Laserfiche WebLink
A Y i <br />R'S j <br />a, <br />v <br />x <br />i 4 4 <br />o c?-- <br />(E) <br />2500A/3P <br />(E) ° / (E) ' (E) <br />20013 1 200/3 l 400/3 <br />(E) I ( (E) (E) (E) <br />PANEL PANEL j PANEL PANEL <br />'Hl' 'N4' 'H2' 11 712' <br />(E) (E) <br />(E) j (E) <br />100/3 �` 600/3 <br />�` <br />0 60013 J 60013 <br />� <br />Ali jI <br />i <br />j (E) <br />, <br />(E) <br />PANELPANEL <br />`HT <br />'HT <br />i <br />r- —� <br />-- <br />(E) J <br />■ <br />(E) <br />600/3 <br />(E) 0lJ (E) <br />600/3 nl 400/3 <br />(E) I (E) <br />PANEL jTRANSFC <br />H6, i TV <br />(E) <br />430-120/203 <br />_ STEP-DOWN <br />TRANSFORMER <br />EXISTINO'SD2' (ELECTRICAL MEZZANINE) <br />1000A, 120/206V, 3P, 4W <br />F <br />(E) <br />1000A <br />MCB <br />Jt (E) 1 (E) (E) (E) : J'I (E) o f (E} <br />' 200A13P 200A/3P 200A/3P f 400A/3P 40OA/3P 15OA13P <br />j (E) (E) (E) (E) (E) (E) <br />I PANEL PANEL PANEL PANELPANEL (E) 'BAKERY <br />{ 'PT ?5' 'Pill 'P3-1' 'P3-2' R � DISHWASHER'' <br />PARTIAL <br />EXISTING <br />wINE DIAGRAM <br />DEMOLFFION <br />NEW DUAL -LEVEL, EXTENDED COVERAGE OCCUPANCY SENSOR SUITABLE FOR COOLER -BOX USE, MATCH <br />EXISTING BOX OPERATION. <br />CONDUCTORS7 1-) INSTALL NEW PULLBOX SIZED AS REQUIRED TO ACCOMMODATE INTERCEPTING AND EXTENDING EXISTING <br />__- . <br />/REPLACEMENT EQUIPMENT. <br />MR I M-11 111 <br />10 NEW <br />) DEMOLITION <br />A2 <br />(R) RELOCATED <br />1 I ELECTRICAL JUNCTION BOX <br />r <br />JJ REFRIGERATION TEMPERATURE PROBE <br />(WIRED BY OTHERS) <br />ELECTRICAL CONDUIT <br />os OCCUPANCY SENSOR SWITCH <br />EXfSTlN� °MSI3' (ELE� ME�Z IN RE�EIVfN� DOCK AREA} <br />2500A, 480/277V, 3P, 4W <br />1, ALTERATIONS TO EXISTING WORTS BEING OF SUCH NATURE THAT ALL FACETS OF THE WORK BEING IMPOSSIBLE TO <br />DETAIL AND SPECIFY. IT IS THEREFORE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO CAREFULLY <br />EXAMINE THE BUILDING AND FAMILIARIZE HIMSELF WITH THE CONDITIONS AS RELATED TO THE PROPOSED WORK. <br />2. ELECTRICAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH THE DRAWINGS BEFORE PROCEEDING WITH ANY <br />WORK. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ESTABLISH DIMENSIONAL CONTROL LINES FOR <br />HIS SUB -CONTRACTORS TO CHECK THEIR LAYOUT WORK RELATIVE TO NEW WALLS AND THE WORK OF OTHER <br />SUB -CONTRACTORS. REPORT ANY PLAN CONFLICTS OR DISCREPANCIES TO ARCHITECT/ENGINEER, WITH COPIES TO <br />COSTCO'S PROJECT MANAGER AND COSTCO`S CONSTRUCTION MANAGER, FOR CLARIFICATION. ANY REMEDIAL <br />WORK REQUIRED AS A RESULT OF NOT FOLLOWING THESE PROCEDURES SMALL NOT ENTITLE THE GENERAL <br />CONTRACTOR OR ELECTRICAL CONTRACTOR TO ANY ADDITIONAL COMPENSATION. <br />3. ALL WIRING FOR CIRCUITS TERMINATING 75' OR MORE FROM PANEL SHALL BE SIZED NOT LESS THAN #10 AWG. <br />4. ALL ELECTRICAL EQUIPMENT AND RECEPTACLES SHALL HAVE GROUNDED TYPE SERVICES. <br />5. ALL CONDUCTORS SHALL BE COPPER. <br />6. ALL CONDUCTORS ABOVE SIZE #6 SHALL BE THW. <br />7� ALL NEW CIRCUITS SMALL BE RUN OVERHEAD UNLESS NOTED OR INDICATED OTHERWISE, <br />3, ELECTRICAL CONTRACTOR MAY REUSE EXISTING ELECTRICAL STUB -UPS IF FOUND TO BE ACCEPTABLE SIZE AND <br />LOCATION. <br />9. ALL ELECTRICAL WORTS SHALL CONFORM TO CODES. <br />10, ELECTRICAL CONTRACTOR TO FIELD CONFIRM LOCATION AND USE OF ALL CIRCUITS IN REVISED PANELS. PROVIDE <br />NEW TYPED DIRECTORIES IDENTITING ALL CIRCUITS IN ALL PANELS, PROVIDE IDENTIFICATION ON ALL NEW <br />DISCONNECT SWITCHES, CONTACTORS, ETC. DYMO TYPE "STICK ON" LABELS ARE NOT ACCEPTABLE. REPLACE ANY <br />MISSING OR LOOSE COVERS. <br />11. ANY ELECTRICAL WORK. WINCH SHALL INTERFERE WITH NORMAL OPERATION SHALL BE DONE .AFTER <br />STORE HOURS. <br />12. ELECTRICAL CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL SERVICE TO REFRIGERATION UNITS AND OTHER <br />AREAS OF WORK AS NECESSARY. <br />13. REFRIGERATION RACK AND/OR CONDENSER UNIT DESIGNATIONS ARE FOR REFERENCE ONLY. EXACT LOCATION AND <br />ORIENTATION SHALL BE FIELD VERIFIED PRIOR TO PERFORMING WORK. <br />14. REFER TO THE ARCHITECTURAL DEMOLITION SHEET D1 FOR ADDITIONAL WORK BY THIS CONTRACTOR. <br />1. CONTRACTOR SHALL FURNISH AND INSTALL .ALL CONDUIT, J®BOXES AND CABLES AS REQUIRED FOR <br />REFRIGERATION/EMS CONTROL INCLUDING LEAK DETECTION SYSTEM. SEE REFRIGERATION AND EMS DRAWINGS <br />FOR CONDUIT ROUTING AND CABLE TYPE/SIZES. PROVIDE SUFFICIENT SLACK CONDUCTOR AT EACH END FOR <br />TERMINATION BY OTHERS. CONDUIT TO BE ROUTED TO BAR JOIST HEIGHT, THEN HOMERUN, PROVIDE A <br />COMPLETE RACEWAY SYSTEM FOR ALL LOW VOLTAGE CABLES, <br />16. PLANS AND INSTALLATION SHALL COMPLY WITH THE 2016 SAN FRANCISCO ELECTRICAL CODE AND 201 <br />CALIFORNIA ELECTRICAL CODE. <br />17. ELECTRICAL EQUIPMENT SHALL BE LISTED BY A CITY AND COUNTY OF SAN FRANCISCO RECOGNIZED <br />ELECTRICAL TESTING LABORATORY OR APPROVED BY DBI. <br />16, NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED <br />WITHIN THE DEDICATED SPACE ABOVE THE NEW ELECTRICAL EQUIPMENT (110.26(E)(1)). <br />19. PROVIDE AND MAINTAIN REQUIRED WORK SPACE, ADEQUATE ILLUMINATION, ACCESS TO WORTS SPACE AND <br />DEAD ROOM ABOUT ELECTRICAL EQUIPMENT (110.26). <br />PARTIAL EXISTIN-G ONE -LINE DIAGRAM. <br />NEW <br />www, ctagroup.com <br />300.757.9522 <br />0 <br />L0 <br />CN <br />0 <br />00 <br />Z <br />00 <br />w <br />�e <br />cq <br />0 <br />T­ <br />a <br />@ 2018 1 ALL RIGHTS RESERVED <br />DRAWN I RANSOM <br />REVISIONS <br />1 - C:T( COMMENTS 08.08.2018 <br />2 - CITY COMMENTS 08.29.2018 <br />3 - CITY COMMENTS 09.14.2018 <br />5- PHASING COORDINATION 03.14.2019 <br />L:%COSTCO\0114 Everett, WAOMCAMEIec\0114_E001 ONELINE DETAILS.DWG <br />