Laserfiche WebLink
EXIST. <br />STORAGE <br />EXIST, <br />TRANS. <br />— <br />(D) <br />——— — — — — — — — ------ ( 1 <br />-- <br />EXIST. <br />1 <br />J(D) <br />- RECEIVING <br />R COUNTE <br />- <br />;- <br />FH. <br />- DEMO <br />i <br />i <br />3 <br />; <br />EXIST. <br />r, <br />RECEIVING <br />zl <br />{ <br />I, <br />4 <br />5 <br />- - <br />� <br />; <br />I <br />I <br />/ <br />I <br />f <br />P7 <br />P5 <br />LCC <br />P3-2 <br />P3-1 <br />SD2 <br />rJ t4 <br />DEMOLITION PLAN <br />El00 — ----- 1/8"=1'-01, <br />GENERAL DEMOL-1-ITIO.-N NOTES <br />1. CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND PHASING WITH THE <br />GENERAL CONTRACTOR PRIOR TO START OF WORK. <br />2. CONTRACTOR SHALL DISCONNECT ELECTRICAL POWER TO FACILITATE REMOVAL <br />OF EQUIPMENT BY OTHERS. COORDINATE WITH ALL TRADES TO ASSIST IN <br />DISCONNECTION OF ELECTRICAL SERVICES INCLUDING DATA, TELEPHONE AND <br />SOUND SYSTEM. <br />3. THE CONTRACTOR SHALL REMOVE ALL ITEMS WHICH ARE NOT RE -USED. THIS <br />INCLUDES BUT IS NOT LIMITED TO CONDUIT, BOXES, FITTINGS, WIRE, TELEPHONE <br />CABLE, EQUIPMENT, ETC. IN ADDITION, THE CONTRACTOR SHALL PERFORM ALL <br />WORK NECESSARY WHICH IS ATTENDANT TO THE DEMOLITION OF THE EXISTING <br />WALLS, EXCEPT AS SPECIFICALLY NOTED OTHERWISE. ALL ITEMS WHICH ARE NOT <br />RE -USED SHALL BE REMOVED FROM THE SITE (OR TURNED OVER TO OWNER, AT <br />OWNER'S SOLE OPTION). <br />DEMPLITION NOTES <br />COOLER BOX TO BE DEMOLISHED. REMOVE ALL DEVICES, LIGHT FIXTURES, SPEAKERS ETC. REMOVE ALL <br />ASSOCIATED CONDUIT AND CONDUCTORS BACK TO JUNCTION BOX AT CEILING AND PREPARE FOR <br />TEMPORARY/FUTURE RE -USE. ALL UNDERGROUND CONDUITS NOT RE -USED SHALL BE CUT BELOW SLAB <br />AND FILLED WITH NON -SHRINK GROUT. <br />2 REMOVE EXISTING LIGHT FIXTURE(S). SEE ELECTRICAL LIGHTING PLANS FOR (R) RELOCATED AND <br />EXISTING LIGHT FIXTURES TO REMAIN. <br />EXISTING DEPARTMENT SHALL REMAIN OPERATIONAL DURING CONSTRUCTION OF NEW DEPARTMENT. <br />CONTRACTOR SHALL COORDINATE PHASING WITH GENERAL CONTRACTOR PRIOR TO WORK. <br />DISCONNECT EXISTING MECHANICAL/REFRIGERATION EQUIPMENT. COORDINATE SPECIFIC POWER AND <br />CONTROL REQUIREMENTS WITH RESPECTIVE INSTALLING CONTRACTOR. SEE GENERAL NOTE FOR RE -USE <br />OF EXISTING CONDUIT STUB -UPS. <br />( 5) EXISTING ELECTRICAL PANEL TO BE RELOCATED. DISCONNECT ALL EXISTING CIRCUITS AND TERMINATE IN <br />NEW PULLBOX, SIZED AS REQUIRED, ABOVE SPACE. SEE POWER PLANS FOR NEW LOCATIONS. SEE <br />GENERAL NOTE FOR RE -USE OF EXISTING CONDUIT STUB -UPS. <br />CUSHIN <br />TERRELL <br />ARCHITECTS ENGINEERS <br />www.ctagroup.com <br />800.757.9522 <br />0 2018 1 ALL RIGHTS RESERVED <br />12.14.2018 <br />DRAWN BY I RANSOM <br />CHECKED BY I GLASSING <br />REVISIONS <br />LACOSTC0\0114 Everett, WA\BIMCAD\Efec\0114_E100 DEMOLITION_DWG <br />