My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1717 13TH ST 2021 Plans 2022-12-01
>
Address Records
>
13TH ST
>
1717
>
Plans
>
1717 13TH ST 2021 Plans 2022-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:20:47 AM
Creation date
6/21/2022 3:26:33 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1717
Permit
B2107-050
Year
2021
Notes
REPLACE TOMOGRAPHY UNIT AND LINEAR ACCELERATOR UNIT WITH NEW
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIR COMPRESSOR <br />CHEULE <br />NOISE <br />MOTOR <br />TAG <br />SERVICE <br />LOCATION <br />BASIS OF DESIGN <br />TYPE <br />SERIES / MODEL <br />MAXIMUM DESIGN <br />MINIMUM DESIGN <br />MAXIMUM DESIGN <br />WEIGHT <br />SIZE <br />REMARKS <br />FLOWRATE (SCFM) <br />PRESSURE (PSIG) <br />PRESSURE (PSIG) <br />(DBA) <br />(LOS) <br />LxWxH (IN) <br />HP <br />FLA <br />VOLTS <br />PH <br />kc-TOMO-1 <br />TOMO <br />COP ROOM <br />POWEREX <br />OIL FREE o SCROLL <br />SET30B <br />93.6 <br />100 <br />116 <br />66 <br />1,110 <br />42X34X62 <br />10 <br />36.5 <br />460 <br />3 <br />ALL <br />1. <br />INCLUDE MOISTURE SEPARATOR AND AUTOMATIC <br />DRAIN <br />2. <br />OIL FREE SCROLL COMPRESSOR <br />2. <br />INTEGRATED FACTORY CONTROLS, INCLUDING PO EREX VARIABLE -PUMP -DRIVE CONTROL LOGIC <br />4. <br />AIR-COOLED AFTERCOOLER, DISCHARGE CHECK VALVE, AND HIGH <br />DISCHARGE TEMPERATURE SHUT DOWN SWITCH <br />5. <br />PROVIDE DRY CONTACTS, CONNECT TO BUILDING BAS FOR COMPRESSOR MONITORING (COMPRESSOR STATUS AND MS) <br />. <br />PROVIDE SEISMIC RESTRAINT CALCULATIONS AND ANCHOR DETAILS <br />BY DESIGN/BUILD AS A DEFERRED SUBMITTAL FOR ALL <br />EQUIPMENT OVER 400 LBS <br />7. <br />PROVIDE WITH VIBRATION ISOLATION BASE <br />AIR DRYER <br />SCHEDULE <br />TAG <br />SERVICE <br />LOCATION <br />BASIS <br />DESIGN F <br />DESIGN FLOW <br />CAPACITY (SCFM) <br />PURGE VOLUME <br />(SCFM) <br />E <br />OUTLET DEW <br />POINT (DEC. <br />SIZE <br />(LxWNxH o <br />ALBS) <br />ERIES / MODE NOTE <br />V/PH/HZ <br />AD-TOMO-1 <br />TOO <br />COMP ROOM <br />ZEKS <br />66 <br />15.9 <br />DESICCANT <br />-40 <br />120/1/60 <br />8.7X15.9 73. <br />140 <br />88ZMA ALL <br />1. MICROPROCESSOR CONTROLLER 3-15ZMA <br />2. PURGE CONTROL VALVE, STAINLESS STEEL PURGE VALVES, <br />EXTRUDED ALUMINUM VESSEL, TOWER PRESSURE GAUGES, COALESCING PREFILTER, PARTICULATE AFTERFILTER, EXHAUST MUFFLERS <br />COMPRESSED AIR POINTS OF USE SCHEDULE <br />CA SOURCE DEMAND <br />COMP ® POINT OF USE PRESSURE T <br />COMPRESSOR EQUIPMENT E (PSI) <br />Roots ME FLLOO W NOTES <br />CYL m CYLINDER (SCFM)) <br />TOMO COMP TOMO 90 30.00 <br />RECEIVER SANK SCHEDULE <br />TAG LOCATION SERVICE <br />TYPE <br />VOLUME <br />(GAL.) <br />CONNECTION <br />SIZE (IN.) <br />MAX. WORK. <br />PRESS. <br />(PSIG) <br />SIZE) <br />(IN') <br />OPERATING <br />WEIGHT <br />(LBS.) <br />BASIS OF DESIGN <br />NOTES <br />MFR <br />AR-TOMO-1 COMPRESSOR ROOM TOO <br />VERTICAL <br />120 <br />2 <br />200 <br />24x67 <br />325 <br />MANCHESTER <br />ALL <br />C� <br />(D <br />2727 Oakes Ave. <br />Suite 100 <br />Everett, WA 98201 <br />7/9/21 <br />0 <br />0 <br />Lo <br />MA <br />cl <br />I sum <br />JOB. NO. <br />211040 <br />DRAWN BY <br />CEI <br />CHECKED BY <br />HB <br />PERMIT ISSUE <br />07-09-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.