My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1717 13TH ST 2021 Plans 2022-12-01
>
Address Records
>
13TH ST
>
1717
>
Plans
>
1717 13TH ST 2021 Plans 2022-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:20:47 AM
Creation date
6/21/2022 3:26:33 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1717
Permit
B2107-050
Year
2021
Notes
REPLACE TOMOGRAPHY UNIT AND LINEAR ACCELERATOR UNIT WITH NEW
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2'-11 of <br />48"W x 84" H <br />net CLEAR <br />opening <br />minimum <br />CA <br />PLAN <br />Equipment <br />ELEVATION <br />Stand Weight: <br />3,240 lbs. [1470 kgs.] <br />pauet, Dy varian <br />Gantry Weight: <br />9,431 lbs. [4278 kgs.] <br />Factory Break Shipping Configuration <br />Scale: 1 /4" = 1'-0" <br />NOTES: <br />1. During installation, TrueBeam components must be stored in a secure area of about 250 square feet <br />(23 square meters). <br />2. Rigging is defined as the positioning of the BaseFrame and Linear Accelerator components into the <br />treatment The BaseFrame is rigged prior to the rest of the equipment and delivery must be scheduled by the <br />construction Contractor with the Installation Project Manager. As designated in the final Varian/Customer <br />Terms and Conditions of Sale, a rigging company is hired by the Customer or Varian to off-load these items <br />from the truck and to move them through the facility and into the treatment room. <br />3. Varian will review the installation route upon request. Coordinate all rigging with the Installation <br />Project Manager. Final confirmation of rig route clearances and review of adequate structural support along <br />the route is the responsibility of the Customer and the Structural Engineer of Record. The rigging <br />preparation work can include temporary demolition and shoring. Final equipment positioning is part of the <br />rigging contract. <br />TrueBearn Simplified Rigging Path <br />Scale: 1 /8" = 1'-0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.