Laserfiche WebLink
M f. NOTE: <br />TRANSTECTOR PCU <br />INSTALLATION LOCATION TBD <br />BY CUSTOMERS DESIGN TEAM. <br />Customer Supplied <br />S & R Cooling Lines <br />TrueBeam Plan <br />Scale: 1 /8" = 1'41 <br />Cooling Line <br />Conduit Sleeves <br />EQUIPMENT <br />1VF/V1 <br />01 <br />Stand <br />02 <br />Gantry <br />VF/VI <br />03 <br />Modulator Cabinet <br />VF/Vl <br />04 <br />Treatment Couch <br />VF/V1 <br />05 <br />Couch Rotation Arcs <br />(min. mandatory 8'-4 1/2" and max. 9'-0" <br />06 <br />I socen ter <br />- <br />07 <br />TrueBeam Workstation <br />Dedicated Keyboard & CCTV Monitors (Qty:4) <br />VF Vl <br />Og <br />Control Cabinet, 2-1 Configuration <br />(5'-1 7/16"H x 2'-2 7/16"W x 2'-9 7/16"D) <br />VF/ VI <br />09 <br />Optical Imaging Camera Note' <br />VF/VI <br />10 <br />In —Room Monitors (0ty:1 Set) Note' <br />VF/VI <br />11 <br />CCTV Camera (Qty.- 4) Note' jVF/V1j <br />12 <br />Live View Camera w/Mic Note' <br />VF/VI <br />13 <br />Microphone (ceiling) Note' <br />VF/VI <br />14 <br />Wireless Keyboard/Mouse <br />VF/Vl <br />15 <br />Speaker (Qty.- Note' <br />VF/Cl <br />Patient Positioning Lasers <br />17 <br />(Qty.4) 2 side, 1 sagittal, and 1 ceiling, <br />VF/VI <br />LAP Apollo (Green), Note' <br />Warning Lights <br />18 <br />(Qty.2) Beam -On & X-Ray-On, verify additional <br />CF/CI <br />requirements with the regional regulatory agency <br />19 <br />Control Console Pull Box <br />CF Cl <br />/ <br />(30"x 12" x 6") <br />2� <br />Modulator Pull Box <br />CF Cl <br />/ <br />(24" x 18" x 10") <br />21 <br />BaseFrame Pull Box <br />CF/Cl <br />(24" x 12" x 10") <br />22 <br />Accessory Pull Box <br />CF/Cl <br />(24"W x 18"L x 12"D - minimum) <br />Shielded Door <br />23 <br />(Verify with door manufacturer on overall <br />CF/CI <br />dimensions and installation requirements) <br />Relay Junction Box <br />4 <br />VF/ CI <br />(20"H x 16"W x 6"D) <br />Main Circuit Breaker Panel <br />VF/CI <br />25 <br />(37 1 /4"H x 25 1 /2"W x 9 1 /4"D, 179 lbs.) <br />26 <br />IEC 60309 Receptacle <br />VF/Cl <br />Transtector Power Conditioner <br />30 <br />VF Cl <br />f <br />(66"H x 29"W x 36"D, 1,142 lbs.) <br />VF = Varian Furnished, CIF = Contractor Furnished, <br />VI = Varian Installed, Cl = Contractor Installed <br />Note' : Contractor to install mounting hardware. <br />NOTE: <br />CROSS-SECTION AND/OR STRUCTURAL DRAWINGS <br />NOT PROVIDED. SECTION IS ONLY TYPICAL. DOES <br />NOT REFLECT SITE SPECIFIC CONDITIONS. <br />NOTE: Varian Provided GCX 7'-1011 <br />mounting posts, can be installed up <br />to a Max 1 V-6" to the top of 61-7" <br />mounting bracket. If interstitial space <br />is higher 1 V-6"a customer Verify existing concrete configuration <br />provided/gc installed steel support meets the customer's Physicist of <br />detail will be needed. Record Shielding Calculations. <br />Typical Section - Side Elevation <br />Scale: 1 /8" = V-0" <br />