Laserfiche WebLink
-- —-- _ - - A PORTION OF SECTION 17, T 29 N, R 5 E, WM <br />y <br />r)/jj <br />! /I)Qjj/ <br />i <br />20 - - --- --- � - - <br />N87- TB' 2(FW <br />s <br />I <br />0 10 20 40 <br />STANDARD PRACTICE CODING SYSTEM: <br />CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMP'S AS SHOWN ON THIS PLAN <br />IN ACCORDANCE WITH DEPARTMENT OF ECOLOGY STORMWATER POLLUTION PREVENTION <br />REQUIREMENTS SUMMARIZED ON SHEET C4. IF BMP INSTALLATION AND MAINTENANCE IS <br />INADEQUATE TO MEET THESE REQUIREMENTS CONTRACTOR TO PROVIDE ADDITIONAL BMP'S AT NO <br />ADDITIONAL COST TO OWNER. <br />CODE BMPS <br />CF STABILIZED CONSTRUCTION ENTRANCE/EXIT <br />(D.O.E. BMP C105) <br />CL CLEARING LIMITS & HIGH VISIBILITY FENCE (D.O.E. BMP C103) <br />CLF CHAIN LINK CONSTRUCTION FENCE <br />DC DUST CONTROL (D.O.E. BMP C140) <br />IDS INTERCEPTOR SWALE W/ ROCK CHECK DAM (D.O.E. BMP C200) <br />IP CATCH BASIN/INLET SEDIMENT PROTECTION <br />(WSDOT STD PLAN 1-40.20-00 & D.O.E. BMP C220) <br />MU MULCH (D.O.E. BMP C121) <br />PC PLASTIC COVERING (D.O.E. BMP C123) <br />PS TEMPORARY & PERMANENT SEEDING (D.O.E. BMP C120) <br />SB SEDIMENT BASIN / TRAP (D.O.E. BMP C241) <br />SF TEMPORARY SILT FENCE (D.O.E. BMP C233) <br />EROSION CONTROL MONITORING PLAN: <br />1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END OF EACH DAY. <br />REPAIR AND OR REPLACE AS NECESSARY TO ASSURE PROPER FUNCTION. <br />2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY RAINFALL AND WET <br />WEATHER CONDITIONS. <br />3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES UNTIL CLUBHOUSE <br />CONSTRUCTION IS STARTED. MAKE REPAIRS AND/OR ALTERATION AS NECESSARY TO <br />PREVENT EROSION. <br />BEST MANAGEMENT PRACTICE SCHEDULE: <br />1. SCHEDULE TO ATTEND PRECONSTRUCTION CONFERENCE. <br />CONFERENCE TO INCLUDE A CERTIFIED EROSION CONTROL <br />SPECIALIST. <br />2. FIELD STAKE AND FLAG CLEARING LIMITS PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />3. INSTALL ORANGE FILTER FABRIC SILT FENCE PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. <br />5. CLEAR WITHIN FLAGGED LIMITS. <br />6. ROUGH GRADE ROADS AND LOTS TO STRUCTURAL SUBGRADE <br />ELEVATION (SG). SEE TYPICAL LOT GRADING SECTION ON <br />SHEET C4.1. <br />7. CONSTRUCT RAIN GARDENS <br />8. INSTALL SANITARY SEWER, STORM DRAINAGE AND WATER <br />SYSTEMS. INSTALL STORM DRAIN INLET PROTECTION ON CATCH <br />BASINS AS CONSTRUCTED TO CONTROL SEDIMENT FROM <br />ENTERING SYSTEM. <br />9. FINE GRADE PARKING LOT AND INSTALL PAVEMENT. SWEEP OR <br />WASH ROADWAYS EACH WORK DAY OF SEDIMENT THAT IS <br />TRACKED ON PAVEMENT. <br />10. INSTALL POWER, TELEPHONE, CABLE TELEVISION AND GAS <br />LINES. <br />11. CONSTRUCT SIDEWALKS. <br />12. GRADE TO FINISHED GRADE (FG) PER GRADING PLAN. MULCH <br />AND PERMANENT SEED AS GRADING IS COMPLETED. <br />13. REMOVE TEMPORARY EROSION CONTROL FACILITIES ONLY AFTER <br />ENTIRE SITE IS STABILIZED AND THE POTENTIAL FOR EROSION <br />HAS PASSED. <br />Z <br />_ F- <br />F— en <br />4 <br />Z Q <br />O <br />I- W <br />F- <br />W W <br />W � <br />w W <br />W <br />Z <br />N <br />o0 <br />tJ) co-4 <br />co <br />? �t <br />* <br />/ <br />� <br />W <br />m <br />co', <br />930 <br />>S <br />c� <br />IV <br />Q <br />w <br />o <br />9 z <br />N <br />4 <br />.- <br />•,D <br />DATE: AUGUST 28, 2017 <br />DESIGN: JNM <br />DRAWN: APDC <br />CHECKED: <br />REVISION <br />NUMBER: <br />--_- — — __ S8S' 41' 02"E _- <br />�_ _-.-- --- , -ih,4. 4---�'y�� PROJECT. APPROVAL FOR THIS 14. CLEAN AND FLUSH STORM DRAIN SYSTEM OF ALL SILT. DRAINING FILE: <br />_._ �-- �'P' Pao3ECT IS coNDlTso�aA1 PER <br />¢ 89.32 TRAFFIC CURREIIT,i�TY AN aRES <br />DS AND Ec-IM-002-RMCA0009.dwg <br />N PERMIT FOR <br />CONSTRUCTION HAS <br />CITY ENGINEER E <br />BN SSUED. UNLESS <br />r r <br />r•� <br />0 0 <br />Q <br />� <br />�o 0 <br />�co <br />SHEET NO. <br />C2 <br />OF <br />