Laserfiche WebLink
�I <br />z <br />U <br />z <br />re- <br />LL <br />w <br />z <br />M <br />0 <br />co <br />�I <br />m <br />V <br />CL <br />CA <br />a) <br />M <br />LLJ <br />m <br />m <br />z <br />LLj <br />Lu <br />LU <br />4 I ! <br />% 1 \ <br />BAY <br />,�-®__- <br />PORT GARDNE <br />EX SECURITY <br />{ % MHH=YV (1 1 01 O'FENCE/EOP <br />i <br />I EX ACP PAVING I <br />/ <br />OHW EL®1 W,00 ; 1 <br />t f b } m I <br />1 <br />,r rt ? i 1 E LEC VAULT, SEE <br />m <br />ELEC SHEETS. <br />EX VEG , m I <br />I <br />TO H OF LOPE <br />EL 417.00`t LOC APPROX ' , 1 C 1 ) <br />� I EX 12" CMP SID i lj <br />` � f <br />LOC APPROX <br />A, t SEE SHEET C2e1 FOR t ' PROTECT IN , <br />PLACE. <br />TF_'MPORAR,� RE60CATION <br />{if <br />O� SECURITY FEiNCE TO , <br />ACCOMMODATE WORK <br />?t MODULAR WETLAND SYSTEM <br />(MWS--L-8®16®V) <br />/ ( j 4� _ <br />��05 OR APPROVED EQUAL. <br />EX RIP�AP SLOPE9 q / ,` <br />DLO J <br />4 <br />r <br />y ry REPL,_..TSLF EX V.29y GALV' CMP ® <br />_. OUTFALL WITH .iN EW 1 f ALU M N U M <br />CM .--�O,QTFALL/, S=1 o5,3 �' �' ��% <br />1 3LF�-6PVC <br />k �M�ATCH EX= OUTFALL IE=11 060 <br />m ` <br />SDI D <br />• _._ ., ____ .-- __ai f� �rJ I E `m' 1 `T" o aJ 5 9 E �"S <br />DIE=1304± (E2" SD) <br />48" DIA TYPE, f2 _CB.. W/Swo <br />EX TIMER DECK — — -- <br />LI® PER Cur- STDi,,.. <br />RIM®1 &00 <br />T__T <br />IE=14,808 6" IN (NE) }� EX 12 SD <br />IE 2a40 19f N�S —-- <br />- 89 <br />I 10 3, 15" S iV <br />PUMP CHAMBER <br />HYDROGRAPHY IS BASED ON A <br />PDF OF THE SOUTH TERMINAL <br />BULKHEAD RENOVATION (SITE A) <br />PROJECT, PLAN DATE C/ 1 O/ 1 6, <br />PROJECT NO, MT—ST®201 G-04o <br />REPL 7LF EX 12" GALV CMP <br />SD WITH NEW 15" DIA <br />ALUMINUM CMP SD, S=2086% <br />CDEX SOUTHERN OWS VAULT TO BE <br />REPURPOSED AS HIGH —FLOW <br />BYPASS AND PUMP CHAMBER. <br />LDT— `� CT1C 3 IE�-13o2712IN (NE, SE) <br />EX IE= 12e779 1299 IN (NW) <br />IE=12e699 12" OUT (DEMO) <br />IE=12060' 15" OUT (NEW) - - <br />SEE SHEET E3.5 FOR <br />TRANSFORMER AND <br />ELECTRICAL/CONTROL PANELS <br />FOR PUMPS AND TRAILERS <br />1601 5th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206) 3 2-0600 Fax (206) 382-0500 <br />PROJECT NO. 1600120 <br />1 STORM- <br />C2.11C4.1 SCALE: 1 "m5' <br />a <br />12/08/17 <br />NW <br />ISSUED FOR BID AND PERMIT. <br />NO. <br />DATE I <br />BY <br />REVISION <br />25LF-3" DI SDFM <br />HIM J <br />wm31 <br />VALVE VAULT, <br />SEE SHEET C4o3 <br />RIM ®17.75' <br />IE=14®87' <br />REVISION <br />SD <br />MAP <br />3.0, <br />"I, �0 1;y/ <br />sin <br />NOTES <br />I 1 NO PART OF THE DRAINAGE SYSTEM SHALL DE COVERED, CONCEALE®, <br />® -- OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND <br />I <br />ELEC' TATION, ACCEPTED BY THE ENGINEER. <br />EOEC DWGS° ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT <br />} DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE <br />WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL <br />CONSTRUCTION (CURRENT EDITION). <br />APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED <br />FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE <br />I <br />/ \ CONTRACTOR SHALL DE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br />AND ELEVATIONS, AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES <br />SHOWN. IF CONFLICTS WITH EXISTING UTILITIES OR DISCREPANCIES ARISE <br />RPBA, )SE <br />SHEET C3o4 DURING CONSTRUCTION,. THE CONTRACTOR SHALL NOTIFY THE ENGINEER <br />t, AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE ENGINEER <br />PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT, <br />h <br />4 TEMPORARILY RELOCATE EXISTING RIPRAP/ARMOR ROCK TO AREAS <br />->14 i ADJACENT TO OUTFALL REPLACEMENT WORK. REPLACE RIPRAP AFTER <br />�. OUTFALL INSTALLATION TO RESTORE EXISTING SLOPE AND OUTFALL <br />Y,—< <br />PROTECTION. <br />CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN TEMPORARY <br />j STORMWATER BYPASS PUMPING AROUND EXISTING VAULT (OR PROVIDE <br />OTHER MEANS AS APPROVED BY THE ENGINEER) AS NECESSARY TO <br />MAINTAIN UPSTREAM DRAINAGE DURING STORMWATER MODIFICATION <br />W METER & FH CONTRUCTION. <br />- S-E E S-H-E--ET C3.1 <br />4' BOLLA D (2), i <br />614.1 C3a4 TYP <br />[\A 6M <br />69 BOLL RD TYP, UN <br />Coo 11 C3.4 <br />8" DI W SEE <br />SHEET C3o 1 <br />1 <br />0 tl <br />1� <br />1 � <br />1 <br />t ` <br />EX TIMBER BULKHEAD, <br />11 C4.1 C4,2 LOCATION APPROX. <br />(6 1 r TOP EL=12a32 <br />IE=15o5 fit.--S9- SDFM � <br />IE=1301 ± \ (EX 12" SD) <br />t <br />EX CB, TYPE 2 (48$e 0) <br />RIM=17a 129 <br />IE--­ 13a479 12" CMP (NE <br />IF=13o1 Gy 12" CMP (SN'v, w <br />'0 <br />11 <br />1, <br />1 <br />1 <br />�i <br />11 <br />t <br />i <br />EX 12)9 SD <br />SE <br />SCALE: <br />AS SHOWN <br />DATE: <br />12/08/2017 <br />CHECKED BY: <br />No WATSON <br />EXISTING PIPE SLOPE DIRECTION <br />NEW PIPE. SLOPE DIRECTION <br />SUBMERSIBLE PUMP <br />BOLLARD <br />WATER SURFACE <br />TOP OF SLOPE <br />IF SHEET IS LESS THAN 22x34 <br />REDUCE SCALE ACCORDINGLY <br />�Immrlkl• <br />CIP NO, <br />1®8-001-06 <br />PROJECT <br />NO. MT—ST-2017-1 1 <br />SHEET NO. 48 OF 176 <br />