My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
859 LOCUST ST 2017 Plans 2022-12-27 (3)
>
Address Records
>
LOCUST ST
>
859
>
Plans
>
859 LOCUST ST 2017 Plans 2022-12-27 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 10:43:10 AM
Creation date
6/23/2022 9:01:35 AM
Metadata
Fields
Template:
Address Document
Street Name
LOCUST ST
Street Number
859
Permit
PW1707-006
Year
2017
Notes
NEW COMMUNITY CLUBHOUSE - GRANDVIEW APTS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61 <br />0 <br />0 <br />d <br />U <br />ry <br />N <br />0 <br />0 <br />z <br />0 <br />U <br />z <br />0 <br />U <br />w <br />w <br />c0- <br />cu <br />0 <br />0 <br />U <br />a¢ <br />mm <br />I 87 A PORTION OF SECTION 17, T 29 N, R 5 E, WM <br />----- — --- 123`0s <br />N87° 18' 2s"w <br />8'� NORTH <br />0 10 20 40 <br />STANDARD PRACTICE CODING SYSTEM: <br />CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMPS AS SHOWN ON THIS PLAN <br />BE SAWCUT IN ACCORDANCE WITH DEPARTMENT OF ECOLOGY STORMWATER POLLUTION PREVENTION <br />REQUIREMENTS SUMMARIZED ON SHEET C4. IF BMP INSTALLATION AND MAINTENANCE IS <br />INADEQUATE TO MEET THESE REQUIREMENTS CONTRACTOR TO PROVIDE ADDITIONAL BMPS AT NO <br />ADDITIONAL COST TO OWNER. <br />_ITIES, INCLUDING <br />3 LINES. <br />YORS. <br />TIES. <br />CODE M <br />CB STABILIZED CONSTRUCTION ENTRANCE/EXIT <br />(D.O.E. BMP C105) <br />CL CLEARING LIMITS & HIGH VISIBILITY FENCE (D.O.E. BMP C103) <br />CLF CHAIN LINK CONSTRUCTION FENCE <br />DC DUST CONTROL (D.O.E. BMP C140) <br />IDS INTERCEPTOR SWALE W/ ROCK CHECK DAM (D.O.E. BMP C200) <br />IP CATCH BASIN/INLET SEDIMENT PROTECTION <br />(WSDOT STD PLAN 1-40.20-00 & D.O.E. BMP C220) <br />MU MULCH (D.O.E. BMP C121) <br />PC PLASTIC COVERING (D.O.E. BMP C123) <br />PS TEMPORARY & PERMANENT SEEDING (D.O.E. BMP C120) <br />SB SEDIMENT BASIN / TRAP (D.O.E. BMP C241) <br />SF TEMPORARY SILT FENCE (D.O.E. BMP C233) <br />EROSION CONTROL MONITORING PLAN: <br />1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END OF EACH DAY. <br />REPAIR AND OR REPLACE AS NECESSARY TO ASSURE PROPER FUNCTION. <br />2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY RAINFALL AND WET <br />WEATHER CONDITIONS. <br />3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES UNTIL CLUBHOUSE <br />CONSTRUCTION IS STARTED. MAKE REPAIRS AND/OR ALTERATION AS NECESSARY TO <br />PREVENT EROSION. <br />BEST MANAGEMENT PRACTICE SCHEDULE: <br />1. SCHEDULE TO ATTEND PRECONSTRUCTION CONFERENCE. <br />CONFERENCE TO INCLUDE A CERTIFIED EROSION CONTROL <br />SPECIALIST. <br />2. FIELD STAKE AND FLAG CLEARING LIMITS PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />3. INSTALL ORANGE FILTER FABRIC SILT FENCE PRIOR TO <br />COMMENCEMENT OF CONSTRUCTION. <br />4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. <br />5. CLEAR WITHIN FLAGGED LIMITS. <br />6. ROUGH GRADE ROADS AND LOTS TO STRUCTURAL SUBGRADE <br />ELEVATION (SG). SEE TYPICAL LOT GRADING SECTION ON <br />SHEET C4.1. <br />7. CONSTRUCT RAIN GARDENS <br />8. INSTALL SANITARY SEWER, STORM DRAINAGE AND WATER <br />SYSTEMS. INSTALL STORM DRAIN INLET PROTECTION ON CATCH <br />BASINS AS CONSTRUCTED TO CONTROL SEDIMENT FROM <br />ENTERING SYSTEM. <br />9. FINE GRADE PARKING LOT AND INSTALL PAVEMENT. SWEEP OR <br />WASH ROADWAYS EACH WORK DAY OF SEDIMENT THAT IS <br />TRACKED ON PAVEMENT. <br />10. INSTALL POWER, TELEPHONE, CABLE TELEVISION AND GAS <br />LINES. <br />VJ <br />�- V <br />z z <br />w — <br />z � cj� ry Oo <br />J ry Q -r (D <br />— <br />Q O < z <br />W 0. � Z Cn <br />o w U)� <br />06 3: u) o �w <br />W �w <br />0 w <br />w > m w> <br />z � w <br />J <br />V <br />V <br />0 <br />0 <br />N <br />N <br />fA 64 cb <br />•` C <br />0 too, <br />�F <br />>' <br />�a) <br />a) .cu <br />a, <br />�W <br />N <br />(Q <br />Tl- <br />REVISIONS: APPD. <br />DATE: MARCH, 2017 <br />DESIGN: JNM <br />DRAWN: APDC <br />CHECKED: <br />REVISION <br />NUMBER: <br />SCALE: 1 „=20' <br />PROJECT NUMBER: <br />RMCA0000-0009 <br />DRAWING FILE: <br />89.32 Ec-IM-002-RMCA0009.dwg <br />Q 0 , cd�6 <br />r 6 <br />c� <br />r0 <br />O N <br />N o) <br />Lo 't <br />— S88' 41' 02"E <br />11. CONSTRUCT SIDEWALKS. <br />12. GRADE TO FINISHED GRADE (FG) PER GRADING PLAN. MULCH <br />AND PERMANENT SEED AS GRADING IS COMPLETED. <br />13. REMOVE TEMPORARY EROSION CONTROL FACILITIES ONLY AFTER <br />ENTIRE SITE IS STABILIZED AND THE POTENTIAL FOR EROSION <br />HAS PASSED. <br />14. CLEAN AND FLUSH STORM DRAIN SYSTEM OF ALL SILT. <br />15� SHEET NO. <br />C2 <br />of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.