Laserfiche WebLink
lie <br />I GENERAL NOTES I SHEET INDEX I PROJECT TEAM I <br />1. THESE GENERAL NOTES PERTAIN TO WORK DESCRIBED ON ALL CONTRACT DOCUMENTS. <br />2. THE CONTRACT DOCUMENTS CONSIST OF THE OWNER CONTRACTOR AGREEMENT, THE CONDITIONS OF CONTRACT <br />(GENERAL, SUPPLEMENTARY, AND OTHER CONDITIONS), THE DRAWINGS, THE SPECIFICATIONS, AND ALL ADDENDA ISSUED <br />PRIOR TO AND ALL MODIFICATIONS ISSUED AFTER EXECUTION OF THE CONTRACT. <br />3. CONCEPT ARCHITECTURE, LLC IS THE AUTHOR OF THESE PLANS AND CLAIMS A COPYRIGHT IN THESE PLANS AND THE <br />DESIGNS CONTAINED IN THESE PLANS. THIS CLAIM IS MADE UNDER TITLE 17 OF THE UNITED STATES CODE AND ALL APPLICABLE <br />TREATIES AND FOREIGN LAWS. THESE COPYRIGHTED DRAWING FILES ARE TO BE USED FOR REFERENCE ONLY. CONCEPT <br />ARCHITECTURE, LLC WILL TAKE NO RESPONSIBILITY FOR ANY CHANGES MADE TO THESE DOCUMENTS BY ANOTHER PARTY AND <br />NO LICENSE IS GIVEN FOR TRANSFER OF THESE COPYRIGHTS TO ANOTHER PARTY. <br />4. THE WORK COMPRISES THE COMPLETED CONSTRUCTION REQUIRED BY THE CONTRACT DOCUMENTS AND INCLUDES ALL <br />LABOR NECESSARY TO PRODUCE SUCH CONSTRUCTION, AND ALL MATERIALS AND EQUIPMENT INCORPORATED OR TO BE <br />INCORPORATED IN SUCH CONSTRUCTION, <br />5. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES ARE NOT A PART OF THE CONTRACT DOCUMENTS. THE ARCHITECT WILL <br />REVIEW THEM, BUT ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE WORK AND WITH THE INFORMATION GIVEN <br />IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ANY DEVIATION FROM <br />THE REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE ARCHITECTS REVIEW OF SHOP DRAWINGS, PRODUCT DATA OR <br />SAMPLES. <br />6. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT DOCUMENTS AND SHALL AT ONCE REPORT TO <br />THE ARCHITECT ANY ERROR, INCONSISTENCY OR OMISSIONS HE MAY DISCOVER. THE CONTRACTOR SHALL PERFORM NO <br />PORTION OF THE WORK AT ANY TIME WITHOUT CONTRACT DOCUMENTS OR, WHERE REQUIRED, APPROVED SHOP DRAWINGS, <br />PRODUCT DATA OR SAMPLES FOR SUCH PORTION OF THE WORK, <br />7. ALL WORK IS TO CONFORM WITH THE CONTRACT DOCUMENTS. DRAWINGS ARE NOT TO BE SCALED FOR INFORMATION IF <br />UNABLE TO LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT WITH THE ARCHITECT BEFORE PROCEEDING WITH <br />CONSTRUCTION. <br />8. IN THE EVENT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE CONTRACT DOCUMENTS, THEN <br />THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR <br />AND SHALL BE REVIEWED BY THE ARCHITECT. <br />9. ALL WORK SHALL BE PERFORMED WITHIN STRICT CONFORMANCE TO THE MINIMUM STANDARDS OF THE CURRENT EDITION <br />OF THE INTERNATIONAL BUILDING CODE AND ALL APPLICABLE NATIONAL, STATE, AND LOCAL LAWS, REGULATIONS AND <br />ORDINANCES. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL SAFETY DURING CONSTRUCTION, AND ALL WORK SHALL <br />CONFORM TO PERTINENT SAFETY REGULATIONS. <br />11. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ANY AND ALL MECHANICAL, TELEPHONE, ELECTRICAL, LIGHTING AND <br />PLUMBING INCLUDING ALL PIPING, DUCT WORK AND CONDUIT. COORDINATE ALL REQUIRED CLEARANCES FOR INSTALLATION <br />AND MAINTENANCE OF THE ABOVE EQUIPMENT. <br />12. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HIS/HER BEST SKILL AND ATTENTION, HE/SHE SHALL BE <br />SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR <br />COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND OMISSIONS OF HIS/HER EMPLOYEES, SUBCONTRACTORS <br />AND THEIR AGENTS AND EMPLOYEES, AND OTHER PERSONS PERFORMING ANY WORK UNDER A CONTRACT WITH THE <br />CONTRACTOR. <br />14. THE CONTRACTOR SHALL PURSUE WORK IN A CONTINUOUS AND DILIGENT MANNER TO INSURE TIMELY COMPLETION OF THE <br />PROJECT. <br />15. THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR <br />RUBBISH CAUSED BY HIS/HER OPERATIONS. AT THE COMPLETION OF THE WORK, HE/SHE SHALL REMOVE ALL HIS/HER WASTE <br />MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT AS WELL AS ALL HIS/HER TOOLS, CONSTRUCTION EQUIPMENT, <br />MACHINERY, AND SURPLUS MATERIALS. <br />16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND/OR PROTECTION OF ALL EXISTING AND PROPOSED <br />PIPING, UTILITIES, STRUCTURES, ADJACENT STREETS; AND IMPROVEMENTS DURING THE PERIOD OF CONSTRUCTION. <br />17. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL <br />LABOR, MATERIAL, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, WATER, HEAT, UTILITIES, TRANSPORTATION, <br />AND OTHER FACILITIES AND SERVICES NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. <br />18. WHERE CONFLICTS OCCUR, COORDINATE THE LAYOUT AND EXACT LOCATION OF ALL PARTITIONS, DOORS, TELEPHONES <br />AND ELECTRICAL/COMMUNICATION OUTLETS AND SWITCHES WITH ARCHITECT IN THE FIELD BEFORE PROCEEDING WITH <br />CONSTRUCTION. <br />19. WHERE CONFLICT IS ENCOUNTERED BETWEEN THE CONTRACT DOCUMENTS THAT WILL MATERIALLY AFFECT THE QUALITY <br />OR EXTENT OF THE WORK, SUCH CONFLICT SHALL BE RESOLVED TO THE SATISFACTION OF THE ARCHITECT BEFORE THE <br />AFFECTED ITEMS AND/OR MATERIALS ARE PURCHASED, FABRICATED AND/OR INSTALLED. <br />20. WHERE PRE MANUFACTURED OR PREFABRICATED ITEMS AND/OR MATERIALS ARE TO BE INSTALLED - THE CONTRACTOR <br />SHALL VERIFY ROUGH OR FINISHED DIMENSIONS IN THE FIELD PRIOR TO PURCHASE OR FABRICATION. <br />21. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS TO BE FREE FROM DEFECTS FOR A MINIMUM OF ONE <br />YEAR FROM DATE OF FINAL ACCEPTANCE, AND PROMPTLY REMEDY SUCH DEFECTS AND ANY SUBSEQUENT DAMAGE CAUSED <br />BY THE DEFECTS OR REPAIR THEREOF, AT NO EXPENSE TO THE OWNER. GUARANTEE PERIODS OF GREATER THAN ONE YEAR <br />MAY BE REQUIRED AND CONTAINED WITHIN THE CONTRACT DOCUMENTS. <br />22. UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL SECURE AND PAY FOR THE <br />BUILDING PERMIT AND FOR ALL OTHER PERMITS AND GOVERNMENTAL FEES, LICENSES AND INSPECTIONS NECESSARY FOR THE <br />PROPER EXECUTION AND COMPLETION OF THE WORK. <br />23. WHERE ANY ITEM AND/OR MATERIAL IS INDICATED IN THE CONTRACT DOCUMENTS, AND NOT NECESSARILY DETAILED IN <br />EACH SPECIFIC CASE, BUT IS REQUIRED FOR A COMPLETE AND PROFESSIONAL INSTALLATION - SUCH ITEM AND/OR MATERIAL <br />SHALL BE PROVIDED AS IF SHOWN AND DETAILED IN FULL. PROVIDE MEANS TO FURNISH AND INSTALL. <br />CIVIL OWNER <br />C1.1 CIVIL TEOWDROS NEGASH GEBREHANNA <br />2105 JEFFERSON PL., EVERETT, WA 98203 <br />ARCHITECTURAL <br />A0.1 <br />TITLE SHEET <br />A1.1 <br />SITE PLAN <br />A2.0 <br />DEMOLITION PLAN <br />A2.1 <br />FLOOR PLAN <br />A2.3 <br />ROOF PLAN <br />A3.1 <br />ELEVATIONS <br />A3.2 <br />ELEVATIONS <br />A4.1 <br />BUILDING SECTIONS <br />A9.1 <br />DETAIL SHEET <br />E2.1 <br />ELECTRICAL PLAN <br />IP's_ANNING & CO IMIUNIT Y <br />EVELOP.P01E T DEPT. <br />y Ac <br />DAB T E 1 V1Z�2 <br />This approval only applies t0 <br />the work being performed uncle <br />Permit # 9 2-101 _001- <br />and does not recognize any <br />existing structure that may not <br />meet Zoning Code. <br />ARCHITECTURA <br />CONCEPT ARCHITECTURE, LLC. <br />2615 W. CASINO RD. SUITE 1A <br />EVERETT, WA 98204 <br />P: (425) 377-8786 <br />MREIMERS@CONCEPTARCHITECTURE.COM <br />OF <br />A�IICPAL, p s-r <br />FSF- <br />pliBLIC RI(S,ELECtv:vTR4CAL OR <br />SUPPR .Sb. qrRNIITS <br />PLU BIND P� <br />Additional Permits e r e: <br />For This Project Th. <br />1 Plumbing -0 Sp <br />AlarmL_'11 Mechanical 0 Fire <br />IE Electrical <br />NORTH ARROW <br />NORTH <br />PROPERTY <br />CORNER <br />F.' F. SPOT ELEVATION <br />LEVEL ELEVATION <br />0'-0" <br />2 BUILDING SECTION <br />A9.1 CUT <br />2 WALL SECTION CUT <br />A9.1 <br />2 DETAIL CALLOUT <br />A9.1 <br />(Jill <br />v <br />2 A9.1 4 ELEVATION BUBBLE <br />3 <br />NAME <br />ROOM NAME & <br />NUMBER <br />REVISION CLOUD & <br />NUMBER <br />TI. LE1CARPET CHANGE IN FLOOR <br />MATERIAL <br />A <br />�+ <br />GRID LINES <br />Smoke Detectors Required: <br />• in sash sleeping room, <br />• in each room giving access to a <br />• Int�r�rl���t�d, <br />• Harawirooa <br />SYMBOL LIST <br />CITY C' ' EVERETT <br />REVIEWED FOR PE <br />3 <br />WOOD FRAMING <br />ASPHALT <br />(THROUGH MEMBER) <br />WOOD FRAMING <br />(INTERRUPTED MEMBER) <br />BATT INSULATION <br />♦0+_0++ <br />CEILING HEIGHT <br />BRICK <br />12 <br />CMU BLOCK <br />3 � <br />ROOF SLOPE <br />ROOF SLOPE PLAN >- <br />CONCRETE <br />5.�-LOPE <br />3- 12 <br />DOOR SYMBOL - <br />E.I.F.S. <br />A �12 <br />- WINDOW SYMBOL - <br />GRADE / EARTH <br />12 <br />ACCESSORY SYMBOL <br />GRAVEL <br />GYPSUM BOARD <br />PROPOSED <br />CONTOUR LINE <br />72 EXISTING GYPSUM SHEATHING <br />CONTOUR LINE <br />ORIENTED STRAND <br />PROPERTY LINE BOARD <br />A MATCH LINE PLYWOOD SHEATHING <br />B <br />PH ---PH <br />G <br />G <br />E <br />E <br />X <br />X <br />SS <br />SS <br />TV <br />TV <br />W <br />W <br />CENTERLINE RIGID INSULATION <br />PHONE LINE SAND / MORTAR / <br />PLASTER <br />GAS LINE 7STEEL <br />ELECTRICAL LINE STONE <br />FENCE LINE TECTUM <br />SANITARY SEWER--_ WOOD FINISH <br />TELEVISION LINE <br />GLASS <br />WATER LINE <br />ADDRESS <br />2105 JEFFERSON PL., EVERETT, WA 98203 <br />APN <br />00512300000902 <br />SIZE <br />9,583 SF/.22 AC. <br />SUBDIVISION <br />MAYNARDS PLAT BLK 000 D-02 - E 15FT LOT <br />9 & ALL LOT 10 <br />ZONE <br />R-1 <br />DOM Mgt" 111MMW11:1 <br />i <br />THE PROJECT CONSISTS OF REMODELING AN EXISTING ADULT FAMILY HOME. <br />BASED ON THE FOLLOWING CODES: <br />2018 International Building Code <br />2018 International Residential Code <br />2018 International Mechanical Code <br />2018 Uniform Mechanical Code <br />2018 Uniform Plumbing Code <br />2018 National Electrical Code <br />2018 Washington Amendments <br />DEFERRED SUBMITTALS <br />OCCUPANCY GROUP <br />R3 <br />FLOOR AREA <br />2,251 S.F. <br />FULLY SPRINKLERED <br />NO <br />CONSTRUCTION TYPE <br />VB <br />� VICINITY MAP <br />�- PROJECT LOCATION <br />Permit#: <br />B2103-002 <br />Site Address: <br />2105 JEFFERSON PL <br />Owner: <br />GEBREHANNATEOWDROS NEGASH <br />Tenant: <br />TEO GEBREHANNA AFH <br />Appe Date: <br />3/1/2021 <br />Proposed Use: <br />RESIDENTIAL ALTERATIONS <br />Description: <br />REMODEL EXISTING AFH- <br />Reviewed By: <br />Office Set <br />Dater <br />hod Site Set Fire/Planning Set <br />W a <br />v <br />U <br />M3 <br />W <br />o~ <br />(p <br />' <br />a00 <br />Wo W <br />0, <br />> <br />Q1'Z <br />oa <br />y` <br />0Q0 <br />U <br />O3m <br />c�E <br />o <br />F- <br />(J7 - <br />c�z <br />w <br />UM <br />M� <br />U�W0 <br />_�SIW-N <br />d <br />r0 ' <br />F-af <br />QU) <br />(00Q <br />f� <br />tULL <br />a <br />Ce <br />a O <br />o� <br />S Ir <br />W o 3c <br />LL <br />00 ;. <br />C? �: I. <br />O a <br />;! <br />0 <br />w <br />i <br />()f <br />i! <br />W ,L_ <br />ao <br />z <br />�o <br />Y F- <br />IX V <br />oD <br />0 <br />I <br />0<a <br />� <br />I <br />i <br />w0 <br />w <br />vD <br />¢o <br />Q- <br />r„ o <br />�F <br />z=) <br />O Q <br />z <br />V � <br />w <br />w <br />a,L <br />F- O <br />09 <br />�d <br />z <br />a O <br />oF- <br />c� c� <br />O W <br />H O <br />U <br />UJ <br />W >-- <br />QO <br />a c> <br />Q <br />N <br />w0 <br />1 <br />= J <br />i +�,( <br />�� <br />! <br />I( Z <br />o v <br />I <br />I- <br />�_ <br />Z <br />~ <br />UJI <br />i �TT <br />ry <br />U)< <br />O ¢ <br />1 <br />W <br />z <br />W <br />W <br />� z <br />a <br />LLJ <br />CO <br />M <br />Z <br />w a <br />Lu <br />O <br />F_Q <br />W <br />r n <br />W <br />V <br />1- <br />IL <br />w <br />0 <br />W <br />0 <br />0 <br />t <br />W <br />0 <br />H <br />W <br />_ <br />U <br />co <br />z <br />O <br />Q <br />CO <br />W <br />a <br />W <br />Z <br />O <br />W <br />r <br />Z <br />uWi <br />m <br />o <br />N <br />0 <br />0 <br />N <br />W <br />O <br />N <br />Q <br />W <br />O <br />r <br />V <br />M <br />N <br />Ir- <br />it <br />W <br />O <br />m <br />6 <br />4 <br />0 <br />2 <br />N <br />< <br />U <br />