Laserfiche WebLink
; �, I f i I { I <br />I <br />I . I = I <br />E <br />ti ............. <br />i <br />z <br />LU <br />Uj <br />to <br />0 <br />�I <br />z <br />z <br />0. <br />U. <br />8 <br />m <br />z <br />m <br />E <br />e� <br />DA <br />CD <br />1-0 <br />m <br />m <br />z <br />m <br />UA <br />0 <br />1. ALL CONSTRUCTION SHALL CONFORM TO THESE PLANS AND SPECIFICATIONS AND <br />THE CURRENT VERSION OF THE CITY OF EVERETT STANDARDS. <br />2. CONTRACTOR SHALL VERIFY ALL LEVELS, DIMENSIONS, AND EXISTING CONDITIONS <br />IN THE FIELD BEFORE PROCEEDING. CONTRACTOR SHALL NOTIFY THE ENGINEER <br />OF ANY DISCREPANCIES OR FIELD CHANGES PRIOR TO INSTALLATION OR <br />FABRICATION. IN CASE OF DISCREPANCIES BETWEEN THE EXISTING CONDITIONS <br />AND THE PLANS, THE CONTRACTOR SHALL OBTAIN DIRECTION FROM THE <br />ENGINEER BEFORE PROCEEDING. DIMENSIONS AND CALLOUTS NOTED AS PLUS OR <br />MINUS (±) OR (REF) INDICATE UNVERIFIED DIMENSIONS AND ARE APPROXIMATE, <br />NOTIFY THE ENGINEER IMMEDIATELY OF CONFLICTS OR EXCESSIVE VARIATIONS <br />FROM AS INDICATED. NOTED DIMENSIONS TAKE PRECEDENCE OVER SCALED <br />DIMENSIONS ® DO NOT SCALE THE PLANS. <br />3. ALL LOCATIONS <br />OF EXISTING STRUCTURES AND UTILITIES SHOWN HEREIN HAVE <br />BEEN OBTAINED <br />FROM AVAILABLE RECORDS AND SHOULD, THEREFORE, BE <br />CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE <br />RESPONSIBILITY <br />OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY <br />OF ALL UTILITY <br />LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID <br />OTHER UTILITIES <br />NOT SHOWN HEREIN WHICH MAY BE AFFECTED BY THE <br />IMPLEMENTATION <br />OF THIS PLAN® THE CONTRACTOR SHALL POTHOLE OR <br />OTHERWISE CONFIRM <br />EXISTING CONDITIONS, SPECIFICALLY PIPE SIZES PRIOR TO <br />CONSTRUCTION, <br />AND BRING ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND <br />NEW WORK TO <br />THE ENGINEER'S ATTENTION. <br />4. THE EXISTING SOUTH TERMINAL WHARF STRUCTURE AND SITE UTILITIES HAVE <br />UNDERGONE NUMEROUS REPAIR AND UPGRADE PROJECTS SINCE THE TIME OF <br />THE ORIGINAL CONSTRUCTION. THESE REPAIRS MAY NOT ALL BE REFLECTED IN <br />THESE CONTRACT DOCUMENTS, REFERENCE DRAWINGS FOR THESE CONTRACTS <br />ARE AVAILABLE FROM THE PORT OF EVERETT. <br />5. A COPY OF THE PLANS SHALL BE ON —SITE WHENEVER CONSTRUCTION IS IN <br />PROGRESS. THROUGHOUT THE PROGRESS OF THE WORK OF THIS CONTRACT, <br />THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES IN <br />THE CONTRACT DOCUMENTS. UPON THE COMPLETION OF THIS CONTRACT, THE <br />CONTRACTOR SHALL PROVIDE ONE COMPLETE SET OF RECORD DOCUMENTS TO <br />THE PORT OF EVERETT. <br />6. THE CONTRACTOR SHALL LOCATE ALL UTILITIES WITHIN THE PROJECT SITE PRIOR <br />TO WORK, CONTRACTOR SHALL CONTACT 811 "CALL BEFORE YOU DIG" AND AN <br />INDEPENDENT LOCATING SERVICE TO LOCATE ALL UTILITIES AT LEAST 48 HOURS <br />PRIOR TO WORK. <br />7o THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS OF EXISTING <br />STRUCTURES AND OTHER FEATURES THAT MAY IMPACT THE WORK, CONTRACTOR <br />SHALL BRING ANY CONFLICTS TO THE ENGINEER'S ATTENTION PRIOR TO <br />BEGINNING AFFECTED WORK, <br />8. ANY DAMAGE TO EXISTING UTILITIES, OTHER FACILITIES OR EQUIPMENT DUE TO <br />THE CONTRACTOR'S NEGLIGENCE, EXCEPT FOR ITEMS DESIGNATED FOR <br />DEMOLITION, SHALL BE PROMPTLY REPAIRED BY THE CONTRACTOR AT HIS <br />EXPENSE. THIS INCLUDES ITEMS OUTSIDE THE WORK AREA AND WITHIN THE <br />PORT OF EVERETT PROPERTY THAT ARE DAMAGED BY CONSTRUCTION ACTIVITIES <br />DURING EXECUTION OF THIS CONTRACT. <br />9. PRIOR TO LAYING PIPE, THE CONTRACTOR SHALL EXPOSE EXISTING WATER, <br />STORM WATER AND SEWER PIPING AT CONNECTION POINTS TO VERIFY THAT FIELD <br />CONDITIONS MATCH INFORMATION SHOWN ON THE PLANS, SPECIFICALLY THE <br />LOCATION, ELEVATION, DIAMETER, AND MATERIAL OF EXISTING PIPE. CONTRACTOR <br />SHALL CONTACT THE ENGINEER IF DISCREPANCIES ARE DISCOVERED. <br />10, ALL ACTIVATION AND DEACTIVATION OF UTILITIES SHALL BE COORDINATED WITH <br />THE UTILITY AND THE PORT ENGINEER IN ADVANCE. PROVIDE A MINIMUM OF 3 <br />DAYS ADVANCE WRITTEN NOTICE TO THE UTILITY AND PORT ENGINEER, <br />11. SHORING AND EXCAVATION SHALL BE IN ACCORDANCE WITH STATE AND FEDERAL <br />REQUIREMENTS. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />12a THE CONTRACTOR SHALL KEEP ALL STREETS AND VEHICULAR TRAFFIC AREAS <br />USED FOR THIS WORD CLEAN AT ALL TIMES, SEE SPECIFICATIONIS FOR <br />ADDITIONAL REQUIREMENTS. <br />13. CONTRACTOR IS RESPONSIBLE FOR ANY TRAFFIC CONTROLS REQUIRED DURING <br />THE DURATION OF THIS PROJECT, PER CONTRACTOR'S OPERATION® ALL TRAFFIC <br />CONTROL SHALL BE IN ACCORDANCE WITH THE MANUAL OFUNIFORM TRAFFIC <br />CONTROL DEVICES, <br />ft <br />M.Wom,- <br />Seattle, Washing -ton 98101 <br />PROJECT NO. 1600120 <br />miuminummIMMM <br />16, MAINTAIN UTILITY SERVICE TO EXISTING BUILDINGS, UTILITIES AND FIRE HYDRANTS <br />DURING CONSTRUCTION UNLESS NOTED OTHERWISE OR APPROVED BY THE <br />ENGINEER. INSTALL NEW UTILITY LINES TO POINTS OF CONNECTION TO EXISTING <br />UTILITY LINE PRIOR TO DEMOLITION OF THE EXISTING LINES, UNLESS NOTED <br />OTHERWISE. WATER SERVICE SHUTDOWNS WILL BE LIMITED TO 2 HOURS FOR <br />EACH UTILITY CROSSOVER AND SHALL BE COORDINATED WITH THE ENGINEER. <br />POWER AND COMMUNICATION SHUTDOWNS SHALL BE LIMITED AND SHALL BE <br />COORDINATED WITH THE ENGINEER. SEE SPECIFICATIONS FOR. FURTHER <br />SHUTDOWN REQUIREMENTS. <br />17. CONTRACTOR— INITIATED CHANGES SHALL BE SUBN41TTED IN WRITING TO THE PORT <br />R APPROVAL PRIORFABRICATION <br />SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT. <br />18. THE CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PREVENT INTERRUPTION <br />OF OPERATIONS AND PROTECT ALL EXISTING SURFACES/STRUCTURES TO REMAIN <br />AT THE FACILITY DURING CONSTRUCTION. DETAILS SHALL BE PRESENTED IN THE <br />CONTRACTOR'S WORK PLAN. <br />19. PROJECT NORTH AS INDICATED ON THESE DRAWINGS IS FOR CONVERSATIONAL <br />GENERAL DIRECTIONAL REFERENCE. BEARINGS NOTES ON DRAWINGS ARE RELATIVE <br />TO TRUE NORTH. <br />21. SOUTH TERMINAL WHARF IS A SECURE PORT FACILITY. ALL PERSONNEL <br />ACCE SSING THE FACILITY SHALL HAVE CURRENT TWIC CARDS AND/OR ESCORT. <br />SEE SPECIFICATIONS FOR ADDITIONAL SPECIAL ACCESS AND WORK ZONE <br />REQUIREMENTS. <br />22. SOUTH TERMINAL WHARF IS ON THE WASHINGTON STATE DEPARTMENT OF <br />ECOLOGY LIST OF CONTAMINATED SITES AND IS CURRENTLY IN THE MTCA <br />CLEANUP PROCESS. REFER TO THE SOIL AND GROUNDWATER MANAGEMENT PLAN <br />IN APPENDIX B OF THE SPECIFICATIONS FOR ADDITIONAL INFORMATION. <br />24. SEE ALSO STRUCTURAL GENERAL NOTES ON SHEETS S1.1—S103. <br />LEGEND: <br />BORE HOLE_O— <br />MONUMENT WELL <br />X_X <br />CLIF <br />WATER VALVE <br />. OHW _ _ <br />OHW <br />WATER SPIGOT <br />SS <br />0 SANITARY SEWER MANHOLE <br />STORM DRAIN MANHOLE <br />TELEPHONE RISER <br />-- GUY ANCHOR <br />FBEM ELECTRIC METER <br />— — -- - SD <br />SD <br />LUMINARE <br />_BP — _ <br />Bp <br />T T <br />T <br />W— <br />w <br />A 12/08/17 NW ISSUED FORBID AND PERMIT. <br />NO. DATE I BY I REVISION <br />NO. I DATE I BY I REVISION <br />1, ALL UNDERGROUND AND AT GRADE STRUCTURES INCLUDING MANHOLES, CATCH <br />BASINS, HAND HOLES, VAULTS, CLEANOUTS AND OTHER STRUCTURES, INCLUDING <br />ALL RINGS, COVERS, HATCHES, GRATES AND OTHER FEATURES WHICH MAY APPLY, <br />SHALL BE CONTRACTOR DESIGNED TO WITHSTAND LOADING CRITERIA SHOWN IN THE <br />STRUCTURAL SCHEDULE ON SHEET S1.3. <br />LID CASTING AND FRAME SHALL BE 200 KIP PROOF TEST LOAD RATED PER <br />AASHTO M306a <br />CONTRACTOR SHALL SUBMIT STAMPED AND SIGNED SHOP DRAWINGS AND <br />CALCULATIONS COMPLETED BY A WASHINGTON STATE REGISTERED STRUCTURAL <br />ENGINEER FOR APPROVAL BY THE ENGINEER PRIOR TO FABRICATION OF ALL <br />UNDERGROUND UTILITY STRUCTURES, SHOP DRAWINGS AND CALCULATIONS PROVIDED <br />BY THE CONTRACTOR SHALL ADDRESS BUOYANCY AND SOIL BEARING PRESSURE. <br />2. STANDARD PLAN REFERENCES AND MANUFACTURER MODEL NUMBERS FOR <br />UNDERGROUND UTILITY STRUCTURES ARE INTENDED TO PROVIDE INTERIOR <br />GEOMETRY AND INTENT ONLY® THE CONTRACTOR SHALL INCREASE REQUIRED <br />REINFORCING AND WALL THICKNESS, AND CHANGE ACCESS GRATE AND COVER AS <br />REQUIRED TO ACCOMMODATE LOADING CRITERIA REQUIREMENTS. <br />o REFER TO THE GEOTECHNICAL ENGINEERING DESIGN STUDY DATED DECEMBER 6, <br />2017 PREPARED BY HART CROWSER FOR SOIL DESIGN CRITERIA. <br />4. DEAD LOAD SHALL BE APPLIED TO ALL STRUCTURES, WHICH INCLUDES THE WEIGHT <br />OF THE CONSTRUCTION MATERIALS AND THE SOIL. <br />5a LIVE LOADS SHALL BE APPLIED TO ALL STRUCTURES TO ACT SIMULTANEOUSLY AND <br />IN COMBINATION WITH DEAD LOADS, SOIL LOADS AND HYDROSTATIC PRESSURE. <br />6. MEASURED DEPTH TO GROUNDWATER IN THE UPLAND AREAS OF THE SOUTH <br />TERMINAL WHARF RANGES 6.5 TO 11.5 FEET BELOW GROUND SURFACE (BGS <br />ELEVATION APPROXIMATELY + 1 1 ' TO +6' MLLW DATUM). DEWATERING MAY BE <br />REQUIRED FOR INSTALLATION OF UTILITY LINES AND STRUCTURES DEPENDING UPON <br />LOCATION, TIME OF YEAR AND TIDE ELEVATION. SEE SPECIFICATIONS AND SOIL AND <br />GROUNDWATER MANAGEMENT PLAN FOR ADDITIONAL GROUNDWATER INFORMATION. <br />ABBREVIATIONS <br />REFER TO SHEET G1.2 FOR ABBREVIATIONS. <br />CONTOUR LINE <br />EXISTING CHAINLINK FENCE <br />EXISTING OVERHEAD WIRE LINE <br />EXISTING SANITARY SEWER LINE <br />EXISTING UNDERGROUND POWER LINE <br />EXISTING WATER LINE <br />EXISTING FIBER OPTIC <br />EXISTING STORM DRAIN <br />BURIED POWER LINE <br />TELEPHONE LINE <br />WATER LINE <br />EX PIPE SLOPE <br />PROPOSED PIPE SLOPE DIRECTION <br />EX GRADE SLOPE DIRECTION <br />PROPOSED GRADE SLOPE DIRECTION <br />SECTION OR ELEVATION <br />SHEET-- SHEET <br />WHERE SECTION WHERE SECTION <br />OR ELEVATION OR ELEVATION OCCURS <br />IS CALLED FROM <br />all <br />SCALE: <br />AS SHOWN <br />DATE. <br />12/8/2D17 <br />CHECKED BY: <br />N. WATSON <br />SCALE. 1 /2" m V-0" <br />IF SHEET IS LESS THAN 22x3 <br />REDUCE SCALE ACCORDINGLY <br />DWG. NO, G1 w3 <br />CIP NO. <br />1--6-001—®®6 -- <br />PROJECT <br />NO. MT— ST-2O 17-1 1 <br />SHEET NO. 4 OF 176 <br />