Laserfiche WebLink
A PORTION OF SECTION 17, T 29 N, R 5 E, WM <br />GENERAL CONSTRUCTION NOTES <br />1. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT <br />STANDARDS AND STANDARD SPECIFICATIONS OF WDSOT/APWA. <br />2. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM <br />AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID <br />DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING <br />UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE <br />DISTRICT AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE <br />ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT. <br />3. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED OR PUT <br />INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED AND ACCEPTED. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN EASEMENTS <br />MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING <br />CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO <br />WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND OR WETLAND". <br />CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />6. CONTRACTOR TO PROVIDE STORM WATER BYPASS AS REQUIRED FOR <br />DEWATERING DURING CONSTRUCTION OF NEW SYSTEMS. NO DEWATERING TO <br />THE CITY SEWER SYSTEM IS ALLOWED. <br />7. CONTRACTOR TO OVEREXCAVATE AS NECESSARY TO PROVIDE STABLE <br />FOUNDATION FOR STRUCTURES. <br />8. WHERE TRENCH EXCAVATION EQUALS OR EXCEEDS A DEPTH OF 4 FEET, THE <br />CONTRACTOR SHALL PROVIDE, CONSTRUCT, MAINTAIN AND REMOVE , AS <br />REQUIRED, SAFETY SYSTEMS THAT MEET THE REQUIREMENTS OF THE <br />WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT, RCW 49.17, INCLUDING <br />WAC 296-155. <br />1 <br />9S, <br />�LF q�® O <br />,cam <br />R=25' MIN.___,/ <br />i <br />(OPTIONAL) 12" MIN. <br />4"-8" QUARRY SPALLS <br />PLACE GEOTEXTILE UNDER SPALLS <br />GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: <br />GRAB TENSILE STRENGTH (ASTM D-4751) = 200 PSI MIN <br />��G' <br />GRAB TENSILE ELONGATION ASTM D-4632) = 30% MIN <br />MULLEN BURST STRENGTH (ASTM D-3786-80a) = 400 PSI MIN <br />AOS (ASTM D-4751) = 20-45 (U.S. STD <br />SIEVE SIZE) <br />STABILIZED CONSTRUCTION ENTRANCE <br />NO SCALE <br />12% <br />'111" <br />V iGr" Opmings <br />12" X 12" CATCH BASIN WITH 2 OPENINGS (NDS PART NO. 1200 OR EQUIVALENT) <br />12" ATRIUM GRATE (NDS PART NO.1280 /1290 OR EQUIVALENT) <br />1- 4" UNIVERSAL OUTLET <br />1- 6" UNIVERSAL OUTLET <br />AREA DRAIN W/ ATRIUM GRATE DETAIL <br />REF: NDS PART NO.'S 1200 & 1280 <br />NO SCALE <br />ATTACH IN A MANNER THAT <br />ASSURES FABRIC IS FIRMLY <br />HELD BY THE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING <br />BACKUP SUPPORT <br />BACKFILLED & <br />COMPACTED <br />NATIVE SOIL - <br />BURY GEOTEXTILE <br />IN TRENCH <br />M <br />BEEHIVE GRATE <br />1" VENT HOLE WHEN <br />NOT CONNECTED TO CS <br />(COMBINED SEWER) --- <br />6" PVC <br />FACTORY TEE <br />FLOW <br />FROM RAIN GARDEN <br />IE= 105.00 <br />24" <br />0 <br />4� <br />I <br />to <br />TOP OF RAIN GARDEN <br />ELEV=109.50 <br />All <br />WS ELEV=309.00 '7 FREEBOARD <br />PONDING DEPTH <br />3 <br />BOTTOM OF CELL <br />ELEV=108.00 <br />6" PVC PLUG <br />24" <br />MAX <br />____4FLOW <br />TO COMBINED SEWER <br />ADAPTOR OR PIPE JOINT <br />6" PVC PIPE <br />SAND COLLAR OR COR-N-SEAL TYPICAL <br />6" PVC PIPE AS REQUIRED <br />TYPE 1L CB SEE STANDARD DRAWING 403 <br />FLOATABLE MATERIAL SEPARATOR & GAS TRAP <br />BASED ON C.O.E. STD. DWG 410 <br />NO SCALE <br />POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A lhilµ <br />FASTEN GEOTEXTILE TO <br />POST EVERY 6" IN O.C. <br />SELF-LOCKING TIE-NYLONE <br />6/6 (MIN GRADE) <br />120# MIN TENSILE STRENGTH, <br />UV STABILIZED <br />TEMPORARY SILT FENCE <br />PER C.O.E. STD. DWG 214 <br />NO SCALE <br />NOTES <br />5" MAX 1. Size the Below Inlet Grate Device (BIGD) for the storm water structure it <br />( "+` will service. <br />DRAINAGE GRATE --\ ( TRIM <br />- 2. The BIGD shall have a built-in high -flow relief system (overflow bypass). <br />GRATE FRAME ;` `\'' *`\' 3. The retrieval system must allow removal of the BIGD without spilling the <br />collected material. <br />r 4. Perform maintenance in accordance with Standard Specification 8-01.3(15). <br />SEDIMENT AND DEBRIS <br />OVERFLOW BYPASS <br />J <br />">,•�- ` "'-- BELOW INLET GRATE DEVICE DRAINAGE GRATE <br />RECTANGULAR GRATE SHOWN <br />RETRIEVAL SYSTEM <br />(TYP) <br />PLAN APPROVED <br />O <br />PUSLIC SERVICES A DATE <br />`618AInAGE EROSION PUBLIC WORKS <br />DE'PA,Q7", ENE <br />WATER <br />A PUBLIC WORKS PERMIT IS <br />REQUIRED PRIOR 'iO STARTING <br />ANY CONSTRUCTION GN THIS <br />PROJECT. APPROVAL FOR THIS <br />PR03ECT IS COh11,11TaDNAL PER <br />TRAFFIC CURRENT '. DS AND <br />EXPIRES Zg ^ UNLESS <br />PERMIT FOR CONSTRUCTION HAS <br />CITY ENGINEER BEEN ISSUED. <br />TYPICAL RAIN GARDEN PLANTING ZONES <br />PER RAIN GARDEN HANDBOOK FOR WESTERN WASHINGTON <br />NO SCALE <br />6"-12" TYPICAL <br />PONDING DEPTH <br />3HAV SIDE SLOPE MAX TYPICAL <br />CLEAN OUT SET CAP HIGHER <br />THAN MAX WATER LEVEL <br />1-21, MULCH <br />PLAN VIEW <br />20" X 24" <br />10" X 12" <br />jj <br />5/8"~I <br />20" X 24" <br />SECTION VIEW <br />BEEHIVE GRATE DETAIL <br />REF: OLYMPIC FOUNDARY PART NO. SM60BH <br />NO SCALE <br />BOTANICAL NAME <br />COMMON NAME <br />PLANTING ZONE <br />MATURE HEIGHT <br />PLANT SPACING <br />QUANTITY <br />JUNCUS ENSIFOLIUS <br />DAGGER LEAF RUSH <br />ZONE 1 <br />12" TO 18" <br />36" OC <br />15 <br />JUNCUS ACUMINATUS <br />TAPER TIPPED RUSH <br />ZONE 1 <br />6" TO 18" <br />24" OC <br />10 <br />IRIS TENAX <br />OREGON IRIS <br />ZONE 1 <br />12" TO 18" <br />12" OC <br />30 <br />TIARELLA TRIFOLIATA <br />FOAM FLOWER <br />ZONE 2 <br />12" <br />12" OC <br />30 <br />GEUM <br />AVENS <br />ZONE 2 & 3 <br />8" TO 20" <br />12" OC <br />30 <br />GERANIUM <br />CANTABRIGIENSE <br />BIOKOVO HARDY <br />GERANIUM <br />ZONE 2 & 3 <br />6" TO 8" <br />8" OC <br />60 <br />RAIN GARDEN PLANTING SCHEDULE <br />PLANTINGS <br />BERM AS NEEDED <br />COMPACTED NATIVE FILL <br />EXISTING GRADE <br />NOTES <br />DESIGN: <br />1. SEE THE RAIN GARDEN HANDBOOK FOR WESTERN <br />WASHINGTON FOR DESIGN AND PLANTING <br />INSTRUCTIONS. NATIVE PLANTS ARE PREFERRED, <br />BECAUSE NON-NATIVE AND INVASIVE SPECIES CAN <br />MOVE DOWNSTREAM AND DAMAGE HABITAT. IF <br />NON -NATIVES ARE CHOSEN, BE SURE THAT THEY <br />WILL NOT DAMAGE DOWNSTREAM HABITAT. <br />2. PROVIDE RAIN GARDEN INFORMATIVE SIGNS FOR <br />RAIN GARDEN ASSOCIATES WITH NEW <br />CONSTRUCTION. SIGNS ARE AVAILABLE FROM <br />PERMIT SERVICES. <br />3. MAINTENANCE AGREEMENTS ARE REQUIRED FOR <br />RAIN GARDEN INSTALLATION USED TO MEET <br />STORMWATER MINIMUM REQUIREMENTS. <br />VJ <br />(D <br />Z Z <br />H <br />o 0 <br />r F- <br />©( Q z <br />w LLS (9(/) <br />,Q z Q <br />06 W <br />W 0 <br />Z . O F-W <br />WW <br />M <br />Z D W <br />< j <br />V <br />v <br />Z <br />� <br />cav <br />m 0) <br />a <br />Z W <br />00 rn <br />> C: <br />a L5n <br />♦ ill <br />� 2 IC" Uy <br />\j <br />a, <br />t <br />� <br />C: <br /><t ni <br />a. <br />�w'a <br />z <br />N <br />ICI q <br />CD <br />v_ <br />�� ` / { .I I I II 1 I i 111il I I II II 1 lj: ) I {= 4 I 1 40L <br />I i=11 E I CI .Fl 1V I I I {III 1= .. DATE: AUGUST 28 2017 <br />FILTERED`' �� r r <br />— DESIGN: JNM <br />WATER`,` I-i I _I!r1 I I —III II I- it I I-11 I1�, --I If-1 I -1 I I—d I ICI I I `� '° CONSTRUCTION; <br />19 II 1 _ F171 I ( �-f I I EI i 111=-1 I I, I II 1= I I I 1 I I I~� f 1. BUILD AND VEGETATE RAIN GARDEN AS EARLY AS DRAIN: APDC <br />POSSIBLE TO ESTABLISH PLANTINGS BEFORE CHECKED: <br />Q —I —` ;f DIRECTING STORMWATER RUNOFF TO IT. <br />I I I I I C� III I I III I {" i EXCAVATE AT STABLE <br />I -I / SLOPE ANGLE FOR REVISION <br />} '. f 2 1 >_n: <br />~ - `wry y= —ate , _ . INFILTRATION AREAS (THE AREA OF THE RAIN <br />`f� NATIVE SOIL NUMBER: <br />w' ! 6' MIN <br />cc GARDEN AS DEFINED BY THE TOP ELEVATION OF THE <br />C � ,°„- / /, ` FACILITY) SHALL BE FENCED OFF FROM THE FIRST DAY SCALE: AS NOTED <br />to .. o " " "' /�'i/ rV,� ✓/ OF EARTH MOVING UNTIL PROJECT COMPLETION TO <br />E a� OVERFLOW BYPASS 1/2-3/a WASHED GRAVEL , �4 ` <br />? LL BELOW INLET GRATE DEVICE TYp AMENDED PLANTING 501E PREVENT COMPACTION OF THE SUBGRADE, DIRT <br />G ( ) CLEAN COARSE SAND �� � _ E ,�,1 � jv' ��.� �, � � - STOCKPILING OFTRACKING ANY LAYER OF THE CONSTRUCTIONMA AGILITY AND <br />20 (WSDOT STD SPEC 9-03.13) E`i\ 13i° . MATERIALS THAT PROJECT NUMBER: <br />Z�lQ d 6" MI TYPE �� SEE FLOATABLE MATERIAL SEL CB WITH BEEHIVE PARATOR MAY CLOG THE SURFACE.CL <br />RMCAOOVO 0009 <br />UNIFORMLY GRADED & GAS TRAP DETAIL ABOVE 3. DURING EXCAVATION OF NATIVE SOILS TO THE <br />S+ ` MIN SUMP DEPTH <br />CO m � �, � STORAGE ROCK <br />NON -PERFORATED OVERFLOW BOTTOM OF THE FACILITY, RAINFALL MAY CAUSE <br />OR EQUIVALENT) <br />STD SPEC 9 03.12(S) PIPE DIRECTED TO APPROVED DISPOSAL POINT FINES TO CLOG THE SURFACE OF THE FACILITY. IF THE <br />ISOMETRIC VIEW OR EQUIVALENT) NATIVE SOIL HAS BEEN EXPOSED TO RAINFALL, HAND DRAWING FILE: <br />RAKE THE SURFACE TO A DEPTH OF 3" TO RESTORE Ec—IM-004—RMCA0009.dwg <br />Q d UNDISTURBED NATIVE INFILTRATION CAPACITY. <br />m t° SECTION VIEW SUBGRADE 3" DEPTH 3/4 DRAIN ROCK, OPT <br />e'- r <br />� >o <br />0000 <br />N <br />00.0 <br />COMPACTED NATIVE SUBGRADE 4. DURING AREA DRAIN INSTALLATION, DISTURB NATIVE SHEET j1t{j, <br />6" PERFORATED PVC PIPE, SOILS AS LITTLE AS POSSIBLE. <br />STORM DRAIN INLET PROTECTION=°°°°° <br />REF: WSDOT STD PLAN 1-40.20-00 RAIN GARDEN WITH UNDERDRAIN C4 <br />NO SCALE <br />BASED ON C.O.E. STD. DWG 427 OF 4 <br />a NO SCALE <br />