Laserfiche WebLink
CONSTRUCTION NOTES <br />CUSHING <br />STERRELL <br />ARCHrrECTS ENGINEERS <br />INSTALL 3/4"C FOR LOW VOLTAGE CABLES FROM REFRIGERATION CASE/COOLER/FREEZER TO <br />REFRIGERATION SYSTEM SHOWN OR REMOTE REFRIGERATION CONTROL PANEL. <br />2/ , EXISTING EQUIPMENT/FIXTURE TO BE RELOCATED. EXTEND EXISTING CONDUIT AND CONDUCTORS AS <br />REQUIRED AND RECONNECT EQUIPMENT/FIXTURE. PROVIDE NEW HARDWARE AS NECESSARY. <br />INTERCEPT EXISTING CIRCUIT(S) AND EXTEND TO NEW/REPLACEMENT EQUIPMENT, EXTEND EXISTING <br />CONDUITAND CONDUCTORS AS REQUIRED AND RECONNECT EQUIPMENT. PROVIDE NEW HARDWARE AS <br />NECESSARY. COORDINATE CONTROL WITH REFRIGERATION CONTRACTOR. <br />NEW DUAL -LEVEL, EXTENDED COVERAGE OCCUPANCY SENSOR SUITABLE FOR COOLER -BOX USE, MATCH <br />EXISTING BOX OPERATION. <br />NEW HEATED PREP SLIDING WINDOWS TO REPLACE EXISTING. PRESERVE EXISTING CONNECTIONS AND <br />5 1) <br />EXTEND TO NEW. PROVIDE NEW HARDWARE AS NECESSARY, <br />6,� NEW KITCHEN HOOD TO REPLACE EXISTING. PRESERVE EXISTING CONNECTIONS AND EXTEND SHUTDOWN <br />INTERLOCK TO NEW ROTISSERIE OVENS AND ANY OTHER NEW EQUIPMENT INSTALLED UNDER HOOD. <br />PROVIDE NEW HARDWARE AS NECESSARY, <br />11 NEW <br />fj(D) DEMOLITION <br />(R) RELOCATED <br />ELECTRICAL JUNCTION BOX <br />REFRIGERATION TEMPERATURE PROBE <br />(WIRED BY OTHERS) <br />ELECTRICAL CONDUIT <br />OCCUPANCY SENSOR SWITCH <br />I . ALTERATIONS TO EXISTING WORK BEING OF SUCH NATURE THAT ALL FACETS OF THE WORK BEING IMPOSSIBLE TO <br />DETAIL AND SPECIFY. IT IS THEREFORE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO CAREFULLY <br />EXAMINE THE BUILDING AND FAMILIARIZE HIMSELF WITH THE CONDITIONS AS RELATED TO THE PROPOSED WORK, <br />2. ELECTRICAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH THE DRAWINGS BEFORE PROCEEDING WITH ANY <br />WORK. IT IS THE RESPONSIBILITY OF THE GENERAL. CONTRACTOR TO ESTABLISH DIMENSIONAL CONTROL LINES FOR <br />HIS SUB -CONTRACTORS TO CHECK THEIR LAYOUT WORK RELATIVE TO NEW WALLS AND THE WORK OF OTHER <br />SUB -CONTRACTORS. REPORT ANY PLAN CONFLICTS OR DISCREPANCIES TO ARCHITECT/ENGINEER, WITH COPIES TO <br />COSTCO'S PROJECT MANAGER AND COSTCO'S CONSTRUCTION MANAGER, FOR CLARIFICATION. ANY REMEDIAL <br />WORK REQUIRED AS A RESULT OF NOT FOLLOWING THESE PROCEDURES SHALL NOT ENTITLE THE GENERAL <br />CONTRACTOR OR ELECTRICAL CONTRACTOR TO ANY ADDITIONAL COMPENSATION. <br />3. ALL WIRING FOR CIRCUITS TERMINATING 75'OR MORE FROM PANEL SHALL BE SIZED NOT LESS THAN #10 AWG. <br />4. ALL ELECTRICAL EQUIPMENT AND RECEPTACLES SHALL HAVE GROUNDED TYPE SERVICES. <br />5. ALL CONDUCTORS SHALL BE COPPER. <br />6. ALL CONDUCTORS ABOVE SIZE #6 SHALL BE THW. <br />7. ALL NEW CIRCUITS SHALL BE RUN OVERHEAD UNLESS NOTED OR INDICATED OTHERWISE, <br />8. ELECTRICAL CONTRACTOR MAY REUSE EXISTING ELECTRICAL STUB -UPS IF FOUND TO BE ACCEPTABLE SIZE AND <br />LOCATION. <br />9. ALL ELECTRICAL WORK SHALL CONFORM TO CODES. <br />10. ELECTRICAL CONTRACTOR TO FIELD CONFIRM LOCATION AND USE OF ALL CIRCUITS IN REVISED PANELS, PROVIDE <br />NEW TYPED DIRECTORIES IDENTITING ALL. CIRCUITS IN ALL PANELS, PROVIDE IDENTIFICATION ON ALL NEW <br />DISCONNECT SWITCHES, CONTACTORS, ETC. DYMO TYPE "STICK ON" LABELS ARE NOT ACCEPTABLE. REPLACE ANY <br />MISSING OR LOOSE COVERS. <br />11. ANY ELECTRICAL WORK WHICH SHALL INTERFERE WITH NORMAL OPERATION SHALL BE DONE AFTER <br />STORE HOURS, <br />12, ELECTRICAL CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL SERVICE TO REFRIGERATION UNITS AND OTHER <br />AREAS OF WORK AS NECESSARY. <br />13. REFRIGERATION RACK ANWOR CONDENSER UNIT DESIGNATIONS ARE FOR REFERENCE ONLY. EXACT LOCATION AND <br />ORIENTATION SHALL BE FIELD VERIFIED PRIOR TO PERFORMING WORK. <br />14. REFER TO THE ARCHITECTURAL DEMOLITION SHEET DI FOR ADDITIONAL WORK BY THIS CONTRACTOR. <br />15. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT, J-BOXES AND CABLES AS REQUIRED FOR <br />REFRIGERATION/EMS CONTROL INCLUDING LEAK DETECTION SYSTEM. SEE REFRIGERATION AND EMS DRAWINGS <br />FOR CONDUIT ROUTING AND CABLE TYPE/SIZES. PROVIDE SUFFICIENT SLACK CONDUCTOR AT EACH END FOR <br />TERMINATION BY OTHERS. CONDUIT TO BE ROUTED TO BAR JOIST HEIGHT, THEN HOMERUN, PROVIDE A <br />COMPLETE RACEWAY SYSTEM FOR ALL LOW VOLTAGE CABLES. <br />16. PLANS AND INSTALLATION SHALL COMPLY WITH THE 2016 SAN FRANCISCO ELECTRICAL CODE AND 2016 <br />CALIFORNIA ELECTRICAL CODE, <br />17. ELECTRICAL EQUIPMENT SHALL BE LISTED BY A CITY AND COUNTY OF SAN FRANCISCO RECOGNIZED <br />ELECTRICAL TESTING LABORATORY OR APPROVED BY DBI. <br />18. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED <br />WITHIN THE DEDICATED SPACE ABOVE THE NEW ELECTRICAL EQUIPMENT (1 10.26(E)(1)). <br />19. PROVIDE AND MAINTAIN REQUIRED WORK SPACE, ADEQUATE ILLUMINATION, ACCESS TO WORK SPACE AND <br />HEAD ROOM ABOUT ELECTRICAL EQUIPMENT (110,26). <br />EXISTING 'MSB' (ELEC MEZZ IN RECEIVING DOCK AREA) <br />EXISTING'MSB' (ELEC MEZZ IN RECEIVING DOCK AREA) <br />2500A, 480/277V, 3P, 4W <br />---- --------- - <br />2500A, 480/277V, 3P, 4W <br />0 0 T ------- <br />(E) <br />----- <br />-- --- <br />(E) <br />r <br />— — ------- <br />2500A/3P <br />250OA/3P <br />6 (E) <br />(E) <br />(E) (E) <br />(E) <br />(E) <br />G (E) <br />(E) <br />(E) <br />(E) <br />(E) <br />0 <br />(E) (E) <br />(E) <br />(E) <br />(E) (E) <br />(E) <br />(E) <br />(E) <br />200/3 <br />200/3 400/3 100/3 <br />600/3 <br />600/3 600/3 <br />600/3 <br />600/3 <br />c/ 400/3 <br />200/3 <br />200/3 400/3 <br />100/3 <br />600/3 <br />600/3 200/3 <br />200/3 <br />200/3 <br />200/3 <br />T <br />F <br />F <br />F <br />L. <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) <br />(E) (R) <br />(R) <br />(E) <br />(E) <br />(E) <br />PANEL <br />PANEL <br />PANEL <br />i <br />PANEL <br />PANEL <br />PANEL <br />PANEL <br />PAN EL <br />TRANSFORMER <br />PANEL <br />PANEL <br />PANEL <br />PANEL PANEL <br />PANEL <br />I <br />PANEL <br />TRANSFORMER <br />'Hl <br />H4l <br />'H2 <br />712' <br />H5 <br />HT <br />HT <br />'H6 <br />71 <br />Hl' <br />'H4' <br />H2 <br />'H5' <br />'HT <br />HT <br />Hrl <br />i71' <br />I <br />3` <br />(E) <br />(R) <br />(E) <br />- <br />--- _--I (R) <br />480-1201208 <br />480-120/208 <br />STEP-DOWN' <br />STEP-DOWN <br />TRANSFORIMER <br />'TRANSFORMER <br />71' <br />II <br />EXISTING 'SD2' (ELECTRICAL MEZZANINE) <br />RELOCATED 'SD2'(NEW <br />ELECTRICAL MEZZANINE) <br />1 OOOA, 120/208V, 3P, 4W <br />1 OOOA, 120/2908V, 3P, 4W <br />F <br />---- ------- ---- <br />(E) <br />1000A <br />1000A <br />6 <br />MCA 200A/3P <br />200A13P <br />200A/3P <br />0-1 <br />400Av13P <br />1 40OA/3P <br />150A/3P <br />MCB <br />C (E) (E) <br />(E) <br />(E) <br />(E) <br />I <br />20OA/3P 20OA/3P <br />I! <br />20OA/3P <br />40OA/3P <br />400A/3P <br />150,AJ3P <br />r <br />(E) (E) <br />(E) <br />(E) (E) <br />(E) <br />(R) <br />(R) <br />(R) <br />(R (R) <br />(R) <br />PANEL PANEL <br />PANEL <br />PANEL PANEL <br />(E) <br />'BAKERY <br />I <br />PANEL <br />PANEL <br />PANEL <br />PANEL PANEL <br />'BAKERY <br />lPT p5l <br />'Pill <br />IP3-11 'P3-2' <br />i <br />'Rg' I <br />DISHWASHER'; <br />i 'PT <br />-- - - ------- <br />'PT <br />'Pill <br />'P3-1' 'P3-2' <br />DISHWASHER'! <br />P-A-RTIAL EXISTING ONE-LA_GRAM <br />DEMOLITION <br />www.ctagroup.com <br />800.757.9522 <br />EX'iRES� P2 NOW 2C19't <br />0- 2013 1 ALL RIGHTS RESERVED <br />12.14.2018 <br />DRAWN BY 1 RANSOM <br />PARTIAL EXISTING ONE -LINE DIAGRAM CHECKED BY I GLASSING <br />KIMAI 1 - CITY COMMENTS 08.08.2018 <br />2 - CITY C01MINIENTS 08.29.2018 <br />3 - CITY COMMENTS 09. 14.2018 <br />ELECTRICAL <br />PANEL <br />SCHEDULES & <br />ONE -LINE <br />DIAGRAM <br />L:\COSTCO\0114Everett, 4'VA\Bit),ICAD'EleckOI14—EOOI,ONELINEDETAILS.D\PIG <br />E001 <br />