Laserfiche WebLink
vi <br />Q 2018 THE BLUELINE GROUP <br />SW 714y SEC 9, TWP 29Nf RGE 5E, W.M. <br />UNDERGROUND UTILITY NOTE <br />UNDERGROUND U 77LI 77ES ARE SHOWN IN THE APPROXIMATE L OCA 770N. MERE IS <br />NO GUARANTEE THAT ALL U77LITY LINES ARE SHOWN, OR 774AT 774E LOCA770N, <br />SIZE AND MAMMAL IS ACCURAM ME CON7RACTOR SHALL UNCOVER ALL <br />INDICATED PIPING KNERE CROSSING, INTERFERENCES, OR CONNEC77ONS OCCUR <br />PRIOR TO 7RENCHING OR EXCA VA 77ON FOR ANY PIPE OR S7RUC7URES, TO <br />MERMINE ACTUAL LOCA77ONS, SIZE AND MAMMAL. THE CONTRACTOR SHALL <br />MAKE THE APPROPRIA7E PROVISION FOR PROTEC77ON OF SAID FACIL177ES. THE <br />CONTRACTOR SHALL N077FY ONE CALL AT 8-1-1 (WASHINGTON81I.COM) AND <br />ARRANGE FOR FIELD LOCA77ON OF EXIS77NG FACIL177ES BEFORE CONS7RUC770N. <br />BLUELINE <br />25 CENTRAL WAY, SUITE 400, <br />KIRKLAND, WA 98033 <br />P: 425.216.4051 F: 425.216A052 <br />WWW.THEBLUELINEGROUP.COM <br />SCALE <br />AS NOTED <br />PROJECT 1MANAGER: <br />CHRIS70PHER H. MILLER, PE <br />PROJECT ENGINEER: <br />JON MEPMEN, PE <br />DESIGNER: <br />DOMINQUE GABALDON <br />ISSUE DA TE.• <br />51412018 <br />En <br />z <br />cl <br />En <br />Lo <br />Z <br />Q. 41 <br />cn <br />En <br />Q, <br />ul <br />EnW <br />Q <br />Z <br />Z � <br />En <br />Z <br />� <br />La <br />o 41 <br />�.. <br />41 <br />'� <br />M <br />En� <br />Q� <br />, <br />Et Z <br />4 <br />4 <br />of WAsy <br />P co� <br />E Xp. <br />PSG <br />44NDSCApE <br />JOB NUMBER: <br />16-22B <br />J <br />SHEET NAME: <br />LE-02 <br />SHT <br />2 2 OF 24 <br />