Laserfiche WebLink
HOLD-DOWN <br />PER PLAN <br />BOUNDARY NAILING <br />PER S.W. SCHEDULE <br />— ANCHOR ROD <br />PER HOLD-DOWN <br />SCHEDULE <br />�3.5"X3.5"X4 <br />BEARING PLATE WASHER <br />TO SUIT HOLD-DOWN ROD <br />2 X RIM JOIST <br />DBL TOP PLATES <br />A35 CLIPS. SPACING <br />PER SHEAR WALL <br />16GA CONT. STRAP — TABLE ON S-3 <br />(NO SCALE) <br />NOTES: <br />1m INSTALL 2 X (.SAME DEPTH OF FRAMING) BLOCKING FOR SOLID FRAMING OR TJI BLOCKING (SAME <br />DEPTH OF FRAMING)® NAIL TO SHEATHING WITH 10d @ 4" O.C. <br />2® STRAP TO TIE BEAM TO BLOCKING SHALL BE INSTALLED ON TOP OF SHEATHING® <br />30 16 GA STRAP MAY BE SIMPSON WBI06 OR W13126, ETC. OR EQUAL. <br />6A <br />S-3.2 4'0 A307 BOLT @ <br />SUB -FLOOR PER PLAN 32" O.C. WITH <br />10 TEK @ 12" O.C. 0.190" THK WASHER <br />HEAD & NUT <br />TJI (TYP) <br />LEDGER PACK <br />6B <br />53.2 <br />(NO SCALE) <br />#10 TI <br />IUT I- <br />FULL DEPTH BLOCKING <br />A35 CLIPS. SPACING <br />PER SHEAR WALL <br />TABLE ON S-3 <br />DBL TOP PLATES <br />/--- 16GA CONT. STRAP <br />(NO SCALE) <br />NOTES: <br />1. INSTALL 2 X (SAME DEPTH OF FRAMING) BLOCKING FOR SOLID FRAMING OR T32 BLOCKING (SAME <br />DEPTH OF FRAMING). NAIL TO SHEATHING WITH 10d @ 4" O.C. <br />28 STRAP TO TIE BEAM TO BLOCKING SHALL BE INSTALLED ON TOP OF SHEATHING. <br />30 16 GA STRAP MAY BE SIMPSON WBI06 OR W13126, ETC, OR EQUAL, <br />(NO SCALE) <br />""" r` n""R PER PLAN <br />#10 TEK @ 12" O.C. <br />31ER <br />4'0 A307 BOLT @ <br />32" O.C. WITH <br />0.190" THK WASHER <br />HEAD & NUT <br />LEDGER ATTACHMENT <br />BOLT <br />0 A307 BOLTS (TYP) <br />0.190" THK WASHER (TYP) <br />FOUNDATION WALL $' 0 A307 BOLTS (TYP) <br />12" $" 0 A307 BOLTS (TYP) <br />a <br />6" <br />2I BM PER PLAN <br />I Filf�FR PA(:�{ <br />— (3) 2 X 12 & PLYWOOD <br />FILLER LEDGER PACK <br />BEAM PER PLAN <br />WOOD LEDGER ATTACHMENT DETAIL <br />111=21jimm <br />BM PER PLAN <br />1 /4 <br />(2) 2"0 A307 BOLTS <br />WOOD POST PER PLAN <br />10d@4"O.C. <br />STAGGER PF�,' "N' <br />(NO SCALE) <br />"n r' OOR PER PLAN <br />6l1.1Fil Mi I 611 I UrAl"l <br />��r'TYP WOOD BEAM CONNECTION DETAIL <br />so <br />LEDGER PACK <br />1 4 X BEAM TO WOOD POST CONNECTION <br />o <br />5 E <br />s <br />< � <br />Z <br />��n ° <br />Lo <br />a✓cam <br />CD <br />LLj <br />Lli <br />00 <br />6 <br />Lu <br />04 <br />C <br />� Ifs <br />I <br />I , I I <br />I <br />I <br />Lu <br />,® <br />I� <br />-I <br />