My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3302 MCDOUGALL AVE 2019 SNO VALLEY PROCESS SOLUTIONS Plans 2022-12-01
>
Address Records
>
MCDOUGALL AVE
>
3302
>
SNO VALLEY PROCESS SOLUTIONS
>
Plans
>
3302 MCDOUGALL AVE 2019 SNO VALLEY PROCESS SOLUTIONS Plans 2022-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 11:26:58 AM
Creation date
6/23/2022 9:27:50 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3302
Tenant Name
SNO VALLEY PROCESS SOLUTIONS
Permit
B1906-039
Year
2019
Notes
CONSTRUCT 2340SF WAREHOUSE ADDITION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />STOREFRONT: STOREFRONT FRAMING <br />AITH 1" INSULATED 6LA55 OR 1 <br />INSULATED SAFETY GLASS. SEE <br />H I NDON SCHEDULE. <br />-0 50 m5 it <br />®� o� PARAPET <br />} <br />TJI CONNECTION AT CMU <br />HALL PER STRUCTURAL <br />2-HR RATED CMU HALL <br />FURR HALL: " G E3 INSIDE FACE <br />o/VAR®R BARRIER HARM 5IDE ON b° <br />STUD WALL H/R-21 BATT I NW4AT I CN <br />N)I� I R GAR AND 2-HR RATED WU <br />MOCK MALL PER STURCTURAL 3 <br />ROOF: METAL ROOF ®/RIGID <br />INSULATION w/51EATHIN6 PER <br />STRUCTURAL ®/iJI RAFTERS <br />SIZING PER 5TRUCTURAL <br />FLOOR: SHEATHING PER <br />UCH --qL—.- <br />FL®CR JOISTS 5IZING <br />PER STRUCTURAL <br />SLAB: CNC E SLAB <br />TW I GiGN55 AND REBAR <br />5PAOINP AND SIZE PER <br />STRUCTURAL <br />FOUNDATION HALL: CONCRETE <br />FOOTING AND FOUNDATION <br />HALL 5IZE REINFORCEMENT <br />PER 5TRUCTURAL <br />i,nq_5ert i on <br />5GciIe: 1/4" = 1'-0" <br />E3uildinq 5ection <br />5r,ole: 1/4" ® 1'-0" <br />STOREFRONT: 5TOREFRONT FRAMING <br />HITH 1" INSULATED GLA55 OR 1" <br />s� INSULATED SAFETY GLASS. SEE <br />HINVON SCHEDULE. <br />1'®q" TOP <br />OF 5LAEB <br />oA <br />FOUNDATION HALL: CONCRETE <br />FOOTING AND FOUNDATION <br />HALL 5IZE REINFORCEMENT <br />PER STRUCTURAL <br />HALL SIZE REINFORCEMENT <br />PER STRUCTURAL <br />217 " -4 H ROOF: METAL ROOF ®/R I G I D <br />Top �� PARAPET <br />iJI CONNECT I ®N AT CMU I NSULAT I ®N H/51EATH I NG PER <br />HALL PER STRUCTURAL STRUCTURAL o/iJI RAFTERS <br />c� SLING PER STRUCTURAL <br />2-HR RATED CMU HALL <br />DOOR HEM :HEADER SIZING PER <br />STRUCTURAL EN61NEER <br />SLAB: CONCRETE SLAB <br />TH I CKNE55 AND REBAR <br />5RACIN6 AND SIZE PER <br />STRUCTURAL <br />�.g <br />FOUNDAT I CN HAL L : CONCRETE <br />FOOTING AND FOUNDATION <br />MALL SIZE REINFORCEMENT <br />PER STRUCTURAL <br />dui Idin <br />221®ill TOP <br />OF PLATE <br />EXTERIOR HALL: METAL 5IDIN6 PER <br />EL VATI®N ®/MOISTURE BARRIER <br />®/ HEATHING PER STRUCTURAL ON <br />LV /LSL ENGINEERED STUD w/R-21 <br />bXrr INSULATION VAPOR BARRIER <br />HAM 5IDE AND ° 6HB INSIDE FACE <br />i" `OP OF <br />SLAB <br />FOUNDATION HALL: CONCRETE <br />FOOTING AND FOUNDATION <br />HALL 5IZE REINFORCEMENT <br />PER STRUCTURAL <br />17 <br />1 <br />Lila <br />v <br />W <br />I� <br />IL! <br />I <br />W <br />W <br />Ito <br />e.LO <br />Lal f J � <br />Lo ( 3 <br />(WY �A <br />ro x <br />� v' <br />EvE <br />CD <br />q) <br />.5 <br />2 <br />0 0) <br />� <br />®gipp <br />�qq <br />Z® <br />o ryM9 <br />W <br />Drawing: <br />A4.1 <br />Job Number: <br />C/) <br />0 <br />1— <br />U <br />W <br />s <br />7 <br />y <br />0 <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.