My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 TERMINAL AVE 2017 Plans 2022-11-22 (2)
>
Address Records
>
TERMINAL AVE
>
3500
>
Plans
>
3500 TERMINAL AVE 2017 Plans 2022-11-22 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:20:36 PM
Creation date
6/17/2022 2:14:59 PM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3500
Permit
B1710-010
PW1710-002
Year
2017
Notes
SOUTH TERMINAL WHARF & YARD IMPROVEMENTS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J'.ItAl NOTES: <br />ASBESTOS —CONTAINING riATERli'ai_:> <br />1. THIS PROJECT INCLUDES REMOVAL AND DISPOSAL OF HAZARDOUS <br />BUILDING MATERIALS (ASBESTOS, LEAD —CONTAINING PAINT (LCP), <br />POLYCHLORINATED BIPHENYLS (PCB), AND MERCURY —CONTAINING <br />LIGHT TUBES & HID BULBS) FROM THE PORT OF EVERETT SOUTH <br />TERMINAL WHARF BUILDING T-5 LOCATED IN EVERETT, WA. <br />2. LOCATIONS OF ASSUMED ASBESTOS —CONTAINING MATERIALS (ACM) <br />SHOWN ON THE DRAWINGS ARE SCHEMATIC AND APPROXIMATE. <br />NOTE: A LIMITED HAZARDOUS MATERIALS SURVEY WAS <br />ACCOMPLISHED IN PREPARATION FOR THE WORK, THAT MEETS THE <br />REQUIREMENTS OF WASHINGTON STATE DEPARTMENT OF LABOR <br />AND INDUSTRIES DIVISION OF OCCUPATIONAL SAFETY AND HEALTH <br />(L&I DOSH) 99GOOD FAITH INSPECTION" AND PUGET SOUND CLEAN <br />AIR AGENCY'S (PSCAA) ASBESTOS INSPECTION TO LOCATE AND <br />IDENTIFY ACM EXPECTED TO BE IMPACTED BY THE PROJECT <br />(INCLUDED AS APPENDIX OF SECTION 01 1.1 1.0 SUMMARY OF <br />HAZARDOUS MATERIALS). ALL IMPACTED ACM WILL BE REMOVED <br />WITHIN THE SCOPE OF THIS PROJECT. DEMOLITION FOR ACCESS <br />TO CONCEALED ACM AND/OR ASSUMED ACM IS WITHIN THE SCOPE <br />OF WORK. IF ANY IDENTIFIED ACM, OR SUSPECT MATERIAL NOT <br />ADDRESSED BY THE "GOOD FAITH SURVEY" WILL BE IMPACTED AND <br />IS NOT CALLED —OUT BY OTHER WORK AND IS NOT CALLED --OUT <br />FOR REMOVAL, CONSULT THE PORT'S HAZARDOUS MATERIALS <br />CONSULTANT (EHSI) PRIOR TO DISTURBANCE. ANY SUCH MATERIAL <br />MUST BE TREATED AS ACM UNLESS SAMPLED BY A CERTIFIED <br />AHERA BUILDING INSPECTOR AND DETERMINED TO BE <br />NON ---ASBESTOS. <br />3. USE THE PROJECT HAZARDOUS MATERIALS SUMMARY LISTED ON <br />THIS SHEET FOR BASE BID QUANTITIES. QUANTITIES ARE <br />CONSIDERED ACCURATE WITHIN PLUS OR MINUS (+/—) TEN <br />PERCENT (10%). NO CONTRACT CHANGES WILL BE CONSIDERED <br />FOR VARIANCES IN THESE QUANTITIES OF LESS THAN 10%. <br />CONTRACTOR MUST HAVE HAZARDOUS MATERIALS CONSULTANT'S. <br />WRITTEN VERIFICATION OF QUANTITIES PRIOR TO THE REMOVAL OF <br />MATERIALS FOR CONSIDERATION OF COMPENSATION FOR <br />ADDITIONAL QUANTITIES OF MATERIAL IN EXCESS OF +10%. <br />4o THE CONTRACTOR SHALL FIELD VERIFY AND COORDINATE WITH <br />DEMOLITION PLANS, DETAILS, AND DIMENSIONS THAT MAY IMPACT <br />THE WORD. THE CONTRACTOR SHALL VERIFY THE CONDITION, <br />LOCATION, AND QUANTITIES OF HAZARDOUS MATERIALS IN THIS <br />WORK PRIOR TO SUBMITTING A BID. <br />5. REFER TO CONTRACT AND CONTRACTOR'S APPROVED WORK PLAN <br />FOR ASBESTOS REMOVAL AND DISPOSAL PROCEDURES AND <br />REQUIREMENTS. <br />6. ACMS AND ASSUMED ACMS IDENTIFIED IN THE LIMITED HAZARDOUS <br />MATERIALS REPORT AS "SALVAGE" WILL BE REMOVED BY THE POE <br />PRIOR TO COMMENCEMENT OF THE WORK. <br />16015th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206) 382-0600 Fax (206) 382-0500 <br />PROJECT NO. 1600120 <br />GENERAL NOTES: <br />LEAD —CONTAINING MATERIALS <br />1. PAINTED SURFACES WERE FOUND TO CONTAIN LEAD (E.G., <br />LEAD —CONTAINING PAINT - LCP). <br />2. REFER TO THE HAZARDOUS MATERIALS REMOVAL SPECIFICATIONS <br />FOR IMPACTS TO LEAD COATED SURFACES. REFER TO <br />SPECIFICATIONS FOR LEAD DISTURBANCES, DISPOSAL, AND TESTING <br />REQUIREMENTS. <br />3. THE CONTRACTOR SHALL ASSUME THAT LEAD PAINT IS PRESENT <br />ON ANY PAINTED BUILDING MATERIALS NOT TESTED. ALL WORK <br />THAT MAY DISTURB PAINT —CONTAINING LEAD OR OTHER LEAD <br />BUILDING MATERIAL SHALL BE IN ACCORDANCE WITH L&I <br />REGULATION WAG 296-155-176, OSHA REGULATION 29 CFR <br />1926.62, AND THE SPECIFICATIONS, INCLUDING DUST CONTROL, <br />EMPLOYEE EXPOSURE ASSESSMENTS AND WASTE <br />CHARACTERIZATION. <br />1. INSPECT ALL LIGHT BALLASTS IN THE AREA, ALL MAGNETIC <br />BALLASTS REGARDLESS OF LABELING AS "NO—PCBS" OR "PCB <br />FREE", WILL BE REMOVED AND DISPOSED OF AS HAZARDOUS <br />WASTE IN ACCORDANCE WITH THE REGULATIONS AND THE <br />CONTRACTOR'S APPROVED WORK PLAN. PARTIAL DISASSEMBLY OF <br />FLUORESCENT FIXTURES AND SELECTIVE DEMOLITION FOR ACCESS <br />ARE INCLUDED IN THE SCOPE OF WORK, REFER TO CONTRACT <br />SPECIFICATIONS/DRAWINGS, REGULATIONS, AND CONTRACTOR'S <br />APPROVED WORK PLAN FOR PCB —BALLAST REMOVAL AND <br />DISPOSAL PROCEDURES. HID LIGHTS ARE ASSUMED TO CONTAIN <br />PCB —BALLASTS AND MERCURY —CONTAINING BULBS. BALLASTS <br />LABELED "ELECTRONIC" MAY BE DISPOSED AS CONSTRUC I —ION <br />DEBRIS, <br />2. ALL FLUORESCENT LIGHT TUBES AND HID LAMPS CONTAIN <br />MERCURY AND WILL BE RECYCLED IN ACCORDANCE WITH THE <br />CONTRACT SPECIFICATIONS AND WITHOUT BREAKAGE ON SITE. <br />REFER TO THE CONTRACT SPECIFICATIONS, REGULATIONS, AND THE <br />CONTRACTOR'S APPROVED WORK PLAN FOR LIGHT TUBE/HID LAMP <br />RECYCLING PROCEDURES. <br />3. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL <br />ISOLATION OF ALL IMPACTED LIGHT FIXTURES AND THE ABATEMENT <br />CONTRACTOR, SHALL VERIFY PRIOR TO COMMENCING WORK. <br />12/08/17 FD <br />NO. DATE I BY <br />ISSUED FOR BID AND PERMIT <br />REVISION <br />NO. I DATE I BY <br />l <br />F r <br />r ! <br />'s� ! <br />D3.4 GENERAL NOTES, ABBREV'NS AND MAT'LS SUMMARY <br />D3.5 HAZMAT — BUILDING T-5 DEMOLITION PLAN <br />,s0 �, v WINI Iiym! <br />ABBRV'NS — ABBREVIATIONS <br />ACM — ASBESTOS —CONTAINING MATERIAL <br />AHERA -- ASBESTOS HAZARD EMERGENCY RESPONSE ACT <br />BLDG — BUILDING <br />CFR — CODE OF FEDERAL REGULATIONS <br />EA — EACH <br />HID HIGH INTENSITY DISCHARGE <br />L&I DOSH — WASHINGTON STATE DEPARTMENT OF LABOR AND <br />INDUSTRIES DIVISION OF OCCUPATIONAL SAFETY AND HEALTH <br />LCP — LEAD —CONTAINING PAINT <br />MAT'LS — MATERIALS <br />OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION <br />PCB — POLYCHLORINATED QIPHENYLS <br />POE — PORT OF EVERETT <br />PSCAA — PUGET SOUND CLEAN AIR AGENCY <br />TYP R-- TYPICAL <br />USEPA — US ENVIRONMENTAL PROTECTION AGENCY <br />WAC — WASHINGTON ADMINISTRATIVE CODE <br />PROJECT ENGINEER: <br />A. BERGMAN <br />DESIGNED BY: <br />R. PETERSON <br />DRAWN BY: <br />F. DIMALANTA <br />APPROVED) BY: <br />SCALE: <br />NONE <br />DATE: <br />12/08/17 <br />CHECKED BY: <br />D. ESCAMIL LA <br />PROJECT HAZARDOUS <br />MATERIALS ,S11UihiARY <br />QUANTITY/ <br />UNIT <br />DESCRIPTION (SEE LEGEND ON SHEET D3.5) <br />3 EA <br />15x4' & 1.5'x6' ELECTRICAL PANELS WITH <br />ASSUMED ACM INTERNAL COMPONENTS <br />3 EA <br />4"x6" ELECTRICAL SWITCH GEAR PANELS WITH <br />ASSUMED ACM INTERNAL COMPONENTS <br />2 EA <br />B"x 16" & 12%30" ELECTRICAL SWITCH GEAR <br />PANELS WITH ASSUMED ACM INTERNAL <br />COMPONENTS <br />2 EA <br />2x4.5' ELECTRICAL SWITCH GEAR PANELS WITH <br />ASSUMED ACM INTERNAL COMPONENTS <br />120 EA <br />MERCURY --CONTAINING FLUORESCENT LIGHT <br />TUBES AND HID BULBS <br />96 EA <br />PCB —CONTAINING MAGNETIC LIGHT BALLASTS <br />IF SHEET IS LESS THAN 22x34 <br />REDUCE SCALE ACCORDINGLY <br />CIP NO. <br />1—8-001-06 <br />PROJECT <br />NO. MT—ST--2017- 11 <br />SHEET NO. 20 OF 176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.