Laserfiche WebLink
THOMCO CONSTRUCTION, INC Summary <br /> COE Water Main V <br /> Date: <br /> TC# 30 <br /> Description of Work: <br /> 3-24-22 Pick up wire and meet with Phelix and Shane on site. <br /> Purchase telemetry wire,pick up wire in Tacoma(3-24-22),fabricate rollers to remove and install wire(3-30-22),remove wire,install <br /> mule tape and attempt to pull new wire through the conduit(4-12-22).Approximately 71'west from the handhold in front of Bucks the <br /> conduit is damaged and the new wire cannot be pulled though.A camera was fed into the conduit and could only make it 67'before <br /> the conduit was damaged enough that the camera head can't make it to where the wire is obstructed.COE decided city forces <br /> needed to repair the damaged conduit. <br /> LABOR 3-24-22 Rate/Hr • it ,/ , �� <br /> Scott Wilcox 2 Hrs 80.70 564.90 (� I. <br /> Pipe Laborer Lead Tyler Burnett 5 Hrs 62.18 64.90 <br /> LABOR 3-30-22 <br /> Pipe Laborer Lead Tyler Burnett 4 Hrs 62.18 <br /> LABOR 4-12-2; <br /> Scott Wilcox 7 Hrs 80.70 564.90 <br /> Laborer Jeremy Beyer 6 Hrs 60.39 362.34 <br /> Pipe Laborer Lead Tyler Burnett 7 Hrs 62.18 435.26 <br /> Total Labor Cost 3,057.20 <br /> MATERIALS <br /> Tacoma Wire 1 LS 2,315.66 2,315.66 <br /> Platt Electric#2R34889 1 LS 53.80 53.80 <br /> Platt Electric#2R54772 1 LS 199.29 199.29 <br /> Champion Bolt#744978 1 LS 37.28 37.28 <br /> Sub Total Material Cost 2,606.03 ' OJU 2�6 ( <br /> Tax on Materials ( .100 260.60 ‘,/ / <br /> Total \ .. 2,866.63 <br /> EQUIPMENT Hrs Units Rate/Hr Standby/Hr Amount <br /> 115 2018 Ford F150 Super Cab XLT SXT 4x, 7 Hrs $29.32 $205.24 <br /> 119 2012 Ford F350XLT 4x4 CC 6.7L Diesel Combined Hrs $48.72 $0.00 <br /> Total Equipment Cost 205.24 <br /> COST SUMMARY Z t 0 b$�� <br /> Labor <br /> Mark on Labor 29% -B66'str— it,U e <br /> Material .-2'440P63' Z ton GiO <br /> Mark up on Material 21% <br /> Material Use Tax 0.0% 0.00 S-t <br /> Equipment 205.24 <br /> Mark up on Equipment 21% 43.10 <br /> Total Costs Force Account 7,660.75 <br /> Total Costs Force Account 7,660.75 <br /> This work requires days be added to the contract <br />