1[7� <br />UI—L INIU DUILLIIIVV <br />SCALE: 1 / 16" = 1 ' -0" <br />mommmobb_4 <br />PROJECT <br />NORTH <br />'ERHANG <br />JMNS <br />IORTH EDGE <br />ACP AND <br />ON <br />ATHROOM <br />TRAILERS <br />ICATED BY <br />,CTOR. SEE <br />1. GRIDLINES SHOWN ARE ORIGINAL GRIDLINES UTILIZED IN <br />THE RECORD DRAWINGS. <br />2. FOR BUILDING DETAILS SEE "AS BUILT" RECORD <br />DRAWINGS ENTITLED WEYERHAEUSER COMPANY CARGO <br />DOCK AND WAREHOUSE ADDITION, EVERETT WASH. <br />DATED DECEMBER 8, 1978. <br />3. RECORD DRAWINGS SHOW THAT THE ORIGINAL BUILDING <br />EXTENDED 19 BAYS (456' COLUMN TO COLUMN). ONLY <br />THE SOUTHERN 11 BAYS REMAIN AND SHALL BE <br />REMOVED. <br />4. EXISTING CLOSED -IN BAYS DIFFER FROM THOSE SHOWN <br />ON THE RECORD DRAWINGS. SEE PHOTOGRAPHS ON <br />D3.2. THE CONTRACTOR IS RESPONSIBLE FOR <br />VERIFYING CURRENT BUILDING ARRANGEMENT PRIOR TO <br />BID. <br />5. FOR HAZMAT INFORMATION SEE SHEETS D3.4-D3.5. <br />AND THE "LIMITED HAZARDOUS MATERIALS SURVEY <br />REPORT, PORT OF EVERETT, SOUTH TERMINAL WHARF & <br />�- Q YARD IMPROVEMENTS - PHASE II, PROJECT", BY <br />0 = EHS-INTERNATIONAL, DATED DEC 6th, 2017. <br />0� 0 <br />ry <br />0 ;n 6. A IS TYPICAL OF FOUNDATION DEMOLITION <br />N D3.1 D3.2 <br />FOR FOUNDATION ELEMENT CONNECTED TO THE <br />GRADE BEAM AT BUILDING GRID B (WHARF GRID H). <br />I <br />0 <br />Ln <br />0 <br />0 I <br />Ln <br />on <br />1 <br />w <br />0 w <br />Q >z <br />0 = <br />0cy 0 <br />�> i <br />0 <br />N <br />7. COMPLETELY REMOVE STEM WALLS AND CONTINUOUS <br />FOOTINGS AT GRID LINES 1 AND 11. CONTINUOUS <br />FOOTINGS ARE 2' WIDE AND 8" THICK AND STEM <br />WALLS ARE 8" THICK. <br />8. SEE SHEET D2.1 FOR UTILITY DEMOLITION ASSOCIATED <br />WITH BUILDING. <br />LEGEND: <br />DEMOLISH AND REMOVE <br />EXISTING STRUCTURES AND <br />APPURTENANCES <br />IF SHEET IS LESS THAN 2204 <br />REDUCE SCALE ACCORDINGLY <br />PROJECT ENGINEER: SCALE: <br />A. BERGMAN AS SHOWN PORT OF EVERETT A. <br />NO.D3m1 <br />E.ort <br />Of <br />�G � DF WAZ ��,� DESIGNED BY: DATE: <br />_� S. STORY 12/08/2017 SOUTH TERMINAL WHARF. & C,P No. 1Tff DRAWN BY: CHECKED BY: ELECTRICAL UPGRADES ---PHASE 2 1-8-001-06 <br />EVERETT <br />16015th Avenue, Suite 1300 ��o o� UxaL� T. T. LEMONS S. KUEBLER PROJECT <br />P ; o , pox 538 <br />Seattle, Washington 98101 ® 12/08/17 SK ISSUED FOR BID AND PERMIT. ���s IE��� � APPROVED UPLAND BUILDING N0. MT—$T-2017-1 1 <br />EVERETT, WA 98206 (206) 382-0600 Fax (206) 382-0500 nAL <br />IA-11 <br />(425) 259-3164 PROJECT NO. 1600120 N0. DATE BY REVISION N0. DATE BY REVISION DEMOLITION PLAN ,��\SHEET No. 18 OF 176 <br />